Note: This message is displayed if (1) your browser is not standards-compliant or (2) you have you disabled CSS. Read our Policies for more information.
New Metric Standard Drawings
Effective for Lettings on or After March 1, 2005
|
Sec. |
Code |
Page |
Drawing Subject |
Drawing Contents |
Date |
|
205 |
TECD |
02 |
Temporary Check Dam, Straw Bales |
3/1/05 |
|
|
402 |
TMPT |
01 |
Termination Of Mainline Pavement Overlay |
3/1/05 |
|
|
503 |
CCPJ |
01 |
Type D-1 Contraction Joint |
3/1/05 |
|
|
503 |
CCPJ |
06 |
Transverse Joint Seals |
3/1/05 |
|
|
601 |
BAGR |
02 |
Median Bridge Approach Guardrail |
3/1/05 |
|
|
601 |
GRET |
07 |
Grading At Guardrail End Treatments |
3/1/05 |
|
|
601 |
MPPG |
03 |
Median Pier Protection Guardrail |
3/1/05 |
|
|
601 |
MPPG |
04 |
Median Pier Protection Guardrail |
3/1/05 |
|
|
601 |
MTGR |
01 |
Thrie Beam and Double Face Thrie Beam Guardrail |
3/1/05 |
|
|
601 |
RHPG |
01 |
Roadside Hazard Protection Guardrail |
3/1/05 |
|
|
601 |
RHPG |
02 |
Roadside Hazard Protection Guardrail |
3/1/05 |
|
|
601 |
RHPG |
03 |
Roadside Hazard Protection Guardrail |
3/1/05 |
|
|
601 |
RHPG |
04 |
Roadside Hazard Protection Guardrail |
3/1/05 |
|
|
601 |
TMTT |
01 |
Thrie Beam to Thrie Beam Transition, TTT |
3/1/05 |
|
|
601 |
TTMS |
01 |
DF Thrie Beam Transition to GRET Type MS |
3/1/05 |
|
|
601 |
TWGB |
01 |
Guardrail Transition Type WGB |
3/1/05 |
|
|
601 |
TWGT |
01 |
W-Beam to Thrie Beam GR Transition Type WGT |
3/1/05 |
|
|
602 |
CCMB |
04 |
Concrete Barrier |
3/1/05 |
|
|
604 |
SWCR |
02 |
Sidewalk Curb Ramp General Notes & Details |
3/1/05 |
|
|
604 |
SWCR |
09 |
Curb Ramps Type G And H |
3/1/05 |
|
|
610 |
DRIV |
02 |
Class I Drive Sidewalk Not Adjacent To Curb |
3/1/05 |
|
|
610 |
DRIV |
06 |
Class II, IV, & V Drives Approach Grades |
3/1/05 |
|
|
610 |
MBAP |
01 |
Mailbox Approach Plan Views |
3/1/05 |
|
|
610 |
MBAP |
02 |
Mailbox Approach Low Speed Low Traffic |
3/1/05 |
|
|
611 |
MBAS |
01 |
Single Mailbox Assembly |
3/1/05 |
|
|
611 |
MBAS |
02 |
Double Mailbox Assembly |
3/1/05 |
|
|
611 |
MBAS |
03 |
Mailbox Support Hardware |
3/1/05 |
|
|
611 |
MBAS |
04 |
Elevation Views |
3/1/05 |
|
|
706 |
BCBR |
01 |
Common Height Concrete Bridge Railing |
3/1/05 |
|
|
706 |
BRPP |
01 |
Railing Type PF-1 |
3/1/05 |
|
|
706 |
CBRT |
02 |
Concrete Bridge Railing Transition TBC Or TBT |
3/1/05 |
|
|
706 |
TASE |
01 |
Bridge Railing Transition TBC Slab Extension |
3/1/05 |
|
|
706 |
TBRC |
01 |
Retrofit Thrie Beam Bridge Railing TR |
3/1/05 |
|
|
706 |
TBRC |
02 |
Retrofit Thrie Beam Bridge Railing |
3/1/05 |
|
|
706 |
TBRC |
03 |
Retrofit Thrie Beam Bridge Railing TR Components |
3/1/05 |
|
|
706 |
TBRE |
01 |
Components |
3/1/05 |
|
|
706 |
TBRF |
01 |
TR Components |
3/1/05 |
|
|
706 |
TBRF |
02 |
TR Components |
3/1/05 |
|
|
711 |
BSTS |
01 |
Steel Shoe Details |
3/1/05 |
|
|
715 |
BKFL |
02 |
Pipe Structure Backfill Embankment Installations |
3/1/05 |
|
|
715 |
BKFL |
04 |
Pipe Structure Backfill Trench Installations |
3/1/05 |
|
|
715 |
BKFL |
06 |
Pipe Structure Backfill Median Installations |
3/1/05 |
|
|
715 |
BKFL |
08 |
Pipe Structure Backfill Driveway Installations |
3/1/05 |
|
|
715 |
BKFL |
09 |
Pipe Structure Backfill General Notes |
3/1/05 |
|
|
720 |
CDSC |
01 |
Drainage Structure/Casting Compatibility |
3/1/05 |
|
|
724 |
BSSJ |
06 |
Expansion Joints Class SS |
3/1/05 |
|
|
801 |
TCCB |
02 |
Barrier Reinforcement and Connection Details |
3/1/05 |
|
|
801 |
TCCO |
01 |
Temporary Crossover Advance Signing |
|