IN.gov - Skip Navigation

Note: This message is displayed if (1) your browser is not standards-compliant or (2) you have you disabled CSS. Read our Policies for more information.

Amber Alert
Amber Alert - TEST
  • INDOT_roadmapWidget3
  • trafficwise_widget
  • report_concern_widget
Section 800 RSP

Indiana Department of Transportation

INDOT > Doing Business with INDOT > Standards and Specifications >Recurring Special Provisions & Plan Details > 2013 Edition newRecurring Special Provisions & Plan Details

Effective for Lettings on or after September 1, 2013


| RSP Home | Section 100 | Section 200 | Section 300 | Section 400 |

| Section 500 | Section 600 | Section 700 | Section 800 | Section 900 |

*Revision Date = Date the Recurring Special Provision was Added or Revised
**Letting Date = Effective for use on lettings on or after this date - Be sure to select the RSP or RPD for the correct letting date you need

Section 800 - Traffic Control Devices and Lighting


RFP or RPD
Description
Rev. Date*
Letting Date**
Certification for Temporary Traffic Control Devices
05/23/13
09/01/13
Temporary Construction Signs
12/19/13
04/01/14
Maintaining Traffic for Maintenance or Resurface Work
09/01/05
09/01/13
Temporary U-turns for Contractor's Vehicles
05/23/13
09/01/13
Mobile Construction Signs
09/01/05
09/01/13
Material Used for Temporary Ingress/Egress to Properties
05/23/13
09/01/13
Worksite Added Penalty Sign
06/25/07
09/01/13
Worksite Added Penalty Sign 78 x 42
07/26/07
09/01/13
Worksite Added Penalty Sign 60 x 36
07/26/07
09/01/13
Worksite Added Penalty Sign 48 x 48
07/26/07
09/01/13
Maintaining Existing Traffic Signal Installation
09/01/05
09/01/13
Traffic Control Device Report
09/01/05
09/01/13
Temporary Roll-Up Sign
01/03/07
09/01/13
Automated Flagger Assistance Device
05/16/13
09/01/13
Traffic Control For Traffic Breaks
07/17/13
09/01/13
Lane Ends Warning Signs
02/20/14
05/01/14
Sign Cantilever Structure Butterfly
09/19/13
12/01/13
Sign Cantilever Structure Double Arm and Quadri-Chord Base Plate, Anchor Bolt, and Metal Skirt Details
09/19/13
12/01/13
Department Furnished Materials (edit.)
05/23/13
09/01/13
Loop Testing Table
09/01/05
09/01/13
Electrical Insulation Sealant
09/01/05
09/01/13
Traffic Signal Equipment Salvaged by the Department (edit.)
05/23/11
09/01/13
Signal Bulb Replacement, Aerial Inspection, and Loop Replacement (edit.)
05/23/13
09/01/13
Traffic Signal Maintenance and Repair
05/23/13
09/01/13
Detector Card Rack and Detector Modules
09/01/05
09/01/13
Video Vehicle Detector System
05/23/13
09/01/13
Integrated Video Vehicle Detector System
05/23/13
09/01/13
Wireless Vehicle Detection System
05/23/13
09/01/13
Wireless Vehicle Detectors
09/16/10
09/01/13
Radio Site Survey Report (edit.)
04/19/12
09/01/13
Magnetometers and Microloop Detectors
05/16/13
09/01/13
Radio Interconnection
05/16/13
09/01/13
Preformed Pave-Over Loops
02/21/13
09/01/13
Traffic Signal Cantilever Structure Details
09/19/13
12/01/13
Accessible Pedestrian Signals
11/22/13
03/01/14
Accessible Pedestrian Signals with Speech Walk Messages (edit.)
11/22/13
03/01/14
Highway Illumination Maintenance and Repair
05/23/13
09/01/13
Luminaires
05/16/13
09/01/13
Repainting No-Passing Zone Pavement Markings
09/01/05
09/01/13
Refurbished Snowplowable Raised Pavement Marker Castings
05/23/13
09/01/13
Longitudinal Rumble Stripes
05/16/13
09/01/13
Longitudinal Rumble Stripes Details
05/16/13
09/01/13