STATE OF INDIANA |
) |
SS: |
BEFORE THE INDIANA DEPARTMENT OF |
||
|
) |
|
ENVIRONMENTAL MANAGEMENT |
||
COUNTY OF MARION |
) |
|
|
||
|
|||||
COMMISSIONER OF THE DEPARTMENT |
) |
|
|||
OF ENVIRONMENTAL MANAGEMENT, |
) |
||||
|
) |
||||
Complainant, |
) |
||||
|
) |
||||
v. |
) |
Case No. 2018-24966-W |
|||
|
) |
|
|||
Donald C.
Strong, Owner, |
) |
||||
Bearcreek
farms, and/or |
) |
||||
President, BEARCREEK FARMS, INC., |
) |
||||
|
) |
||||
Respondents. |
) |
||||
AGREED ORDER
Complainant and
Respondent desire to settle and compromise this action without hearing or
adjudication of any issue of fact or law, and consent to the entry of the
following Findings of Fact and Order. Pursuant to Indiana Code (IC) 13-30-3-3,
entry into the terms of this Agreed Order does not constitute an admission of
any violation contained herein. Respondent’s entry into this Agreed Order shall
not constitute a waiver of any defense, legal or equitable, which Respondent
may have in any future administrative or judicial proceeding, except a
proceeding to enforce this order.
I. FINDINGS OF FACT
1.
Complainant
is the Commissioner (Complainant) of the Indiana Department of Environmental
Management (IDEM), a department of the State of Indiana created by IC
13-13-1-1.
2.
Respondents
are Donald C. Strong, Owner, Bearcreek Farms, and/or President, Bearcreek
Farms, Inc. (Respondents). Respondents own and operate the Bearcreek Farms
Wastewater Treatment Plant (WWTP) that provides treatment for Bearcreek Farms
Family Resort and Entertainment Complex, located at 8341 N 400 E, Bryant, Jay
County, Indiana (the Site).
Subsequent
to the issuance of the Notice of Violation (NOV) on April 12, 2018, IDEM was
made aware that Bearcreek Farms Resort and Entertainment Complex was closed for
business in 2013. However, the WWTP has remained in continuous use for collection
and treatment of the wastewater from Richards Restaurant, Inc. commissary,
which is located at the Site.
On
May 17, 2018, IDEM confirmed that Richards Restaurant, Inc. is the sole owner
and/or operator of Bearcreek Farms WWTP, and issued the National Pollutant
Discharge Elimination System (NPDES) Permit, Number IN0050211 (the Permit) renewal
to Richards Restaurant, Inc. Therefore, for this enforcement action, Richards
Restaurant, Inc. is now named as sole Respondent and responsible party, and is
hereafter referred to as “Respondent”.
3.
Respondent
is authorized by the Permit to discharge 0.060 million gallons per day of
wastewater, treated in accordance with the terms and conditions of the Permit
from the WWTP into Bearcreek Ditch, identified as waters of the State, via
Outfall 001.
4.
IDEM
has jurisdiction over the parties and the subject matter of this action
pursuant to IC 13-30-3.
5.
Pursuant
to IC 13-30-3-3, on April 12, 2018, IDEM issued the NOV via Certified Mail to: Donald C. Strong, Owner, Bearcreek Farms,
and/or President, Bearcreek Farms, Inc.
6.
During
an investigation conducted by a representative of IDEM, violations were found
at the Site, as described below.
7.
Pursuant
to 327 Indiana Administrative Code (IAC) 5-2-8(1), the permittee shall comply
with all terms and condition of the Permit. Any permit noncompliance
constitutes a violation of the Clean Water Act and Indiana Code (IC) 13, and is
grounds for enforcement action by IDEM.
8.
Pursuant
to Part I.A.1 of the Permit, the permittee is required to comply with the
monitoring requirements contained in the Permit, including effluent
limitations.
Discharge
Monitoring Reports (DMRs) and Monthly Reports of Operation (MROs) submitted by
Respondent for the period of January 2015 through January 2018, and a
subsequent DMR review by IDEM staff for the period of February 2018 to
September 2018, indicates violations of effluent limitations contained in Part
I.A.1 of the Permit as follows:
A.
The
daily maximum average concentration limitation for total suspended solids (TSS)
was exceeded during August 2015, October 2016 and May 2018.
B.
The
monthly average concentration limitation for TSS was exceeded during August
2015, March 2016, and October 2016.
C.
The
daily maximum average concentration limitation for Ammonia (as Nitrogen) was
exceeded during June 2016.
D.
The
monthly average concentration limitation for Ammonia (as nitrogen) was exceeded
during February 2016 and June 2016.
E.
The
monthly average concentration limitation for Phosphorus was exceeded during
December 2015, January and February 2016, and June, July, August, September,
October, and November 2017, and March, April, May and June 2018.
F.
The
daily maximum concentration limitation for Escherichia coli (E. coli) was
exceeded during April, May, July, August, and September 2015, April and May
2016, and October 2017.
G.
The
monthly geometric mean limitation for E. coli was exceeded during April, May,
August, and September 2015.
H.
The
daily maximum average concentration limitation for the 5-day carbonaceous
biological oxygen demand (CBOD5) was exceeded during September 2016.
I.
The
monthly average concentration limitation for CBOD5 was exceeded
during September 2016.
Respondent
failed to comply with the effluent limitations from Outfall 001 contained in
the Permit, in violation of Part I.A.1 of the Permit.
9.
Pursuant
to Part II.B.1.b of the Permit, in accordance with 327 IAC 5-2-8(9), the
permittee shall operate the permitted facility in a manner which will minimize
upsets and discharges of excessive pollutants. The permittee shall properly
remove and dispose of all excess sludge.
Pursuant
to Part
II.B.4 of the Permit, solids, sludge, filter backwash and other pollutants
removed from or resulting from treatment or control of wastewaters shall be
disposed of in a manner such as to prevent any pollutant from such materials
from entering waters of the State and to be in compliance with all Indiana
statutes and regulations relative to liquid and/or solid waste disposal.
During
inspections conducted on June 8, 2015 and July 5, 2017, IDEM staff documented
that Respondent failed to operate and maintain the WWTP in a manner that
minimized upsets and discharges of excessive pollutants. Specifically, Respondent
failed to regularly remove and dispose of excessive sludge from the WWTP, and
from the lagoon, resulting in a high solids inventory throughout the WWTP, and
at the time of the inspections, solids appeared to be filling up the lagoon. Respondent
failed to remove the sludge that discharged from the WWTP to the lagoon, in
violation of 327 IAC 5-2-8(9), Part II.B.1.b and Part II.B.4 of the Permit.
10.
On June
26, 2015, and July 10, 2017, IDEM sent Inspection Summary Letters to Respondent
outlining violations at the WWTP. On August 26, 2014 and May 20, 2015, IDEM
sent Violations Letters to Respondent for noncompliance with Part I.D of the
Permit, which requires that the Permit holder to comply with all final
requirements of Schedule of Compliance for Phosphorus. The letters required a
response detailing actions taken to correct the violations. On August 23, 2017,
IDEM issued a No Response letter for Respondent’s failure to submit a timely
response to the July 10, 2017 Inspection Summary Letter. IDEM received
responses to the above noted letters explaining compliance actions Respondent
took or would take to address the violations. However, Respondent’s compliance
actions were inadequate or did not occur, and therefore, the violations noted
above continue at the WWTP.
11.
Subsequent
to the issuance of the NOV, Respondent has developed a compliance plan (CP) for
achieving continuous compliance with the Permit. The attached CP provides a
schedule of completion for the following actions that Respondent is required to
take to achieve and maintain compliance with the Permit:
A.
Assure
proper removal, storage, and disposal of sludge solids;
B.
Repair
and/or replace various portions of the sanitary sewer system in order to remove
sources of inflow and infiltration (I/I);
C.
Implement
a preventative maintenance program for WWTP equipment, and document all
maintenance (preventative and repair) in a permanent record;
D.
Implement
a preventative maintenance program for the sanitary sewer collection system,
which includes methods and milestone dates for locating and eliminating sources
of inflow and infiltration (I/I) in the sewer system;
E.
Comply
with reporting requirements of the Permit;
F.
Maintain
compliance with Phosphorus effluent limits contained in the Permit (necessary
action may include, but not be limited to, construction of an additional unit
to remove Phosphorus prior to wastewater discharge from the WWTP);
G.
Provide
an adequate operating staff, which is duly qualified to carry out the
operation, maintenance of the WWTP, and testing functions required to ensure
compliance with the conditions of the Permit; and
H.
Provide
adequate training specific to the WWTP employees’ job duties to ensure proper
operation and maintenance of the WWTP and the sewer system, which utilizes BMPs
in order to comply with the Permit, and all other applicable rules and
statutes, and ensure training records are maintained at the Site. (Training is
required to fulfill all certified operator continuing education requirements,
and shall occur at minimum of once annually).
12.
In recognition
of the settlement reached, Respondent waive any right to administrative and
judicial review of this Agreed Order.
II. ORDER
1.
This
Agreed Order shall be effective (Effective Date) when it is adopted by
Complainant or Complainant’s delegate (as evidenced by signature), and the
adopted Agreed Order has been received by Respondent. This Agreed Order shall
have no force or effect until the Effective Date. In addition to addressing the
violations cited in Paragraphs 8 and 9 of the Findings of Fact above, this
Agreed Order also addresses any additional violations of these same rules that
may have occurred subsequent to the issuance of the Notice of Violation, and
prior to the Effective Date.
2.
Respondent
shall comply with environmental rules, statutes, and permit conditions listed
in the findings above at issue.
3.
The CP set forth in
Attachment A, and outlined in Findings of Fact Paragraph 11, is hereby
incorporated into this Agreed Order and deemed an enforceable part thereof.
Respondent shall immediately implement the Compliance Plan, and adhere to the
milestone dates contained therein.
Upon becoming aware that it may be unable to complete a
project or task listed in the Compliance Plan by the milestone completion date
specified therein, Respondent shall notify IDEM in writing. The written
notification shall include the following:
A. A
description of the project/task and associated milestone completion date that
Respondent anticipates an inability to meet;
B. The
reason(s) that Respondent anticipates that it will be unable to meet the
milestone completion date; and
C. The date
by which the project/task will be completed.
Respondent may include in the written notification a
request that the CP be modified to extend a milestone completion date, for a
specified amount of time. The submittal of a written request for modification
of the CP to extend a milestone completion date shall not affect the CP or
prevent the accrual of stipulated penalties associated with the failure to meet
the milestone completion date that is the subject of the written request. IDEM
may deny the request through written correspondence or through a formal modification
of the Agreed Order.
4.
Respondent shall, after completion of the work
required pursuant to the approved CP in Attachment A, which
is outlined in Findings of Fact Paragraph 11, demonstrate six (6) consecutive
months of compliance (Compliance Demonstration) with the terms and conditions
of the Permit, specifically including compliance with effluent limitations, monitoring
and reporting requirements, and operation and maintenance. During the
Compliance Demonstration, Respondent shall be subject to stipulated penalties,
as specified below, for violations of this Order and the terms and conditions
of the Permit.
In
the event that violation(s) occur during the Compliance Demonstration, within
60 days of the violation, Respondent shall develop and submit to IDEM, for
approval, an Additional Action Plan, which identifies the additional actions
that Respondent will take to achieve and maintain compliance with the terms and
conditions of the Permit. The Additional Action Plan, if required, shall
include an implementation and completion schedule, including specific milestone
dates.
5.
The Additional Action Plan required by Order
Paragraph 3 above is subject to IDEM approval. In the event IDEM determines
that any plan submitted by Respondent is deficient or otherwise unacceptable, Respondent
shall revise and resubmit the plan to IDEM in accordance with IDEM’s notice. After
three (3) submissions of such plan by Respondent, IDEM may seek civil
enforcement of this Order.
6.
Respondent, upon receipt of written
notification from IDEM, shall immediately implement the approved plan(s) and
adhere to the milestone dates therein. The approved CP and Additional Action
Plan shall be incorporated into the Agreed Order and shall be deemed an
enforceable part thereof.
Failure
by Respondent to submit any plan by the specified date or to meet any of the
milestones in the approved plan(s), will subject Respondent to stipulated
penalties as described below.
Following
completion of the actions included in the CP and Additional Action Plan, the 6-month
Compliance Demonstration, as specified in Order Paragraph 4, will restart, and Respondent
shall be subject to stipulated penalties, as specified below, for violations of
the terms and conditions of the Permit during this time period. Failure to achieve
compliance at the conclusion of work under an Additional Action Plan may
subject Respondent to additional enforcement action.
7.
Beginning with the first calendar quarter
following the Effective Date, Respondent shall submit to IDEM a written
progress report within 10 days of the end of each calendar quarter, which
identifies the compliance actions implemented during each quarter ending March
31st, June 30th, September 30th, and December
31st, until completion of the CP or Additional Action Plan.
8.
Beginning on the Effective Date and continuing
until the successful completion of implementation of the approved CP, as
required by Order Paragraph 3 above, Respondent shall, at all times, operate
the existing WWTP, as efficiently and effectively as possible.
9.
All
submittals required by this Agreed Order, unless Respondent is notified
otherwise in writing by IDEM, shall be sent to:
Aletha
Lenahan, Enforcement Case Manager |
Office
of Water Quality – IGCN N1255 |
Indiana
Department of Environmental Management |
100
North Senate Avenue |
Indianapolis,
IN 46204-2251 |
10.
Respondent
is assessed and agree to pay a civil penalty of Five Thousand, Seven Hundred
Twenty ($5,720). Said penalty amount shall be due and payable to the “Environmental
Management Special Fund” within 30 days of the Effective Date, the 30th
day being a “Due Date.”
11.
In
the event the terms and conditions of the following paragraphs are violated,
IDEM may assess and Respondent shall pay the corresponding stipulated penalty:
Paragraph |
Violation |
Stipulated Penalty |
3 |
Failure
to implement the CP within the required time period. |
$500
per week late or part thereof. |
3 |
Failure
to notify IDEM upon becoming aware that it may be unable to complete work
under the CP. |
$250
per week late or part thereof. |
4, 5 |
For
violations of terms and conditions of the Permit during the Compliance
Demonstration. |
$500
per violation |
4 |
Failure
to submit or modify the Additional Action Plan, if required, within the given
time period. |
$250
per week late or part thereof. |
6 |
Failure
to meet any milestone date set forth in the approved CP or Additional Action
Plan. |
$500
per week late or part thereof. |
7 |
Failure to submit to IDEM a written
report of progress or completion for each milestone date included in the CP
or Additional Action Plan within 10 days of the end of each calendar quarter. |
$250
per week late or part thereof. |
8 |
Failure
to, at
all times, operate the
WWTP as efficiently and effectively as possible. |
$250
per violation. |
12.
Stipulated
penalties shall be due and payable no
later than the 30th day after Respondent receive written
notice that IDEM has determined a stipulated penalty is due, the 30th day being a “Due Date.”
IDEM may notify Respondent at any time that a stipulated penalty is due. Failure
to notify Respondent in writing in a timely manner of a stipulated penalty
assessment shall not waive IDEM’s right to collect such stipulated penalty or
preclude IDEM from seeking additional relief against Respondent for violation
of this Agreed Order. Neither assessment nor payment of stipulated penalties shall preclude IDEM from seeking additional relief
against Respondent for a
violation of this Agreed Order. Such
additional relief includes any remedies or sanctions available pursuant to Indiana law, including,
but not limited to, civil penalties pursuant to IC 13-30-4.
13.
Civil
and stipulated penalties are payable by check to the “Environmental Management
Special Fund.” Checks shall include the Case Number
2018-24966-W of this action and
shall be mailed to:
Office
of Legal Counsel |
Indiana
Department of Environmental Management |
IGCN,
Room N1307 |
100
North Senate Avenue |
Indianapolis,
IN 46204 |
14.
This
Agreed Order shall apply to and be binding upon Respondent and their successors
and assigns. Respondent’s signatories to this Agreed Order certify that they
are fully authorized to execute this Agreed Order and legally bind the party
they represent. No change in ownership, corporate, or partnership status of Respondent
shall in any way alter their status or responsibilities under this Agreed
Order.
15.
In
the event that the monies due to IDEM pursuant to this Agreed Order are not
paid on or before their Due Date, Respondent shall pay interest on the unpaid
balance and any accrued interest at the rate established by IC 24-4.6-1. The
interest shall be computed as having accrued from the Due Date until the date
that Respondent pay any unpaid balance. The interest shall continue to accrue
on the first of each month until the civil penalty and any interest accrued are
paid in full. Such interest shall be payable to the Environmental Management
Special Fund, and shall be payable to IDEM in the manner specified above.
16.
In
the event that any terms of this Agreed Order are found to be invalid, the
remaining terms shall remain in full force and effect and shall be construed
and enforced as if this Agreed Order did not contain the invalid terms.
17.
Respondent
shall provide a copy of this Agreed Order, if in force, to any subsequent
owners or successors before ownership rights are transferred. Respondent shall
ensure that all contractors, firms and other persons performing work under this
Agreed Order comply with the terms of this Agreed Order.
18.
This
Agreed Order is not and shall not be interpreted to be a permit or a
modification of an existing permit. This Agreed Order, and IDEM’s review or
approval of any submittal made by Respondent pursuant to this Agreed Order,
shall not in any way relieve Respondent of their obligation to comply with the
requirements of the applicable permit and/or any applicable Federal or State
law or regulation.
19.
Complainant
does not, by its approval of this Agreed Order, warrant or aver in any manner
that Respondent’s compliance with any aspect of this Agreed Order will result
in compliance with the provisions of any permit, order, or any applicable
Federal or State law or regulation. Additionally, IDEM or anyone acting on its
behalf shall not be held liable for any costs or penalties Respondent may incur
as a result of Respondent’s efforts to comply with this Agreed Order.
20.
Nothing
in this Agreed Order shall prevent or limit IDEM’s rights to obtain penalties
or injunctive relief under any applicable Federal or State law or regulation,
except that IDEM may not, and hereby waives its right to, seek additional civil
penalties for the same violations specified in the NOV.
21.
Nothing
in this Agreed Order shall prevent IDEM [or anyone acting on its behalf] from
communicating with the United States Environmental Protection Agency (EPA) or
any other agency or entity about any matters relating to this enforcement
action. IDEM or anyone acting on its behalf shall not be held liable for any
costs or penalties Respondent may incur as a result of such communications with
EPA or any other agency or entity.
22.
This
Agreed Order shall remain in effect until Respondent have complied with all
terms and conditions of this Agreed Order and IDEM issues a Resolution of Case
(close out) letter to Respondent.
Remainder of this page intentionally left
blank.
TECHNICAL RECOMMENDATION: |
RESPONDENT: |
Department of Environmental Management |
Richards Restaurant, Inc. |
|
|
By:________________________ |
By:_________________________ |
Samantha K.
Groce, Chief |
|
Water
Enforcement Section |
Printed:______________________ |
Surface
Water, Operations & |
|
Enforcement
Branch |
Title:________________________ |
Office of
Water Quality |
|
|
Date:________________________ |
Date:______________________ |
|
|
|
COUNSEL FOR RESPONDENT: |
|
|
|
By:_________________________ |
|
|
|
Date:_______________________ |
|
|
|
APPROVED AND ADOPTED BY THE INDIANA
DEPARTMENT OF ENVIRONMENTAL |
|
MANAGEMENT THIS ______ DAY
OF ________________________, 201___ |
|
|
|
|
For the Commissioner: |
|
|
Signed on December 19, 2018 |
|
Martha Clark Mettler |
|
Assistant Commissioner |
|
Office of Water Quality |