| Lake(s), or River Watershed Name |
Indiana County (or Counties) Location |
Project Report Name |
Date of Report (Month and Year) |
| 28 Lakes in Kosciusko County |
Kosciusko |
Preliminary Investigation of the Lakes of Kosciusko County |
Mar-89 |
| Adams |
LaGrange |
Adams Lake Aquatic Vegetation Management Plan 2007-2011 |
Feb-08 |
| Anderson Parks Lakes |
Madison |
Anderson Parks Lakes - Preliminary Diagnostic Study |
Nov-99 |
| Anderson River Watershed |
Perry, Crawford, Dubois and Spencer |
Anderson River Watershed Diagnostic Study
|
Aug-07 |
| Atwood |
LaGrange |
Atwood Lake Aquatic Vegetation and Management Plan 2008-2012 |
Dec-08 |
| Atwood |
LaGrange |
DRAFT Atwood Lake Aquatic Vegetation Management Plan 2009 Update |
Dec-09 |
| Ball |
Steuben |
Diagnostic Study of Ball Lake |
Jan-03 |
| Barbee Lakes |
Kosciusko |
Little Barbee Lake Feasibility Design Study |
July-91 |
| Barbee Lakes |
Kosciusko |
Project Manual for Little Barbee Lake Putney Ditch Dredging and Sediment Basin Construction |
Aug-91 |
| Barbee Lakes |
Kosciusko |
Project Manual for Little Barbee Lake Putney Ditch Streambank Stabilization |
Aug-91 |
| Barbee Lakes |
Kosciusko |
Contract Documents for the Putney Ditch Streambank Stabilization Design Project |
Oct-98 |
| Barbee Lakes |
Kosciusko |
Design Report for the Streambank Stabilization of Putney Ditch |
Feb-99 |
| Barbee Lakes |
Kosciusko |
The Barbee Lakes Diagnostic Study |
Dec-00 |
| Barbee Lakes |
Kosciusko |
Putney Ditch Watershed Feasibility Study |
Dec-02 |
| Barbee Lakes |
Kosciusko |
Barbee Lakes Sedimentation Plan |
April-06 |
| Barbee Lakes |
Kosciusko |
Barbee Lakes Aquatic Plant Management Plan Revision 2008-2012 |
Feb-08 |
| Barbee Lakes |
Kosciusko |
DRAFT Barbee Lakes Aquatic Vegetation Management Plan 2009 Update |
Dec-09 |
| Barr Creek Watershed |
Vanderburgh |
Rapid Bioassessment of the Barr Creek and Big Creek Watersheds Using Benthic Macroinvertebrates |
Dec-94 |
| Barr Creek Watershed |
Vanderburgh |
Barr Creek Post-Construction Monitoring Study |
Nov-05 |
| Bass |
Starke |
Bass Lake Diagnostic Study |
July-02 |
| Bass |
Starke |
Bass Lake Aquatic Vegetation Management Plan |
Feb-05 |
| Bass |
Starke |
Hydrogeologic Evaluation of the Bass Lake Recharge Well |
June-05 |
| Bass |
Starke |
Bass Lake Aquatic Vegetation Management Plan-2005 Update |
Feb-06 |
| Bass |
Starke |
Bass Lake Aquatic Vegetation Management Plan - 2006 Update |
Feb-07 |
| Bass |
Starke |
Bass Lake, Starke County, Aquatic Plant Management Plan Update |
March-08 |
| Bass |
Starke |
Bass Lake Aquatic Vegetation Management Plan 2008 |
Feb-09 |
| Bass |
Starke |
DRAFT Bass Lake Aquatic Vegetation Management Plan 2009 Update |
Dec-09 |
| Beaver Dam and Loon |
Kosciusko |
Beaver Dam and Loon Lakes AVMP - Revision 2007, Excerpt from Yellow Creek Lakes Diagnostic Study |
March-08 |
| Beaver Creek Reservoir |
Dubois |
Lake Enhancement Program Feasibility Study for Beaver Creek Reservoir |
Oct-90 |
| Big |
Noble |
Preliminary Assessment of Big Lake, Noble County (1992-1995) |
July-95 |
| Big |
Noble |
Big Lake Aquatic Vegetation Management Plan, Noble County, Indiana, 2006-2010 |
Feb-07 |
| Big |
Noble |
Big Lake Aquatic Vegetation Management Plan Update 2007-2011 |
Feb-08 |
| Big |
Noble |
Big Lake Aquatic Vegetaton Management Plan 2009 |
Feb-09 |
| Big |
Noble |
DRAFT Big Lake Aquatic Vegetation Management Plan 2009 Update |
Dec-09 |
| Big Long |
LaGange |
DRAFT Big Long Lake Aquatic Vegetation Management Plan 2009 Update |
Dec-09 |
| Big Long Lake, Lake of the Woods, McClish Lake, Pretty Lake |
LaGrange |
Big Long Lake, Lake of the Woods, McClish Lake, Pretty Lake-A Study for their Improvement, Restoration and Protection |
June-91 |
| Big Turkey |
Steuben |
Big Turkey and Little Turkey Lake Enhancement Feasibility Study |
Sept-90 |
| Big Turkey |
Steuben |
Big Turkey Lake Watershed Feasibility Study |
Sept-02 |
| Big Turkey |
Steuben |
Big Turkey Lake Sediment Trap Design Report |
May-04 |
| Big Turkey |
Steuben |
Big Turkey Lake Sediment Removal Plan |
Sep-06 |
| Big Turkey |
LaGrange and Steuben |
2007 Aquatic Plant Management Plan for Big Turkey Lake in LaGrange and Steuben Counties, Indiana |
Feb-08 |
| Big Turkey |
LaGrange and Steuben |
Aquatic Vegetation Management Plan Update 2008 |
Dec-08 |
| Big Turkey |
LaGrange and Steuben |
DRAFT Big Turkey Lake Aquatic Vegetation Management Plan 2009 Update |
Dec-09 |
| Big Walnut Creek |
Putnam |
Big Walnut Creek Watershed Management Plan (large file, 54MG) |
Jan-09 |
| Bischoff |
Ripley |
Bischoff Reservoir Feasibility Study |
July-91 |
| Bixler |
Noble |
Feasibility Study on the Restoration of Bixler Lake |
May-90 |
| Blue |
Whitley |
Blue Lake Diagnostic Study |
April-06 |
| Blue |
Whitley |
Blue Lake Engineering Feasibility Study |
May-08 |
| Blue River Watershed |
Noble, Whitley |
Rapid Bioassessment of the Blue River and Upper Eel River Watersheds Using Benthic Macroinvertebrates |
Oct-94 |
| Brooks Creek Watershed |
Jay |
Brooks Creek Watershed Diagnostic Study |
March-02 |
| Bruce |
Fulton |
A Study for the Improvement, Restoration, and Protection of Lake Bruce, Fulton and Pulaski Counties, Indiana |
May-90 |
| Bruce |
Fulton |
Project Manual-Contract Documents & Specifications for the Lake Bruce Association Inc. Lake Enhancement Project |
Aug-95 |
| Bruce |
Fulton |
Monitoring Study for the Lake Bruce Watershed Land Treatment Project Area |
May-02 |
| Bruce |
Fulton |
Lake Bruce, Fulton and Pulaski County Aquatic Plant Management Plan 2007-2011 |
Feb-08 |
| Brush Creek Reservoir |
Jennings |
Brush Creek Reservoir Watershed Diagnostic Study |
Aug-02 |
| Brush Creek Reservoir |
Jennings |
Brush Creek Watershed Management Plan |
Oct-02 |
| Brush Creek Watershed |
Owen |
Rapid Bioassessment of the Brush Creek Watershed Using Benthic Macroinvertebrates |
Oct-00 |
| Cedar |
Lake |
Cedar Lake Restoration Feasiblity Study-Final Report by Env. Systems App. Cneter, IUPUI SPEA |
Jan-84 |
| Cedar |
Lake |
Cedar Lake T by 2000 Feasibility Study |
June-91 |
| Cedar |
Lake |
Cedar Lake Dredge Feasibility Study (not funded by LARE) |
Oct-98 |
| Cedar |
Lake |
Cedar Lake Engineering Feasibility Study by Harza |
March-99 |
| Cedar |
Lake |
Cedar Lake Diagnostic Feasibility Study |
April-01 |
| Cedar |
Lake |
Contract Documents for Wetland Improvements to Improve the Water Quality of Cedar Lake |
June-02 |
| Cedar |
Lake |
Supporting Design Report for Wetland Improvements to Improve the Water Quality of Cedar Lake |
June-02 |
| Cedar |
Lake |
Cedar Lake Engineering Feasibility Study |
May-04 |
| Center |
Kosciusko |
Center Lake Diagnostic Study Report |
Jan-05 |
| Center |
Kosciusko |
Center Lake Engineering Feasibility Study |
Oct-06 |
| Center |
Kosciusko |
Center Lake Aquatic Plant Management Plan Update 2006 |
Feb-07 |
| Center |
Kosciusko |
Center Lake, Kosciusko County, Aquatic Plant Management Plan Update 2007 |
Feb-08 |
| Center |
Kosciusko |
Center Lake Aquatic Vegetation Management Plan 2008 |
Feb-09 |
| Chain O' Lakes |
Noble |
Chain O Lakes Watershed Diagnostic Study |
Oct-02 |
| Chapman Lakes |
Kosciusko |
Chapman Lake Diagnostic Study |
June-01 |
| Chapman Lakes |
Kosciusko |
Crooked Creek Design/Build Report |
Dec-03 |
| Chapman Lakes |
Kosciusko |
Chapman Lakes Engineering Feasibility Study |
Feb-03 |
| Chapman Lakes |
Kosciusko |
Arrowhead Drain Design Build Report |
Oct-04 |
| Chapman Lakes |
Kosciusko |
Lozier and Highland Park Drains Engineering Feasibility Study |
May-06 |
| Chapman Lakes |
Kosciusko |
Chapman Lakes Strategic Lakes Management Plan, Koskiusko County, Indiana |
Jan-07 |
| Chapman Lakes |
Kosciusko |
Chapman Lake Aquatic Vegetation Management Plan 2006 Update |
Feb-07 |
| Chapman Lakes |
Kosciusko |
Chapman Lakes Watershed Highland Drain Design - Build Project |
May-08 |
| Chapman Lakes |
Kosciusko |
Chapman Lakes Sediment Removal Plan |
May-09 |
| Clear |
LaPorte |
Clear Lake Enhancement Feasibility Study |
Aug-90 |
| Clear |
Steuben |
Clear Lake Steuben County Watershed Analysis |
June-93 |
| Clear |
LaPorte |
Clear Lake Alum Stormwater Treatment Evaluation |
June-95 |
| Clear |
LaPorte |
Clear Lake Enhancement Project Contract Documents for the Improvement of the Clear Lake Sediment Trap |
Sept-95 |
| Clear |
LaPorte |
Supporting Design Report for Improvement of the Clear Lake Sediment Trap |
Dec-95 |
| Clear |
LaPorte |
Clear Lake Stormwater Treatment System Preliminary Design Report |
Aug-97 |
| Clear |
LaPorte |
Technical Specifications for Clear Lake Stormwater Treatment System |
July-98 |
| Cox Ditch Watershed |
Vigo |
Cox Ditch and Otter Creek Macroinvertebrate Biomonitoring Results (1991-1994) |
June-95 |
| Cree |
Noble |
Feasibility Study for Cree and Shockopee Lakes |
Oct-90 |
| Cree |
Noble |
Cree Lake Aquatic Vegetation Management Plan |
March-05 |
| Crooked Lake |
Steuben |
Crooked Lake-Carpenter and Palfreyman Ditches Feasibility Study |
Sept-91 |
| Crooked Lake |
Steuben |
Crooked Lake Monitoring Study-Steuben County-May 26, 2003 |
May-03 |
| Crooked Lake |
Steuben |
Crooked Lake Engineering Feasibility Study |
April-05 |
| Crooked Lake |
Steuben |
Carpenter Drain Design/Build Report (Crooked Lake) |
June-05 |
| Crooked Lake |
Steuben |
Crooked Lake Aquatic Vegetation Management Plan 2007-2011 |
Feb-07 |
| Crooked Lake |
Steuben |
Steuben 4-H Park Stormwater, Sediment and Nutrient Reduction Project Design Report |
Jan-07 |
| Crooked Lake |
Steuben |
Crooked Lake Aquatic Vegetation Management Plan 2007 Update |
Feb-08 |
| Crooked Lake |
Steuben |
Crooked Lake Aquatic Vegetation Management Plan 2008 Update |
Feb-09 |
| Crooked Lake |
Steuben |
DRAFT Crooked Lake Aquatic Vegetation Management Plan 2009 Update |
Dec-09 |
| Crooked Lake |
Whitley |
Design Report-Inspection Plan, Operation & Maintenance Plan, & Post Construction Monitoring Plan |
Oct-95 |
| Crooked Lake |
Whitley |
Project Manual-Contract Documents & Specifications for the Crooked Lake Association Lake Enhancement Project |
Oct-95 |
| Crooked Lake |
Whitley |
Assessment of Watershed-Lake Interactions-Crooked Lake |
April-93 |
| Crooked Lake |
Whitley |
Spear Road Ravine Design/Build Report |
Sept-04 |
| Crooked, Chapman, Tippecanoe, Wawasee Lakes |
Steuben, Kosciusko
|
Littoral Zone Restoration Research Project 2007-2009 Year 1 Report |
Dec-07 |
| Crooked, Chapman, Tippecanoe, Wawasee Lakes |
Steuben, Kosciusko
|
Littoral Zone Restoration Research Project 2007-2009 Year 2 Report |
Feb-09 |
| Crooked, Chapman, Tippecanoe, Wawasee Lakes |
Steuben, Kosciusko
|
Littoral Zone Restoration Research Project 2007-2009 Year 3 Final Report |
Dec-09 |
| Curtis Creek |
Newton, Jasper |
Curtis Creek Watershed Diagnostic Study |
Apr-03 |
| Dewart |
Kosciusko |
Dewart Lake Diagnostic Study |
May-05 |
| Dewart |
Kosciusko |
Dewart Lake Engineering Feasibility Study |
May-07 |
| Dewart |
Kosciusko |
Dewart Lake Vegetation Management Plan Update, Kosciusko County, Indiana 2006 |
Feb-07 |
| Dewart |
Kosciusko |
Dewart Lake Vegetation Management Plan Update 2007-2011 |
Feb-08 |
| Dewart |
Kosciusko |
Dewart Lake Aquatic Vegetation Management Plan 2008 |
Mar-09 |
| Dewart |
Kosciusko |
DRAFT Dewart Lake Aquatic Vegetation Management Plan 2009 Update |
De-09 |
| Diamond and Hill |
Kosciusko |
Diamond and Hill Lakes AVMP - Revision 2007, Excerpt from Yellow Creek Lakes Diagnostic Study |
Mar-08 |
| Diamond and Hill |
Kosciusko |
Diamond and Hill Lakes Aquatic Vegetation Management Plan 2008-2012 |
Mar-09 |
| Duck Creek |
Franklin, Fayette |
DRAFT - Duck Creek Watershed Diagnostic |
May-08 |
| Eagle Creek Reservoir |
Marion |
Eagle Creek Park and Reservoir Shoreline Erosion Location & Assessment Survey |
Sept-94 |
| Fish |
LaGrange |
A Preliminary Assessment of Fish Lake |
Aug-90 |
| Fish |
LaPorte |
Final Feasibility Study |
May-90 |
| Fish |
LaGrange |
Fish and Royer Lakes Feasibility Study |
Feb-91 |
| Fish |
LaPorte |
Fish Lake Feasibility Study (Followup) |
March-92 |
| Fish |
LaPorte |
Fish Lake Aquatic Vegetation Management Plan Update 2006 |
Feb-07 |
| Fish |
LaPorte |
Aquatic Plant Management Plan Update, 2007 |
Dec-07 |
| Five Lakes (AKA "Indian Lakes") (Witmer, Westler, Dallas, Hackenberg, Messick) |
LaGrange |
Indian Lakes Improvement Project |
Jan-01 |
| Five Lakes (AKA "Indian Lakes") (Witmer, Westler, Dallas, Hackenberg, Messick) |
LaGrange |
PetitMill Pond Sediment Control Project Design Report |
July-04 |
| Five Lakes (AKA "Indian Lakes") (Witmer, Westler, Dallas, Hackenberg, Messick) |
LaGrange |
Five Lakes Engineering Feasibility Study |
July-04 |
| Five Lakes (AKA "Indian Lakes") (Witmer, Westler, Dallas, Hackenberg, Messick) |
LaGrange |
Five Lakes Aquatic Vegetation Management Plan Update 2006, LaGrange County, Indiana |
Feb-07 |
| Five Lakes |
LaGrange |
Five Lakes Watershed Management Plan Report |
July-06 |
| Five Lakes |
LaGrange |
Five Lakes Aquatic Vegetation Management Plan Update 2007 |
Feb-08 |
| Flat Creek Watershed |
Wells |
Flat Creek, Griffen Ditch, Fleming Ditch, and Somers Creek Watershed Diagnostic Study |
April-02 |
| Flint |
Porter |
Feasibility Study on Water Quality and Sedimentation-Flint Lake-Porter County, Indiana |
Dec-91 |
| Flint |
Porter |
Construction Specifications and Bid Documents-Flint Lake Enhancement Project |
June-95 |
| Flint |
Porter |
Project Manual Contract Documents and Specifications for Flint Lake |
Jan-99 |
| Flint |
Porter |
Design Report, Inspection Plan, Operation and Maintenance Plan, and Post Construction Monitoring Plan |
Feb-99 |
| Flint |
Porter |
Flint Lake Aquatic Vegetation Management Plan 2007-2011 |
Feb-07 |
| Flint |
Porter |
Flint Lake Aquatic Vegetation Management Plan 2007 Update |
Feb-08 |
| Four Lakes |
Marshall |
Four Lakes Watershed Diagnostic Study |
July-06 |
| Four Lakes (Cook, Holem, Kreighbaum, Millpond) |
Marshall |
Four Lakes Aquatic Vegetation Management Plan Update 2006 |
Feb-07 |
| Four Lakes |
Marshall |
Four Lakes Watershed Diagnostic Study |
July-05 |
| Gage & Lime |
Steuben |
Lake Gage and Lime Lake Engineering Feasibility Study |
Dec-05 |
| Gage & Lime |
Steuben |
Concorde Creek Channel Restoration Project Design Report |
May-08 |
| Gage & Lime |
Steuben |
Concorde Creek Channel Restoration Project Final As Built Report |
Dec-09 |
| Galbraith (Gilbert) |
Marshall |
Preliminary Study of Galbraith Lake (Gilbert) |
Jan-97 |
| Galena River Watershed |
LaPorte |
DRAFT Galena River Watershed Management Plan |
Dec-09 |
| Geist |
Marion & Hamilton |
DRAFT Geist Reservoir Aquatic Vegetation Management Plan 2009-2013 Marion Hamilton Counties 2009 Update |
Dec-09 |
| George |
Lake |
Fred Rose & Jerry Pavese Park Shoreline Stabilization Design Report |
Dec-04 |
| George |
Lake |
School City of Hobart Shoreline Stabilization Design Report |
Aug-05 |
| George |
Lake |
Fred Rose Park Shoreline Stabilization Project City of Hobart Lake County, Indiana |
Jan-07 |
| George |
Steuben |
Lake George Aquatic Vegetation Management Plan, Steuben County, Indiana, Branch County, Michigan, 2006-2010 |
Feb-07 |
| George |
Steuben |
Lake George Aquatic Vegetation Management Plan Update 2007-2011 |
Feb-08 |
| Greenwood |
Martin |
Lake Greenwood Diagnostic Study |
July-01 |
| Griffy |
Monroe |
Griffy Lake Aquatic Vegetation Management Plan |
Feb-05 |
| Griffy |
Monroe |
Griffy Lake Aquatic Vegetation Management Plan 2006 Update |
Feb-07 |
| Griffy |
Monroe |
Griffy Lake Aquatic Vegetation Management Plan 2007 Update |
Feb-08 |
| Griffy |
Monroe |
Griffy Lake Aquatic Vegetation Management Plan 2008 Update |
Feb-09 |
| Griffy |
Monroe |
DRAFT Griffy Lake Aquatic Vegetation Management Plan 2009 Update |
Dec-09 |
| Hamilton |
Steuben |
Hamilton Lake Feasibility Study |
Jan-90 |
| Hamilton |
Steuben |
Report for Environmental Review of Artificial Wetlands Designed to Enhance Water Quality of Hamilton Lake, Indiana |
Nov-91 |
| Hamilton |
Steuben |
Report of Subsurface Exploration and Laboratory Testing Hamilton Lake Enhancement Project Wetland Design Sites |
Nov-91 |
| Hamilton |
Steuben |
Contract Documents for Wetland Enhancements to Improve the Water Quality of Hamilton Lake |
Aug-99 |
| Hamilton |
Steuben |
Supporting Design Report for Wetland Development to Improve the Water Quality of Hamilton Lake |
Sept-99 |
| Hamilton |
Steuben |
Black Creek Engineering Feasibility Study |
Oct-06 |
| Hamiliton |
Steuben |
2007 Aquatic Plant Management Plan for Hamilton Lake in Steuben County, Indiana |
Feb-08 |
| Hamilton |
Steuben |
Aquatic Vegetation Management Plan Update 2008 |
Dec-08 |
| Hamilton |
Steuben |
Black Creek Restoration Plan Engineering Design Study |
Jan-09 |
| Hamilton |
Steuben |
Hamilton Lake Sediment Removal Plan |
Jan-09 |
| Hardy |
Jefferson and Scott |
Hardy Lake Watershed Diagnostic Study |
June-00 |
| Heaton |
Elkhart |
319 funded Heaton Lake Watershed Management Plan |
Jan-06 |
| Heaton |
Elkhart |
319 funded Heaton Lake WMP - Appendix A |
Jan-06 |
| Heaton |
Elkhart |
319 funded Heaton Lake WMP- Appendix B |
Jan-06 |
| Heaton |
Elkhart |
319 funded Heaton Lake WMP - Appendix C |
Jan-06 |
| Heaton |
Elkhart |
319 funded Heaton Lake WMP- Appendix D |
Jan-06 |
| Heaton |
Elkhart |
319 funded Heaton Lake WMP- Appendix E |
Jan-06 |
| Heaton |
Elkhart |
Heaton Lake Aquatic Plant Management Plan 2007-2011 |
Feb-08 |
| Heaton |
Elkhart |
Heaton Lake Aquatic Vegetation Management Plan 2008 |
Feb-09 |
| Heaton |
Elkhart |
DRAFT Heaton Lake Aquatic Vegetation Management Plan 2009 Update |
Dec-09 |
| Hill |
Kosciusko |
DRAFT Hill Lake Aquatic Vegetation Management Plan 2009 Update |
Dec-09 |
| Hudson |
LaPorte |
Hudson Lake Enhancement Feasibility Study |
Feb-91 |
| Hudson |
LaPorte |
Aquatic Vegetation Management Plan |
March-08 |
| Hudson |
LaPorte |
Hudson Lake Diagnostic Study |
June-08 |
| Hudson |
LaPorte |
DRAFT: Aquatic Vegetation Management Plan for Hudson Lake, LaPorte County, Update 2008 |
Dec-08 |
| Hudson |
LaPorte |
DRAFT Lake Aquatic Vegetation Management Plan 2009 Update |
Dec-09 |
| Huntingburg |
Dubois |
Feasibility Study For Huntingburg Lake |
Dec-90 |
| Indian Creek Watershed |
Greene, Lawrence, Martin, Monroe |
Diagnostic Study for Indian Creek Watershed |
Jan-01 |
| Indian Creek Watershed |
Pulaski, Fulton, Cass, White |
Indian Creek Watershed Diagnostic Study |
Sept-03 |
| Indian Creek Watershed |
Johnson |
The Indian Creek Watershed: To Preserve and Protect Water Quality (EPA 319 Project through IDEM) |
Mar-09 |
| James, Snow Lake, Big Otter Lake and Little Otter Lake |
Steuben |
Lake Diagnostic Study - Lake James, Snow Lake, Big Otter and Little Otter Lakes |
Oct-06 |
| James |
Steuben |
Lake James Croxton Ditch Watershed Feasibility Study |
Sept-91 |
| Jimmerson |
Steuben |
Jimmerson Lake Diagnostic Study |
Jan-03 |
| Jimmerson |
Steuben |
Engineering Feasibility Study for Jimmerson Lake |
Jan-05 |
| Jimmerson |
Steuben |
Jimmerson Lake Aquatic Vegetation Management Plan Update, Steuben County, Indiana, 2006 |
Dec-06 |
| Jimmerson |
Steuben |
Aquatic Plant Management Plan Update, 2007 |
Feb-08 |
| Juday Creek Watershed |
St Joseph |
Juday Creek Watershed Feasibility Study |
March-02 |
| Kokomo Creek Watershed |
Howard |
Rapid Bioassessment of the Kokomo Creek Watershed using Benthic Macroinvetebrates |
May-00 |
| Kokomo Creek Watershed |
Howard |
Kokomo Creek Watershed Final Water Quaity Monitoring |
Aug-05 |
| Koontz |
Marshall |
DRAFT Diagnostic Study of Koontz Lake Indiana conducted by SEC, Inc. for US Army COE |
Oct-99 |
| Koontz |
Starke, Marshall |
The Cultural Eutrophication of Koontz Lake Indiana |
Dec-88 |
| Koontz |
Starke, Marshall |
Koontz Lake Sediments Analysis |
May-90 |
| Koontz |
Starke, Marshall |
Koontz Lake Aquatic Vegetation Management Plan 2008-2012 Marshall and Starke Counties, Indiana |
Feb-09 |
| Koontz |
Starke, Marshall |
DRAFT Koontz Lake Watershed Managment Plan |
Dec-09 |
| Lake of the Woods |
Marshall |
Diagnostic Feasibility Study of the Lake of the Woods Marshall Co., Indiana |
Feb-82 |
| Lake of the Woods |
Marshall |
Lake of the Woods Feasibility Study |
Dec-91 |
| Lake of the Woods |
Marshall |
Lake of the Woods Aquatic Vegetation Management Plan |
March-05 |
| Lake of the Woods |
Marshall |
Lake of the Woods Watershed Management Plan |
June-05 |
| Lake of the Woods |
Marshall |
Lake of the Woods Vegetation Management Plan Update, Marshall County, Indiana, 2006 |
Feb-07 |
| Lake of the Woods |
Marshall |
Lake of the Woods Vegetation Management Plan Update 2007-2011 |
Dec-07 |
| Lake of the Woods |
Marshall |
Lake of the Woods AVMP 2008 Update |
Feb-09 |
| LaPorte Lakes (Pine, Stone, Harris, Lily, Clear, Lower Lakes) |
LaPorte |
LaPorte Lakes Diagnostic Study for City of LaPorte |
May-07 |
| LaPorte Lakes (Pine, Stone, Harris, Lily, Clear, Lower) |
LaPorte |
City of LaPorte Lakes Aquatic Vegetation Plan 2008-2012 |
Feb-08 |
| LaPorte Lakes (Pine, Stone, Harris, Lily, Clear, Lower) |
LaPorte |
City of LaPorte Lakes Aquatic Vegetation Management Plan 2008 Update |
Feb-09 |
| LaPorte Lakes (Pine, Stone, Harris, Lily, Clear, Lower) |
LaPorte |
DRAFT City of LaPorte Lakes Aquatic Vegetation Management Plan 2009 Update |
Dec-09 |
| Lemon |
Monroe |
Sedimentation in Lake Lemon, Monroe County, Indiana |
June-74 |
| Lemon |
Monroe |
Lake Lemon Aquatic Vegetation Management Plan 2007 Update |
Feb-08 |
| Lemon |
Monroe |
Lake Lemon Aquatic Vegetation Management Plan Update 2006 |
Feb-07 |
| Lemon |
Monroe |
Lake Lemon Diagnostic/Feasibility Study |
April-86 |
| Lemon |
Monroe |
Lake Lemon T by 2000 Feasibility Study |
July-92 |
| Lemon |
Monroe |
Feasibility Study for a Biotechnical Shoreline Stabilization Project |
Feb-97 |
| Lemon |
Monroe |
Biotechnical Shoreline Stabilization Project |
June-97 |
| Lemon |
Monroe |
Contract Documents & Specifications-Lake Lemon-Areas 1A, 1C, and 3B Shoreline Stabilization |
Jan-98 |
| Lemon |
Monroe |
Lake Lemon Shoreline Stabilization-Project Manual-Areas 2a, 2b, and 2c |
June-00 |
| Lemon |
Monroe |
Lake Lemon Shoreline Stabilization-Project Manual-Area 3c |
June-01 |
| Lemon |
Monroe |
Lake Lemon Shoreline Stabilization-Project Manual-Area 1b |
June-01 |
| Lemon |
Monroe |
Lake Lemon Watershed Management Plan |
Jan-02 |
| Lemon |
Monroe |
Lake Lemon Aquatic Vegetation Management Plan 2000-2003 |
Feb-03 |
| Lemon |
Monroe |
Lake Lemon Aquatic Vegetation Management Plan |
Feb-05 |
| Lemon |
Monroe |
Lake Lemon Aquatic Vegetation Management Plan-2006 Update |
Feb-06 |
| Little River |
Whitley, Allen and Huntington |
Little River Watershed Diagnostic Study |
Jan-09 |
| Little Turkey |
LaGrange |
Little Turkey Lake Aquatic Vegetation Management Plan 2007-2011 |
Mar-08 |
| Little Turkey |
LaGrange |
Little Turkey Lake Aquatic Vegetation Management Plan 2008 Update |
Feb-09 |
| Little Turkey |
LaGrange |
DRAFT Little Turkey Lake Aquatic Vegetation Management Plan 2009 Update |
Dec-09 |
| Little Blue River Watershed |
Shelby, Rush |
Little Blue River Watershed Diagnostic Study |
April-04 |
| Little Pipe Creek Watershed |
Miami |
Rapid Bioassessment of the Little Pipe Creek Watershed Using Benthic Macroinvertebrates |
Oct-95 |
| Loefler and Scott Ditches Watershed |
Gibson |
Loefler and Scott Ditches Watershed Diagnostic Study |
Dec-09 |
| Long |
Porter |
Long Lake Aquatic Vegetation Management Plan 2008-2012 |
Feb-08 |
| Long |
Porter |
Long Lake Aquatic Vegetation Management Plan 2008 Update |
Feb-09 |
| Long |
Porter |
DRAFT Long Lake Aquatic Vegetation Management Plan 2009 Update |
Dec-09 |
| Loon |
Whitley |
Feasibility Studies of Loon Lake and Goose Lake |
March-92 |
| Loon |
Whitley |
Design Report Inspection Plan O & M Plan Monitoring Plan |
Dec-97 |
| Loon |
Whitley |
Loon Lake Project Manual Contract Documents and Specifications |
Dec-97 |
| Lost River Watershed |
Orange |
Lost River Watershed Final Water Quality Monitoring Study |
Sept-06 |
| Manitou |
Fulton |
History of Cultural Eutrophication at Lake Manitou and Prospects for its Management |
Jan-87 |
| Manitou |
Fulton |
Project Manual Lake Manitou Graham Ditch Site |
July-90 |
| Manitou |
Fulton |
Project Manual Lake Manitou Robbins-Taylor Site |
July-90 |
| Manitou |
Fulton |
Project Manual Lake Manitou Marsteller Site |
July-90 |
| Manitou |
Fulton |
Lake Manitou Vegetation Management Plan Update, Fulton County, Indiana, 2005 |
Mar-06 |
| Manitou |
Fulton |
Lake Manitou Vegetation Management Plan Update, Fulton County, Indiana, 2006 |
Feb-07 |
| Manitou |
Fulton |
Lake Manitou, Graham Ditch Wetland Project Manual |
March-96 |
| Manitou |
Fulton |
Inspection, Operation and Maintenance, and Post Construction and Monitoring Plans and Design Report |
June-96 |
| Manitou |
Fulton |
Inspection, Operation and Maintenance, and Post Construction and Monitoring Plans and Design Report-w Revised Design Structure |
Dec-97 |
| Manitou |
Fulton |
Lake Manitou Aquatic Vegetation Management Plan |
March-05 |
| Manitou |
Fulton |
Lake Manitou Sediment Removal Plan |
July-07 |
| Manitou |
Fulton |
Lake Manitou AVMP Update |
March-08 |
| Manitou |
Fulton |
Lake Manitou Aquatic Vegetation Management Plan 2008 Update |
Feb-09 |
| Manitou |
Fulton |
DRAFT Lake Manitou Aquatic Vegetation Management Plan 2009 Update |
DEC-09 |
| Maxinkuckee |
Marshall |
Project Manual-Kline Ditch |
July-90 |
| Maxinkuckee |
Marshall |
Project Manual-Curtiss Ditch Wetland |
July-90 |
| Maxinkuckee |
Marshall |
Lake Maxinkuckee Lake and Watershed Management Plan |
July-06 |
| Maxinkuckee |
Marshall |
Lake Maxinkuckee Aquatic Plant Management Plan Update 2006 |
Feb-07 |
| Maxinkuckee |
Marshall |
Lake Maxinkuckee Shoreline Revegetation Project 2007 |
Sept-09 |
| Meserve |
Steuben |
Aquatic Vegetation Management Plan Update 2008-2012 |
Dec-08 |
| Meserve |
Steuben |
DRAFT Meserve Lake Aquatic Vegetation Management Plan 2009 Update |
Dec-09 |
| Mill Pond |
LaPorte |
Union Mills: A study for the improvement, Restoration, and Protection of Mill Pond |
Feb-90 |
| Mill Pond |
LaPorte |
Project Manual-Sediment Trap-Mill Pond |
Feb-93 |
| Mississinewa River Watershed |
Randolph, Delaware, Jay |
Watershed Diagnostic Study for Mississinewa River |
Feb-01 |
| Mississinewa River Watershed |
Randolph, Delaware, Jay |
Watershed Diagnostic Study for Mississinewa River (Phase 2) |
June-04 |
| Mississinewa River Watershed |
Randolph, Delaware, Jay |
Watershed Diagnostic Study for Mississinewa River (Phase 3) |
Oct-06 |
| Monroe |
Monroe |
Lake Monroe Pilot Watershed Study |
Sept-96 |
| Mud Pine Creek Watershed |
Benton |
Upper Mud Pine Creek Watershed Diagnostic Study |
Oct-02 |
| Myers |
Marshall |
Myers Lake Watershed Feasibility Study |
Feb-03 |
| Myers & Lawrence |
Marshall |
Myers-Lawrence Lakes Diagnostic Study |
May-00 |
| Nyona & South Mud |
Fulton |
Nyona Lake-South Mud Lake-A study for the Improvement, Restoration, and Protection |
June-90 |
| Oliver, Olin, Martin |
LaGrange |
Oliver, Olin, Martin Lakes Diagnostic Study |
Oct-09 |
| Palestine |
Kosciusko |
Palestine Lake Watershed Diagnostic Study |
April-08 |
| Pigeon Creek Watershed |
Vanderburgh |
Pigeon Creek Watershed Diagnostic Study, Vol 2, McFadden Creek Watershed Bioassessment Study |
Oct-00 |
| Pigeon Creek Watershed |
Vanderburgh |
Pigeon Creek Watershed Diagnostic Study, Vol 1 |
Sept-01 |
| Pigeon Creek Watershed |
Vanderburgh |
Pigeon Creek Watershed Diagnostic Study - Volume 3- Appendices |
Jan-01 |
| Pike |
Kosciusko |
Pike Lake Feasibility Study |
Dec-90 |
| Pine |
LaPorte |
Pine Lake Aquatic Vegetation Management Plan |
Feb-05 |
| Pine |
LaPorte |
Pine Lake Aquatic Vegetation Management Plan-2006 Update |
Feb-06 |
| Pine |
LaPorte |
Pine Lake AVMP Update 2006 |
Feb-07 |
| Pipe Creek Watershed |
Howard |
Rapid Bioassessment of Pipe Creek Watershed |
May-03 |
| Pipe Creek Watershed |
Howard, Miami, Grant |
Watershed Diagnostic Study for Pipe-Creek-Potter Ditch and subwatersheds |
Oct-03 |
| Pleasant |
Steuben |
Lake Pleasant Aquatic Vegetation Management Plan Update, Steuben County, Indiana 2006 |
Dec-06 |
| Pleasant & Riddles |
St Joseph |
Pleasant and Riddles Lakes Sediment Removal Plan |
Jan-06 |
| Pleasant & Riddles |
St Joseph |
Pleasant and Riddles Lakes Watershed Diagnostic Study |
May-06 |
| Pleasant & Riddles |
St Joseph |
Final Report Dredging Project Lake Riddles, St. Joseph County, Indiana |
Dec-06 |
| Pleasant & Riddles |
St Joseph |
Pleasant and Riddles Lakes Aquatic Vegetation Management Plan 2007-2011 |
Feb-07 |
| Pleasant & Riddles |
St. Joseph |
Pleasant and Riddles Lakes Aquatic Vegetation Management Plan 2007 Update |
Feb-08 |
| Pleasant & Riddles |
St Joseph |
DRAFT Pleasant and Riddles Lakes Aquatic Vegetation Management Plan 2009 Update |
Dec-09 |
| Pretty |
LaGrange |
Pretty Lake Diagnostic Study in LaGrange County, Indiana |
April-07 |
| Pretty |
LaGrange |
Pretty Lake Aquatic Vegetation Management Plan 2007 Update |
Feb-08 |
| Pretty |
LaGrange |
Engineering Feasibility Study for Pretty Lake August 2009 |
Aug-09 |
| Pretty |
Marshall |
Pretty Lake Aquatic Vegetation Management Plan 2008 Update |
Feb-09 |
| Pretty |
Marshall |
Pretty Lake Aquatic Vegetation Management Plan 2007-2011 |
Feb-07 |
| Pretty |
Marshall |
Pretty Lake Diagnostic Study |
June-09 |
| Pretty |
Marshall |
DRAFT Pretty Lake Aquatic Vegetation Management Plan 2009 Update |
Dec-09 |
| Prides Creek Lake |
Pike |
Feasibility Study Prides Creek Lake |
Feb-89 |
| Prides Creek Lake |
Pike |
Contract Documents |
Feb-89 |
| Prides Creek Lake |
Pike |
Design Report |
Aug-90 |
| Rhodes Creek |
Morgan |
Rapid Bioassessment of the Rhodes Creek Watershed |
Oct-96 |
| Ridinger |
Kosciusko |
Feasibility Study for the Restoration of Ridinger Lake |
Oct-90 |
| Ridinger |
Kosciusko |
Ridinger Lake Watershed Diagnostic Study |
Nov-04 |
| Ridinger |
Kosciusko |
Ridinger Lake Aquatic Vegetation Management Plan 2008-2012 |
Feb-08 |
| Ridinger |
Kosciusko |
Ridinger Lake Aquatic Vegetation Management Plan 2008 Update |
Feb-09 |
| Rock |
Fulton, Kosciusko |
Rock Lake Aquatic Vegetation Management Plan |
Feb-05 |
| Rock |
Fulton, Kosciusko |
Rock Lake Aquatic Vegetation Management Plan Update 2005 |
Feb-06 |
| Rock |
Fulton, Kosciusko |
Rock Lake Aquatic Vegetation Management Plan Update 2006 |
Feb-07 |
| Rock |
Fulton, Kosciusko |
Rock Lake Diagnostic Study |
Aug-09 |
| Salinda |
Washington |
Feasibility Study For Lake Salinda |
Mar-90 |
| Salt Creek Watershed |
Decatur, Franklin |
DRAFT: Salt Creek Watershed Diagnostic Study |
Dec-08 |
| Sand Creek Watershed |
Decatur |
Sand Creek Watershed Management Plan 1999-2009 |
June-01 |
| Sand Creek Watershed |
Decatur |
Sand Creek Watershed Bioassessment Report |
May-04 |
| Shafer |
White |
Lake Shafer Preliminary Investigation |
Dec-88 |
| Shafer |
White |
Soil Tests Lake Shafer |
Apr-93 |
| Shafer |
White |
Lake Shafer Feasibility Study |
Mar-95 |
| Shafer |
White |
Lake Shafer Lake Enhancement Project Design Documents |
June-96 |
| Shafer |
White |
Contract Documents and Specifications for the Lake Shafer-Lake Enhancement Project-Area 1: Honey Creek-Lake Dredging and Sediment Placement Site Contracts |
Jan-97 |
| Shafer |
White |
Proposal for Placement Alternatives-Lakes Shafer and Freeman Lake Dredging Project |
Mar-99 |
| Shafer |
White |
Contract Documents and Specifications for the Lake Shafer-Lake Enhancement Project-Wooldridge Sediment Placement Site Contract |
Oct-99 |
| Shafer |
White |
Final Report Lake Shafer Dredging Project Sediment Sampling & Analysis, Vol. 2 |
July-00 |
| Shafer |
White |
Final Report Lake Shafer Dredging Project Sediment Sampling & Analysis, Vol. 1 |
July-00 |
| Shakamak |
Greene |
Lake Shakamak Feasibility Study and Management Plan |
Aug-89 |
| Shipshewana |
LaGrange |
Shipshewana Lake Restoration Feasibility Study |
Mar-89 |
| Shipshewana |
LaGrange |
Field Methods Manual-Revised Volunteer Monitoring Program-Shipshewana Lake |
May-91 |
| Shipshewana |
LaGrange |
Shipshewana Lake Pre-design Report |
Jan-96 |
| Shipshewana |
LaGrange |
Shipshewana Lake Shoreline Stabilization Project |
May-97 |
| Shipshewana |
LaGrange |
Shipshewana Lake Restoration Project Constructed Wetlands Phase |
March-98 |
| Shipshewana |
LaGrange |
Contract Documents and Specifications for the Construction of Shipshewana Lake Restoration Project: Two Constructed Wetlands |
March-98 |
| Shipshewana |
LaGrange |
Contract Documents and Specifications for the Hydraulic Dredging of Shipshewana Lake |
March-98 |
| Shipshewana |
LaGrange |
Shipshewana Lake Dredging Project |
April-98 |
| Shipshewana |
LaGrange |
Lake Shipshewana Aquative Vegetation Management Plan 2006-2010 |
Feb-07 |
| Shipshewana |
LaGrange |
Shipshewana Lake Aquatic Vegetation Management Plan Update 2007-2011 |
Feb-08 |
| Shipshewana |
LaGrange |
Shipshewana Lake Aquatic Vegetation Management Plan 2008 Update |
Feb-09 |
| Shipshewana |
LaGrange |
DRAFT Shipshewana Lake Aquatic Vegetation Management Plan 2009 Update |
Dec-09 |
| Silver |
Kosciusko |
Silver Lake Diagnostic Study |
Feb-01 |
| Silver |
Kosciusko |
Silver Lake Aquatic Vegetation Management Plan |
March-05 |
| Silver |
Kosciusko |
Silver Lake Aquatic Vegetation Management Plan-updated 2006 |
March-06 |
| Silver |
Kosciusko |
Silver Lake Vegetation Management Plan Update, Kosciusko County, Indiana 2006 |
Feb-07 |
| Silver |
Kosciusko |
Silver Lake Vegetation Management Plan Update 2007-2011 |
Feb-08 |
| Silver |
Kosciusko |
Silver Lake 2008 Aquatic Vegetation Management Plan Update |
Feb-09 |
| Silver |
Kosciusko |
DRAFT Silver Lake Aquatic Vegetation Management Plan 2009 Update |
Dec-09 |
| Silver Creek and Hanna's Creek |
Union |
Silver Creek and Hanna's Creek Watershed Diagnostic Study |
July-02 |
| Skinner |
Noble |
Impact of Land Treatment on the Restoration of Skinner Lake, Noble County, Indiana |
Dec-82 |
| Skinner |
Noble |
Effects of Watershed Management Practices on the Fish Community at Skinner Lake |
Jan-87 |
| Skinner |
Noble |
Skinner Lake Water Quality Analysis 1990-91 Assessment of Wetland Reconstruction |
Nov-91 |
| Skinner |
Noble |
Paleolimnological Assessment of the Effectivness of a Constructed Sedimentation Basin at Reducing Sediment and Nutrient Loading to Skinner Lake, Indiana |
May-92 |
| Skinner |
Noble |
Skinner Lake AGNPS Comparison of Pre-Treatment and Post-Treatment Sediment and Nutrient Loading |
May-92 |
| Skinner |
Noble |
Skinner Lake Aquatic Vegetation Management Plan |
Mar-05 |
| Skinner |
Noble |
Skinner Lake Engineering Feasibility Study, Noble County |
April-07 |
| Skinner |
Noble |
Skinner Lake (Rimmell Ditch) Design-Build Report |
April-09 |
| Smalley |
Noble |
Smalley Lake Diagnostic Study-Noble and Whitley Counties |
June-04 |
| Stone and Brokesha |
LaGrange |
2007 Aquatic Plant Management Plan for Stone and Brokesha Lakes in LaGrange County, Indiana |
Feb-08 |
| Stone and Brokesha |
LaGrange |
Aquatic Vegetation Management Plan Update 2008 |
Dec-08 |
| Sullivan |
Sullivan |
Project Manual for Sullivan Lake Shoreline Stabilization |
Mar-91 |
| Sullivan |
Sullivan |
Sullivan Lake Feasibility Study |
Mar-91 |
| Sullivan |
Sullivan |
DRAFT Lake Sullivan Sediment Removal Plan and Nutrient and Sediment Load Reduction Plan |
Aug-09 |
| Sylvan |
Noble |
Sylvan Lake-A final Feasibility Report |
May-90 |
| Sylvan |
Noble |
Sylvan Lake Enhancement Project: Phase II Non-Point Source Pollution Model Results |
June-91 |
| Sylvan |
Noble |
Contract Documents for Wetland Enhancements to Improve the Water Quality of Sylvan Lake |
Sept-97 |
| Sylvan |
Noble |
Supporting Design Report for Wetland Enhancements to Improve the Water Quality of Sylvan Lake |
Sept-97 |
| Sylvan |
Noble |
Sylvan Lake Sediment Control Structure-As Built Report |
June-99 |
| Sylvan |
Noble |
Sylvan Lake Aquatic Vegetation Management Plan |
Mar-08 |
| Sylvan |
Noble |
Sylvan Lake Aquatic Vegetation Management Plan Revision 2008 |
Mar-09 |
| Sylvan |
Noble |
DRAFT Sylvan Lake Aquatic Vegetation Management Plan 2009 Update |
Dec-09 |
| Syracuse |
Kosciusko |
Syracuse Stormwater Conveyance System-Design Summary |
July-04 |
| Syracuse |
Kosciusko |
Syracuse Stormwater Conveyance System-Project Manual |
July-04 |
| Syracuse |
Kosciusko |
Syracuse Stormwater Conveyance System-Drainage Report |
July-04 |
| Syracuse |
Kosciusko |
Syracuse Lake Aquatic Vegetation Management Plan |
Mar-05 |
| Syracuse |
Kosciusko |
Syracuse Lake Vegetation Management Plan Update, Kosciusko County, Indiana 2006 |
Feb-07 |
| Syracuse |
Kosciusko |
DRAFT Syracuse Lake Aquatic Vegetation Management Plan 2009 Update |
Dec-09 |
| Syracuse |
Kosciusko |
DRAFT Syracuse Lake Emergent Vegetation Survey 2009 Update |
Dec-09 |
| Ten Lakes in LaGrange County |
LaGrange |
Feasibility Studies of Ten LaGrange County Lakes |
Oct-92 |
| Tippecanoe |
Kosciusko |
Lake Tippecanoe Diagnostic Study |
June-97 |
| Tippecanoe |
Kosciusko |
Lake Tippecanoe Feasibility Study |
Oct-98 |
| Tippecanoe |
Kosciusko |
Design Summary-Hanna B. Walker Drain Sediment Trap |
Feb-00 |
| Tippecanoe |
Kosciusko |
Lake Tippecanoe Henwood Creek Restoration Project |
Oct-00 |
| Tippecanoe |
Kosciusko |
Indian Creek Detention Basins |
Oct-00 |
| Tippecanoe |
Kosciusko |
Design Summary-Kuhn Ditch Tributary: Lake Tippecanoe Watershed Warner Historical Farms Restoration |
Feb-02 |
| Tippecanoe |
Kosciusko |
Lake Tippecanoe Palmer Design Build Report |
May-03 |
| Tippecanoe |
Kosciusko |
Langohr Sediment Trap Design Build Report-Lake Tippecanoe Watershed |
April-04 |
| Tippecanoe |
Kosciusko |
Lake Tippecanoe Aquatic Vegetation Management Plan |
Feb-05 |
| Tippecanoe |
Kosciusko |
Lake Tippecanoe Aquatic Vegetation Management Plan-2006 Update |
Feb-06 |
| Tippecanoe |
Kosciusko |
Lake Tippecanoe Storm Drain Project |
March-06 |
| Tippecanoe |
Kosciusko |
Ecozone Feasibility-Lake Tippecanoe, Koskiusko County, Indiana |
Jan-07 |
| Tippecanoe |
Kosciusko |
Lake Tippecanoe Aquatic Vegetation Management Plan Update 2006 |
Feb-07 |
| Tippecanoe |
Kosciusko |
Lake Tippecanoe Aquatic Vegetation Management Plan Update 2007 |
Feb-08 |
| Tippecanoe |
Kosciusko |
Lake Tippecanoe Aquatic Vegetation Management Plan |
Feb-08 |
| Tippecanoe |
Kosciusko |
DRAFT Lake Tippecanoe Aquatic Vegetation Management Plan 2009 Update |
Dec-09 |
| Tippecanoe |
Noble and Whitley Counties |
Upper Tippecanoe River and Lake Association (UTRLA) Seven Lakes Diagnostic Study and Watershed Management Plan |
June-08 |
| Tippecanoe Chain |
Kosciusko |
Tippecanoe Chain 2008 Ecozone Survey Report |
Feb-09 |
| Tippecanoe River Watershed |
Kosciusko |
FINAL DRAFT Upper Tippecanoe River Watershed Management Plan |
July-06 |
| Tri-Lakes |
Whitley |
Tri-Lakes Watershed Feasibility Study |
June-92 |
| Tri-Lakes |
Whitley |
Tri-Lakes Design Report Whitley County Indiana |
Dec-05 |
| Tri-Lakes |
Whitley |
Tri-Lakes Final Report Henny Property Project, Whitley County, Indiana (Construction) |
Nov-07 |
| Turkey Creek Watershed |
Steuben |
Monitoring Study for the Turkey Creek Watershed Land Treatment Project Area |
April-02 |
| Twelve Mile Creek Watershed |
Cass |
A Measurement of Water Quality in the Twelve Mile Creek Watershed Following Watershed Land Treatments |
Sept-06 |
| Upper Laughery Creek Watershed |
Franklin, Decatur, Ripley |
Rapid Bioassessment of Upper Laughery Creek Watershed |
Oct-94 |
| Upper Laughery Creek Watershed |
Franklin, Decatur, Ripley |
Rapid Bioassessment of Upper Laughery Creek Watershed |
May-99 |
| Upper Long |
Noble |
Upper Long Lake Watershed Noble County, Indiana Diagnostic Study |
Apr-98 |
| Village |
Noble |
Village Lake Tributary Stream Stabilization As-Built Engineering Design Report |
Sept-09 |
| Wabash |
Adams |
Monitoring Water Quality of the Wabash River in Adams County using a Rapid Bioassessment Technique |
Nov-97 |
| Wabash |
Mulitple |
The Wabash River Ecosystem II-by Dr. James Gammon |
Mar-95 |
| Wall |
LaGrange |
Wall Lake Aquatic Vegetation Management Plan, Update, LaGrange County, Indiana, 2006 |
Dec-06 |
| Wall |
LaGrange |
Lake Diagnostic Study |
Mar-06 |
| Wall |
LaGrange |
Aquatic Plant Management Plan Update |
Feb-08 |
| Wall |
LaGrange |
Aquatic Vegetation Management Plan Update 2008 |
Dec-08 |
| Wall |
LaGrange |
DRAFT Wall Lake Aquatic Vegetation Management Plan 2009 Update |
Dec-09 |
| Waubee |
Kosciusko |
Diagnostic Feasibility Study of Lake Waubee Kosciusko County, Indiana |
Jan - 82 |
| Waubee |
Kosciusko |
Waubee Lake Report |
July-02 |
| Waubee |
Kosciusko |
Waubee Lake Aquatic Vegetation Management Plan |
Mar-05 |
| Waubee |
Kosciusko |
Waubee Lake Sediment Removal Plan |
Sept-05 |
| Waubee |
Kosciusko |
Waubee Lake Vegetation Management Plan Update, Kosciusko County, Indiana 2006 |
Feb-07 |
| Waveland |
Montgomery |
Feasibility Study of Lake Waveland and its Watershed Montgomery County and Parke County, Indiana |
Jan-91 |
| Waveland |
Montgomery |
Rapid Bioassessment of the Lake Waveland Watershed using Benthic Macroinvertebrates |
Nov-00 |
| Waveland |
Montgomery |
Waveland Lake Aquatic Vegetation Management Plan |
Feb-05 |
| Waveland |
Montgomery |
Waveland Lake Aquatic Vegetation Management Plan |
Feb-08 |
| Waveland |
Montgomery |
DRAFT Lake Waveland Aquatic Vegetation Management Plan 2009 Update |
Dec-09 |
| Wawasee |
Kosciusko |
Enchanted Hills Watershed Evaluation-Wawasee Watershed |
Nov-95 |
| Wawasee |
Kosciusko |
Lake Enhancement Diagnostic-Feasibility Study for the Wawasee Area Watershed |
Mar-96 |
| Wawasee |
Kosciusko |
Lake Wawasee Engineering Feasibility Study |
May-01 |
| Wawasee |
Kosciusko |
Griffith's Island Design Build Report |
Sept-04 |
| Wawasee |
Kosciusko |
Martin Creek Outlet Design Build Report |
Nov-04 |
| Wawasee |
Kosciusko |
Dillon Creek Sediment Control Project draft report |
Nov-05 |
| Wawasee |
Kosciusko |
Lake Wawasee Aquatic Vegetation Plan 2005 |
Feb-06 |
| Wawasee |
Kosciusko |
Wawasee Area Watershed Management Plan, Elkhart, Kosciusko and Noble counties |
Apr-07 |
| Wawasee |
Kosciusko |
Lake Wawasee Aquatic Plant Management Plan Update 2006 (WARNING - this file is 52MB and may take a very long time to download. If you would like to have a CD of this file mailed to you, please send your mailing address to lare@dnr.IN.gov |
June-07 |
| Wawasee |
Kosciusko |
Bayshore (Lake Wawasee) Design Report - Kosciusko, County |
Nov-07 |
| Wawasee |
Noble |
Wawasee Turkey Creek Sediment Trap |
April-08 |
| Wawasee |
Kosciusko |
Lake Wawasee, Kosciusko County Emergent Vegetation Survey in Ecozone areas of Johnson and Conklin Bay and Tier II Survey Results - 2008 |
Mar-09 |
| Wawasee |
Kosciusko |
DRAFT Lake Wawasee Aquatic Vegetation Management Plan 2009 Update |
Dec-09 |
| Webster |
Kosciusko |
Webster Lake/The Backwaters Diagnostic Study |
Nov-00 |
| Webster |
Kosciusko |
North Webster Storm Drain Engineering Feasibility Study |
Oct-02 |
| Webster |
Kosciusko |
Webster Lake Engineering Feasibility Study |
May-04 |
| Webster |
Kosciusko |
Webster Lake Aquatic Vegetation Management Plan |
Feb-05 |
| Webster |
Kosciusko |
Webster Lake Aquatic Vegetation Management Plan-2006 Update |
Feb-06 |
| Webster |
Kosciusko |
Webster Lake Aquatic Vegetation Management Plan Update 2006 |
Feb-07 |
| Webster |
Kosciusko |
Webster Lake - Culver Property Storm Water Filtration Report |
Mar-07 |
| Webster |
Kosciusko |
Webster Lake Aquatic Vegetation Management Plan 2007 Update |
Feb-08 |
| Webster |
Kosciusko |
Aquatic Vegetation Management Plan 2008 Update |
Feb-09 |
| Webster |
Kosciusko |
DRAFT Lake Aquatic Vegetation Management Plan 2009 Update |
Dec-09 |
| West Boggs |
Daviess |
West Boggs Lake Enhancement Design Project Vol 1, Contract Documents and Specifications |
Sept-94 |
| West Boggs |
Daviess |
West Boggs Lake Enhancement Design Project Vol 2 - Inspection Plan Operations and Maintenance Plan Post Construction Monitoring Plan Design Project Report Permit Documents |
Sept-94 |
| West Boggs |
Daviess |
LARE Shoreline Project Design Summary |
July-01 |
| West Boggs |
Daviess |
Lake Enhancement Feasibility Study |
Aug-91 |
| West Boggs |
Daviess |
LARE Shoreline Project Construction Summary |
July-01 |
| West Boggs |
Daviess |
Post Construction Monitoring Study for West Boggs Reservoir |
June-02 |
| West Lakes |
Noble |
West Lakes Sediment Removal Plan |
Sept-05 |
| West Otter |
Steuben |
Draft Engineering Feasibility Study |
Sept-09 |
| West Otter |
Steuben |
West Otter Lake Aquatic Vegetation Management Plan Update, Steuben County, Indiana, 2006 |
Dec-06 |
| West Otter |
Steuben |
Aquatic Plant Management Plan |
Apr-05 |
| Whetten Ditch, Solomon Creek, Dry Run-Elkhart River Watersheds |
Elkhart, Kosciusko, Noble |
Whetten Ditch, Solomon Creek, & Dry Run Watersheds Diagnostic Study |
Aug-02 |
| White River Watershed |
Marion |
Kingfisher Project |
July-96 |
| Wildcat Creek |
Clinton |
Wildcat Creek Bioassess |
Oct-94 |
| Wildcat Creek |
Clinton |
Wildcat Creek Bioassess |
2004 |
| Winona |
Kosciusko |
Winona Lake, Kosciusko County, Aquatic Plant Management Plan Update 2007 |
Feb-08 |
| Winona |
Kosciusko |
Winona Lake Feasibility-Design Study |
July-91 |
| Winona |
Kosciusko |
Contract Documents for Peterson Ditch Streambank Stabilization Design Project |
Dec-96 |
| Winona |
Kosciusko |
Design Report for the Streambank Stabilization of Peterson Ditch Lake Winona |
Dec-96 |
| Winona |
Kosciusko |
Geomorphic Reconnaissance for Channel Stability Management Peterson Ditch Kosciusko County, Indiana |
Jan-99 |
| Winona |
Kosciusko |
Design Summary Peterson Ditch Winona Lake Kosciusko County Indiana |
Mar-02 |
| Winona |
Kosciusko |
Winona Lake Bank Stabilization Project Design Build Report |
Aug-09 |
| Wolf |
Lake |
Diagnostic-Feasibility Study of Wolf Lake, Cook County, Illinois and Lake County, Indiana |
Oct-96 |
| Wolf Creek Watershed |
Jay |
Rapid Bioassessment of the Wolf Creek Watershed Using Benthic Macroinvertebrates |
Nov-01 |
| Yellow Creek Lakes |
Kosciusko |
Yellow Creek Lakes Kosciuso Yellow Creek Lakes Watershed Diagnostic Study |
June-09 |