Complainant
and Respondent desire to settle and compromise this action without hearing or
adjudication of any issue of fact or law, and consent to the entry of the
following Findings of Fact and Order.
Pursuant to IC 13-30-3-3, entry into the terms of this Agreed Order does
not constitute an admission of any violation contained herein. Respondent's entry into this Agreed Order
shall not constitute a waiver of any defense, legal or equitable, which
Respondent may have in any future administrative or judicial proceeding, except
a proceeding to enforce this order.
I. FINDINGS OF FACT
1.
Complainant
is the Commissioner (“Complainant”) of the Indiana Department of Environmental
Management (“IDEM”), a department of the State of Indiana created by Indiana
Code (“IC”) 13-13-1-1.
2.
Respondent
is Advanced Bearing Materials, LLC (“Respondent”), which owns and operates the
facility with Plant ID No. 031-00002, located at 1515 West Main Street, in Greensburg,
Decatur County, Indiana (“Site”).
3.
IDEM
has jurisdiction over the parties and the subject matter of this action.
4.
Pursuant
to IC 13-30-3-3, IDEM issued a Notice of Violation (“NOV”) in conjunction with
a Proposed Agreed Order on April 4, 2011.
5.
During
an investigation including an inspection on January 12, 2011 conducted by a
representative of IDEM, the following violations were found:
a.
Pursuant
to 326 IAC 2-8-5 and permit condition D.1.7 of Federally Enforceable State
Operating Permit (FESOP) No. 24769, when for any reading, the pressure
drop across the baghouse used in conjunction with the CBS Line furnaces is
outside the normal range established during the latest stack test, the
Permittee shall take reasonable response steps. Failure to take response steps
shall be considered a deviation from the permit.
Respondent failed to document taking appropriate response steps when pressure
drop was out of range for their CBS Line baghouse during several periods of
time over 2010, in violation of 326 IAC 2-8-5 and condition D.1.7 of FESOP No.
24769.
b.
Pursuant
to 326 IAC 2-8-5 and permit condition D.1.7 of Federally Enforceable State
Operating Permit (FESOP) No. 24769, when for any reading, the pressure drop
across the cyclone/bag filter combination used in conjunction with the CBS Line
rough milling units is outside the normal range established during the latest
stack test, the Permittee shall take reasonable response steps. Failure to take
response steps shall be considered a deviation from the permit.
Respondent
failed to document taking
appropriate response steps when pressure drop was out of range for their rough milling
cyclone/baghouse system during several periods of time over 2009 and 2010, in violation
of 326 IAC 2-8-5 and
condition D.1.7 of FESOP No. 24769.
6.
Violation
letters for failure to take appropriate corrective action for pressure
drop readings that were outside of the permitted range on the CBS Cast Line
baghouse and the Rough Milling cyclone/baghouse system were sent to the
Respondent as a result of two previous inspections. These violation letters were sent on November
14, 2008 and August 8, 2005.
7.
On
May 11, 2011 the Respondent provided a detailed list of the equipment and/or
process changes that have taken place in the past in an attempt to get the
emission control system on the CBS Cast Line (Stack 8) into compliance with the
required pressure drop ranges as specified in their permit. However, these changes have had no
considerable lasting impact on the measured pressure drop as observed in the
January 12, 2011 inspection.
·
On
April 10, 2010 the Respondent changed out all 640 bags in the CBS Cast Line
baghouse system.
·
After
that point and during production down times, the CBS Cast Line baghouse blower
was shut off to allow pulse cleaning of the bags. This lowered the readings but
harmed the inside plant atmosphere, so this procedure was quickly halted.
·
In
November of 2010 the Respondent contracted with an outside firm to review the
performance of the CBS Cast Line baghouse system. They identified the following issues and made
the appropriate repairs or replacements:
-
Air
regulator supplying the south bank was leaking (lower air volume reduces pulse
cleaning ability)
-
Several
diaphragms were ruptured
-
One
blow tube in the south bank and one in the north bank were dislodged completely
-
Four
additional tubes were not seated appropriately
·
On
January 5, 2011 the Respondent inspected the duct leading from the process to
the outside CBS Cast Line baghouse system for excessive build up. The duct was inspected from the supply point
above the furnace canopy to the cyclone prior to the baghouse dust collection
system and very little buildup was found.
8.
On
May 11, 2011 the Respondent also provided a compliance plan for how they intend
to ensure in the future that the emission control systems on the CBS Cast Line
(Stack 8) and the Rough Milling Units (Stack 10) will operate in compliance
with the required pressure drop ranges as specified in their permit.
CBS
Cast Line
·
On
March 19, 2011 the purchase order was released for the expenses associated with
the expansion of the current CBS Cast Line baghouse system. This project will add two additional
filtration modules for a total of four.
The system will be controlled to sequence the modules such that three
modules will be online while the fourth is off line pulse cleaning without the
interference of the blower.
·
The
permit modification application for the proposed CBS Cast Line baghouse
expansion was received by IDEM on May 13, 2011 and the draft permit number is
30545.
Rough
Milling Units
·
On
April 26, 2011 the Respondent installed a pressure switch into the pulse timing
schematic for the emission control system on the Rough Milling Units. This was done to control when the pulse jets
are activated in order to make sure that the control equipment is operating
within the manufacturers specified and permitted pressure drop range.
9.
In
recognition of the settlement reached, Respondent waives any right to
administrative and judicial review of this Agreed Order.
II. ORDER
1.
This
Agreed Order shall be effective (“Effective Date”) when it is approved by
Complainant or Complainant’s delegate, and has been received by Respondent. This Agreed Order shall have no force or
effect until the Effective Date.
2.
Respondent
shall comply with statutes, rules, and/or permit conditions listed above at
issue.
3.
Within 180 days of the issuance of permit
modification No. 30545, Respondent shall complete installation of the CBS Cast
Line baghouse expansion as described in the Findings of Fact.
If permit modification No. 30545 is denied, Respondent shall submit within
45 days of that denial, an alternate compliance plan and implementation
timeline for how the Respondent will maintain compliance with the pressure drop
range for the CBS Line baghouse system established in their permit and
corroborated during the last compliance stack test.
4.
If stack testing to demonstrate compliance
with emission limits is required on the CBS Cast Line baghosue
system as part of permit modification No. 30545; then within 60 days of
completion of the required stack testing, Respondent shall submit to IDEM
Office of Air Quality 45 days of pressure drop monitoring data from the
emission control system on the CBS Cast Line (Stack 8); otherwise, the pressure
drop data shall be submitted to IDEM within 60 days of the completion of the
CBS Cast Line baghouse expansion.
5.
Within 60 days of the Effective Date of the
Order, Respondent shall submit to IDEM Office of Air Quality 45 days of
pressure drop monitoring data from the emission control system on the Rough
Milling Units (Stack 10).
6.
All
submittals required by this Agreed Order, unless Respondent is notified
otherwise in writing by IDEM, shall be sent to:
Rebecca
Hayes, Compliance and Enforcement Manager |
Compliance
and Enforcement Branch – Mail Code 61-53 |
Indiana
Department of Environmental Management |
100
North Senate Avenue |
Indianapolis,
IN 46204-2251 |
7.
Respondent
is assessed a civil penalty of Nine Thousand Six Hundred Dollars ($9,600). Said penalty amount shall be due and payable
to the Environmental Management Special Fund within thirty (30) days of the
Effective Date. In the event that the
civil penalty is not paid within thirty (30) days of the Effective Date,
Respondent shall pay interest on the unpaid balance at the rate established by
IC 24-4.6-1-101. The interest shall
continue to accrue until the civil penalty is paid in full.
8.
In
the event the terms and conditions of the following paragraphs are violated,
Complainant may assess and Respondent shall pay a stipulated penalty in the
following amount:
Paragraph |
Violation |
Stipulated
Penalty |
|
|
|
3 |
Failure to complete
specified installation or provide documentation in the time frame required. |
$500 per 30
day period |
4 |
Failure to provide
documentation in the time frame required. |
$500 per 30
day period |
5 |
Failure to
provide documentation in the time frame required. |
$500 per 30
day period |
9.
Stipulated
penalties shall be due and payable within thirty (30) days after Respondent
receives written notice that Complainant has determined a stipulated penalty is
due. Assessment and payment of
stipulated penalties shall not preclude Complainant from seeking any additional
relief against Respondent for violation of this Agreed Order. In lieu of any of the stipulated penalties
set out above, Complainant may seek any other remedies or sanctions available
by virtue of Respondent’s violation of this Agreed Order or Indiana law,
including, but not limited to, civil penalties pursuant to IC 13-30-4.
10.
Civil
and stipulated penalties are payable by check to the “Environmental Management
Special Fund.” Checks shall include the
Case Number of this action and shall be mailed to:
Indiana
Department of Environmental Management |
Cashier
– Mail Code 50-10C |
100
North Senate Avenue |
Indianapolis,
IN 46204-2251 |
11.
This
Agreed Order shall apply to and be binding upon Respondent and its successors
and assigns. Respondent’s signatories to
this Agreed Order certify that they are fully authorized to execute this Agreed
Order and legally bind the party they represent. No change in ownership, corporate, or partnership
status of Respondent shall in any way alter their status or responsibilities
under this Agreed Order.
12.
In
the event that any terms of this Agreed Order are found to be invalid, the
remaining terms shall remain in full force and effect and shall be construed
and enforced as if this Agreed Order did not contain the invalid terms.
13.
Respondent
shall provide a copy of this Agreed Order, if in force, to any subsequent
owners or successors before ownership rights are transferred. Respondent
shall ensure that all contractors, firms and other persons performing work
under this Agreed Order comply with the terms of this Agreed Order.
14.
This
Agreed Order is not and shall not be interpreted to be a permit or a
modification of an existing permit. This
Agreed Order, and IDEM’s review or approval of any submittal made by Respondent
pursuant to this Agreed Order, shall not in any way relieve Respondent of their
obligation to comply with the requirements of their applicable permit or any
applicable Federal or State law or regulation.
15.
Complainant
does not, by its approval of this Agreed Order, warrant or aver in any manner
that Respondent’s compliance with any aspect of this Agreed Order will result
in compliance with the provisions of any permit, order, or any applicable
Federal or State law or regulation.
Additionally, IDEM or anyone acting on its behalf shall not be held
liable for any costs or penalties Respondent may incur as a result of
Respondent’s efforts to comply with this Agreed Order.
16.
Nothing
in this Agreed Order shall prevent or limit IDEM’s rights to obtain penalties
or injunctive relief under any applicable Federal or State law or regulation,
except that IDEM may not, and hereby waives its right to, seek additional civil
penalties for the same violations specified in the NOV.
17.
Nothing
in this Agreed Order shall prevent IDEM or anyone acting on its behalf from
communicating with the EPA or any other agency or entity about any matters
relating to this enforcement action.
IDEM or anyone acting on its behalf shall not be held liable for any
costs or penalties Respondent may incur as a result of such communications with
the EPA or any other agency or entity.
18.
This
Agreed Order shall remain in effect until IDEM issues a Resolution of Case
letter to Respondent.
TECHNICAL
RECOMMENDATION: |
|
RESPONDENT: |
|||||
Department
of Environmental Management |
|
Advanced
Bearing Materials, LLC |
|||||
|
|
|
|||||
By: |
|
|
By: |
|
|||
|
Roger
Letterman, Chief |
|
Printed: |
|
|||
|
Compliance
and Enforcement Section 2 |
|
Title: |
|
|||
|
Office
of Air Quality |
|
|
|
|||
Date: |
|
|
Date: |
|
|||
|
|
|
|
|
|||
|
|
|
|||||
COUNSEL
FOR COMPLAINANT: |
|
COUNSEL
FOR RESPONDENT: |
|||||
For
the Department of Environmental Management |
|
|
|||||
|
|
|
|||||
By: |
|
|
By: |
|
|||
|
Deputy
Attorney General |
|
|
|
|||
|
|
|
|
|
|||
Date: |
|
|
Date: |
|
|||
|
|
|
|
|
|||
APPROVED
AND ADOPTED BY THE INDIANA DEPARTMENT OF ENVIRONMENTAL |
|||||||
MANAGEMENT THIS |
|
DAY OF |
|
,
2011. |
|||
|
|||||||
|
For
the Commissioner |
||||||
|
|
||||||
|
Signed
on, 2011 |
||||||
|
Keith
Baugues, Assistant Commissioner |
||||||
|
Office
of Air Quality |
||||||
|
Indiana
Department of Environmental Management |
||||||