I-65 Northwest Indiana Major Moves 2020 Expansion Project

I-65 Northwest Indiana Major Moves
2020 Expansion Project

The Project involves constructing one additional travel lane along northbound and southbound I-65 along the outside shoulder from Exit 253 (US 30) to Exit 247 (US 231), constructing an additional travel lane for northbound and southbound I-65 within the existing median from Exit 247 (US 231) to Exit 240 (SR 2) and replacement of the bridges over the Kankakee River. I-65 is, and the Project shall also be, a non-tolled highway.

Project Location Map

INDOT is committed to improving mobility in the region and using project delivery methods that provide overall best value to the citizens of the State, including the use of best value design-build through a PPA.

Additional information

  • Notice of Designation
  • Basis for preliminary selection of Walsh Construction Company II, LLC.
  • In accordance with Indiana Code 8-15.7 (general provisions for public-private partnerships), public comments on the Agreement and the preliminary selection by INDOT of the Selected Offer, will be accepted on the following dates at two public hearings: Click here for more information.
  • Monday, October 17, 2016 at 6:00pm (local time), Crown Point High School, (SGI Room/Small cafeteria) 1500 South Main Street, Crown Point, Indiana 46307
  • Monday, October 24, 2016 at 6:00pm (local time), Kentland Public Library, 201 E. Graham Street, Kentland, Indiana 47951 

Selected Proposal

Request for Proposal (for Selected Short Listed Companies)

Notice of Request for Proposal

Addendum 1

Addendum 2

Addendum 3

Addendum 4

Addendum 5

Click here for INDOT I-65 NW Major Moves Request for Qualification (RFQ) information.