PAGE 1 INDIANA DEPARTMENT OF TRANSPORTATION RUN DATE : February 28, 2003 CONTRACT BID LETTING RESULTS LETTING DATE : February 18, 2003 (BY COUNTY) CONTRACTOR'S DATE TO BE COUNTY CONTRACT # DESCRIPTION - LOCATION CONTRACTOR BID COMPLETED BARTHOLOMEW M -26629-A DEBRIS REMOVAL FROM CHANNEL ALPHA EXCAVATING & LANDSCAPING 16,895.00 30 W.D. AT I-65 OVER DRIFTWOOD RIVER WESTPORT , IN (RP 068+059) BENTON B -26647-A BRIDGE REPLACEMENT ON COUNTY WIRTZ & YATES, INC. 365,318.57 55 W.D. ROAD 700 NORTH OVER CARPENTER KENTLAND , IN CREEK, 5.0 km EAST OF SR 55 CARROLL B -26667-A BRIDGE REHABILITATION ON WIRTZ & YATES, INC. 869,182.69 10/17/03 COUNTY ROAD 250 WEST OVER KENTLAND , IN WABASH RIVER, 9.6 km SOUTH OF WHITE COUNTY LINE CLAY B -25914-A BRIDGE REPLACEMENT ON SR 42 FORCE CONSTRUCTION CO. INC. 1,095,944.42 07/31/04 OVER MCINTYRE CREEK, 7.5 km COLUMBUS , IN EAST OF SR 59 (RP 16+12) DEARBORN M -26576-A GUARDRAIL MAINTENANCE ON I-74 C-TECH CORPORATION, INC. 133,492.30 06/30/04 DECATUR FROM SHELBY/DECATUR COUNTY BOGGSTOWN , IN FRANKLIN LINE TO INDIANA/OHIO STATE RIPLEY LINE (RP 123+018 TO 171+024) DEKALB B -26641-A BRIDGE REHABILITATION ON MILL AWARD PENDING STREET (SPENCERVILLE) (OLD COUNTY ROAD 68) OVER ST JOSEPH RIVER, 0.6 km EAST OF SR 1 DELAWARE RS-26369-A ASPHALT RESURFACE ON SR 28 L I C A CONSTRUCTION 682,440.07 11/15/03 RANDOLPH FROM SR 67 TO SR 1 BERNE , IN ELKHART M -26491-A PAVEMENT PATCHING, CONCRETE BROOKS CONSTRUCTION 779,604.94 10/17/03 ON SR 19 FROM BRISTOL STREET FORT WAYNE , IN TO MICHIGAN STATE LINE ELKHART RS-26443-A ASPHALT RESURFACE ON SR 19 BROOKS CONSTRUCTION 1,865,446.25 08/31/03 FROM SR 119 TO US 20 (RP FORT WAYNE , IN 103+760 TO RP 112+026) FULTON R -26565-A ENHANCEMENT, STREETSCAPE ON BROOKS CONSTRUCTION 283,365.57 11/01/05 SR 14 TO 67m EAST OF THE FORT WAYNE , IN INTERSECTION WITH SR 19 GRANT B -26342-A BRIDGE REHABILITATION ON SR AWARD PENDING 18 OVER MISSISSINEWA RIVER, 1.5 MILES EAST OF SR 9 (RP 104+68) PAGE 2 INDIANA DEPARTMENT OF TRANSPORTATION RUN DATE : February 28, 2003 CONTRACT BID LETTING RESULTS LETTING DATE : February 18, 2003 (BY COUNTY) CONTRACTOR'S DATE TO BE COUNTY CONTRACT # DESCRIPTION - LOCATION CONTRACTOR BID COMPLETED GRANT B -26419-A BRIDGE REHABILITATION ON SR BAKER & SCHULTZ, INC. 728,498.51 08/22/03 18 OVER TROY AVE (MARION) AND DECATUR , IN ON SR 18 OVER NORFOLK SOUTHERN RAILROAD, 6.0 AND 6.1 MILES EAST OF SR 13 (E JCT) GREENE R -26554-A STORM SEWER REPAIR OR O'MARA, DAVE CONTRACTOR 1,224,089.20 11/15/03 REPLACEMENT ON STATE ROAD 157 NORTH VERNON , IN AT WEST CITY LIMITS OF WORTHINGTON (RP 9+53) HARRISON M -26575-A DEBRIS REMOVAL FROM CHANNEL HAUER EXCAVATING 14,450.00 06/30/03 AT SR 335 OVER INDIAN CREEK VALLONIA , IN (RP 000+013) HENRY RS-26370-A ASPHALT RESURFACE ON US 36 E & B PAVING, INC. 1,664,609.96 65 W.D. RANDOLPH FROM SR 3 TO US 35 ANDERSON , IN JASPER B -26051-A BRIDGE REPLACEMENT ON SR 49 WIRTZ & YATES, INC. 702,142.71 65 W.D. OVER WHEATFIELD DITCH, 0.96 KENTLAND , IN km NORTH OF SR 10 (RP 9+43) JAY RS-26581-A ASPHALT RESURFACE ON SR 1 L I C A CONSTRUCTION 1,061,235.58 11/15/03 FROM 0.72 MILE NORTH OF SR 67 BERNE , IN TO 2.49 MILES NORTH OF SR 26 NORTH JCT. JEFFERSON B -26723-A BRIDGE REHABILITATION ON REJECTED TO BE RE-ADVERTISED SOUTH ENTRANCE PARK ROAD IN CLIFTY FALLS STATE PARK, 0.3 MILE NORTH OF SR 56 LAKE B -26716-B BRIDGE REPAIR-STRAIGHTEN BEAM CIVIL CONSTRUCTION, INC. 87,244.06 10/03/03 ON 73RD AVENUE (MERRILLVILLE) PLAIN CITY , OH (CR 330) OVER I-65, 0.94 MILE NORTH OF US 30 (RP 253+67) LAPORTE BT-26227-A BRIDGE REHABILITATION AND KANKAKEE VALLEY CONSTRUCTION 423,918.04 07/01/03 BRIDGE PAINTING ON US 421 LAPORTE , IN OVER TOLL RD, 2.02 MI NORTH OF SR 2 (MP 39.01) AND ON RAMP FROM TOLL RD TO MICHIGAN CITY TOLL PLAZA (MP 38.82) MARION R -26549-A INTERCHANGE MODIFICATION, BERNS/WEDDLE JOINT VENTURE 28,146,662.83 11/15/03 BRIDGE REPLACEMENT, SIGNS, INDIANAPOLIS , IN SIGNALS ON I-465 AT I-465 AND 56TH STREET PAGE 3 INDIANA DEPARTMENT OF TRANSPORTATION RUN DATE : February 28, 2003 CONTRACT BID LETTING RESULTS LETTING DATE : February 18, 2003 (BY COUNTY) CONTRACTOR'S DATE TO BE COUNTY CONTRACT # DESCRIPTION - LOCATION CONTRACTOR BID COMPLETED MIAMI B -26453-A BRIDGE REPLACEMENT ON SR 218 DEICHMAN EXCAVATING CO 482,782.64 07/18/03 OVER BRANCH OF PIPE CREEK, LOGANSPORT , IN 0.26 km EAST OF US 31 (RP 33+46) MONTGOMERY RS-26675-A ASPHALT RESURFACE ON SR 47 MILESTONE CONTRACTORS, L.P. 483,528.21 35 W.D. FROM CO. RD. 600S. TO GRANT COLUMBUS , IN STREET OWEN RS-25961-A ASPHALT RESURFACE ON US 231 WABASH VALLEY ASPHALT CO. LLC 1,679,125.79 08/22/03 PUTNAM FROM 0.1 MILE SOUTH OF SR 67 TERRE HAUTE , IN TO 0.2 MILE SOUTH OF SR 42 PERRY B -26446-A BRIDGE AND LIGHTING REJECTED TO BE RE-ADVERTISED REHABILITATION ON SR 237 OVER THE OHIO RIVER, 0.8 MILE SOUTH OF SR 66 (RP 0+01) PIKE RS-26309-B ASPHALT RESURFACE ON SR 61 RUDOLPH, J.H. & CO 1,077,087.35 75 W.D. WARRICK FROM SR 68 TO SR 64 (RP 20+06 EVANSVILLE , IN TO RP 32+10) PORTER R -25758-A SMALL STRUCTURE REPLACEMENT BUCKO CONSTRUCTION 614,843.28 08/01/03 ON US 12, 4 MILES EAST OF SR GARY , IN 49, 1.3 MILES WEST OF SR 49 AND 1.1 MILES EAST OF SR 49; .5 MILE EAST OF SR 49 POSEY B -26224-A BRIDGE REPLACEMENT ON SR 66 BLANKENBERGER BROTHERS 1,978,121.71 125 W.D. OVER BIG CREEK OVERFLOW, 3.7 CYNTHIANA , IN km EAST OF SR 165 (RP 11+09) RUSH M -26467-A SMALL STRUCTURE REPLACEMENT ALPHA EXCAVATING & LANDSCAPING 158,957.55 35 W.D. ON SR 3, 9.99 MILES NORTH OF WESTPORT , IN SR 44 RUSH R -26062-A BRIDGE REMOVAL AND ROAD FORCE CONSTRUCTION CO. INC. 716,714.64 11/17/03 REHABILITATION ON STATE ROAD COLUMBUS , IN 44 OVER FLAT ROCK RIVER OVERFLOW, 0.3 MILE EAST OF SR 3 ST. JOSEPH B -26684-A BRIDGE REHABILITATION ON LAPORTE CONSTRUCTION CO 1,223,728.31 10/15/03 ANGELA BOULEVARD (SOUTH BEND) LAPORTE , IN OVER ST JOSEPH RIVER, 0.6 MI WEST OF MICHIGAN AVENUE (US 33/ BUSINESS US 31) PAGE 4 INDIANA DEPARTMENT OF TRANSPORTATION RUN DATE : February 28, 2003 CONTRACT BID LETTING RESULTS LETTING DATE : February 18, 2003 (BY COUNTY) CONTRACTOR'S DATE TO BE COUNTY CONTRACT # DESCRIPTION - LOCATION CONTRACTOR BID COMPLETED STEUBEN R -25666-A INTERCHANGE MODIFICATION, NIBLOCK EXCAVATING, INC. 1,009,026.86 09/28/03 TRAFFIC SIGNAL MODERNIZATION BRISTOL , IN ON US 20 AT US 20 SW QUADRANT AND AT NORTHBOUND AND SOUTHBOUND RAMPS TIPPECANOE M -26669-A ASPHALT RESURFACE ON US 52 RIETH RILEY CONSTRUCTION 242,413.79 20 W.D. FROM WABASH RIVER TO BRIDGE GOSHEN , IN OVER CSX RAILROAD TIPPECANOE M -26718-A MEDIAN CURB ISLAND PIONEER ASSOCIATES, INC. 163,589.85 05/09/03 RECONSTRUCTION ON US 52 FROM LEO , IN SR 26 TO .26 MILE NORTH OF MCCARTY LANE UNION RS-26368-A ASPHALT RESURFACE ON US 27 MILESTONE CONTRACTORS, L.P. 1,552,068.21 50 W.D. FROM OHIO STATE LINE TO 0.13 COLUMBUS , IN MILE NORTH OF S JCT SR 44 VANDERBURGH R -26547-B ENHANCEMENT, BIKE/PEDESTRIAN AWARD PENDING FACILITY PIGEON CREEK GREENWAY PASSAGE, IN EVANSVILLE VIGO R -26674-B DEMOLITION ON SR 63 AT 3.1 HAUER EXCAVATING 15,696.00 06/22/03 MILES AND 3.9 MILES SOUTH OF VALLONIA , IN I-70 (RP 24+48 TO RP 25+70) WHITE B -26556-A BRIDGE REPLACEMENT ON US 421 WIRTZ & YATES, INC. 767,700.26 08/01/03 OVER FRASER DITCH, 1.6 km KENTLAND , IN NORTH OF US 24 (RP 168+50) VARIOUS M -26665-B ROADSIDE MAINTENANCE- TOWNSEND TREE SERVICE CO 339,278.65 09/29/03 HERBICIDE TREATMENT ALONG PARKER CITY , IN VARIOUS ROADS WITHIN THE FORT WAYNE DISTRICT VARIOUS M -26682-A HERBICIDE TREATMENT VARIOUS DEANGELO BROTHERS, INC. 229,537.01 06/27/03 ROUTES IN SEYMOUR DISTRICT DECATUR , IL VARIOUS M -26711-A TREE REMOVAL VARIOUS JOHNSON COMPANY INC. 78,989.00 09/14/04 LOCATIONS IN THE GREENFIELD WESTPORT , IN DISTRICT =============== TOTAL BID $ 52,957,729.81 PAGE 5 INDIANA DEPARTMENT OF TRANSPORTATION RUN DATE : February 28, 2003 CONTRACT BID LETTING RESULTS LETTING DATE : January 22, 2003 (BY COUNTY) CONTRACTOR'S DATE TO BE COUNTY CONTRACT # DESCRIPTION - LOCATION CONTRACTOR BID COMPLETED MARION R -26488-A ROAD REHABILITATION, BRIDGE WALSH CONSTR CO. OF ILL 23,388,419.00 10/11/03 DECK OVERLAY AND PAINTING, CHICAGO , IL SIGNS ON I-65 FROM MORRIS ST. EXIT RAMP TO THE NORTH SPLIT OF THE INNER LOOP; ON I-70 FROM PINE ST ON RAMP TO 5TH LANE ON I-70 MARSHALL B -26258-A ROAD & BRIDGE REHABILITATION, KANKAKEE VALLEY CONSTRUCTION 5,509,690.93 09/15/04 REMOVAL AND SIGN LAPORTE , IN MODERNIZATION ON US 30 FROM 0.37 km W SR 17 TO 3.5 km W US 31, INCL BRIDGE OVER WESTERN AVE (PLYMOUTH), OVER CONRAIL RR & OVER SR 17 MONROE R -26476-A ENHANCEMENT, BIKE/PEDESTRIAN TRI COUNTY BUILDERS CO 929,332.69 09/15/03 TRAIL ALONG CLEAR CREEK FROM BEDFORD , IN CHURCH LANE TO WEST OF THAT RD TIPPECANOE R -26436-A ASPHALT RESURFACE ON I-65 RIETH RILEY CONSTRUCTION 711,574.13 20 W.D. FROM 0.6 MILE NORTH OF SR 26 GOSHEN , IN TO 1.1 MILES NORTH OF SR 25 =============== TOTAL BID $ 30,539,016.75 INDIANA DEPARTMENT OF TRANSPORTATION RUN DATE : February 28, 2003 CONTRACT BID LETTING RESULTS LETTING DATE : February 04, 2003 (BY COUNTY) CONTRACTOR'S DATE TO BE COUNTY CONTRACT # DESCRIPTION - LOCATION CONTRACTOR BID COMPLETED GIBSON B -26840-A BRIDGE REPAIR ON I-64 OVER US GOHMANN ASPHALT & CONSTR., INC. 125,590.00 03/02/03 41, 4.35 MILES WEST OF SR 57 CLARKSVILLE , IN (RP 24+97) =============== TOTAL BID $ 125,590.00 PENDING CONTRACTS: FEBRUARY 18, 2003: R -26547-B; B -26342-A; B -26641-A