Fish & Wildlife Home > Lake & River Enhancement > LARE Project Reports LARE Project Reports

The Lake and River Enhancement Program provides the LARE Reports in a pdf format listed by "Water body-County". For instance, Lake Pleasant will be listed under "Pleasant Lake-Steuben County". If there is more than one water body with the same name, additional folders of the same-named water body in other counties will be included in the master list.

These reports are provided solely as an information resource to interested parties. They are reproduced as they were developed by the sponsoring entities and agencies, individuals or firms responsible for them. No endorsement of any products, procedures, or recommendations is made by the State of Indiana, Department of Natural Resources, Division of Fish and Wildlife or the Lake and River Enhancement Program.

If there is a report for a water body you do not see, please contact the LARE staff via e-mail at lare@dnr.IN.gov and note the information you are seeking.

Please note: All reports are in pdf format and require Adobe Acrobat in order to view them. Some reports may be larger and may take time to download onto your computer. If you do not have Adobe Acrobat, you can download this software from the Adobe website for free by clicking here.

LARE homepage

 

Lake(s), or River Watershed Name Indiana County (or Counties) Location Project Report Name Date of Report (Month and Year)
28 Lakes in Kosciusko County Kosciusko Preliminary Investigation of the Lakes of Kosciusko County Mar-89
Adams LaGrange Adams Lake Aquatic Vegetation Management Plan 2007-2011 Feb-08
Anderson Parks Lakes Madison Anderson Parks Lakes - Preliminary Diagnostic Study Nov-99
Anderson River Watershed Perry, Crawford, Dubois and Spencer Anderson River Watershed Diagnostic Study Aug-07
Atwood LaGrange Atwood Lake Aquatic Vegetation and Management Plan 2008-2012 Dec-08
Atwood LaGrange DRAFT Atwood Lake Aquatic Vegetation Management Plan 2009 Update Dec-09
Ball Steuben Diagnostic Study of Ball Lake Jan-03
Barbee Lakes Kosciusko Little Barbee Lake Feasibility Design Study July-91
Barbee Lakes Kosciusko Project Manual for Little Barbee Lake Putney Ditch Dredging and Sediment Basin Construction Aug-91
Barbee Lakes Kosciusko Project Manual for Little Barbee Lake Putney Ditch Streambank Stabilization Aug-91
Barbee Lakes Kosciusko Contract Documents for the Putney Ditch Streambank Stabilization Design Project Oct-98
Barbee Lakes Kosciusko Design Report for the Streambank Stabilization of Putney Ditch Feb-99
Barbee Lakes Kosciusko The Barbee Lakes Diagnostic Study Dec-00
Barbee Lakes Kosciusko Putney Ditch Watershed Feasibility Study Dec-02
Barbee Lakes Kosciusko Barbee Lakes Sedimentation Plan April-06
Barbee Lakes Kosciusko Barbee Lakes Aquatic Plant Management Plan Revision 2008-2012 Feb-08
Barbee Lakes Kosciusko DRAFT Barbee Lakes Aquatic Vegetation Management Plan 2009 Update Dec-09
Barr Creek Watershed Vanderburgh Rapid Bioassessment of the Barr Creek and Big Creek Watersheds Using Benthic Macroinvertebrates Dec-94
Barr Creek Watershed Vanderburgh Barr Creek Post-Construction Monitoring Study Nov-05
Bass Starke Bass Lake Diagnostic Study July-02
Bass Starke Bass Lake Aquatic Vegetation Management Plan Feb-05
Bass Starke Hydrogeologic Evaluation of the Bass Lake Recharge Well June-05
Bass Starke Bass Lake Aquatic Vegetation Management Plan-2005 Update Feb-06
Bass Starke Bass Lake Aquatic Vegetation Management Plan - 2006 Update Feb-07
Bass Starke Bass Lake, Starke County, Aquatic Plant Management Plan Update March-08
Bass Starke Bass Lake Aquatic Vegetation Management Plan 2008 Feb-09
Bass Starke DRAFT Bass Lake Aquatic Vegetation Management Plan 2009 Update Dec-09
Beaver Dam and Loon Kosciusko Beaver Dam and Loon Lakes AVMP - Revision 2007, Excerpt from Yellow Creek Lakes Diagnostic Study March-08
Beaver Creek Reservoir Dubois Lake Enhancement Program Feasibility Study for Beaver Creek Reservoir Oct-90
Big Noble Preliminary Assessment of Big Lake, Noble County (1992-1995) July-95
Big Noble Big Lake Aquatic Vegetation Management Plan, Noble County, Indiana, 2006-2010 Feb-07
Big Noble Big Lake Aquatic Vegetation Management Plan Update 2007-2011 Feb-08
Big Noble Big Lake Aquatic Vegetaton Management Plan 2009 Feb-09
Big Noble DRAFT Big Lake Aquatic Vegetation Management Plan 2009 Update Dec-09
Big Long LaGange DRAFT Big Long Lake Aquatic Vegetation Management Plan 2009 Update Dec-09
Big Long Lake, Lake of the Woods, McClish Lake, Pretty Lake LaGrange Big Long Lake, Lake of the Woods, McClish Lake, Pretty Lake-A Study for their Improvement, Restoration and Protection June-91
Big Turkey Steuben Big Turkey and Little Turkey Lake Enhancement Feasibility Study Sept-90
Big Turkey Steuben Big Turkey Lake Watershed Feasibility Study Sept-02
Big Turkey Steuben Big Turkey Lake Sediment Trap Design Report May-04
Big Turkey Steuben Big Turkey Lake Sediment Removal Plan Sep-06
Big Turkey LaGrange and Steuben 2007 Aquatic Plant Management Plan for Big Turkey Lake in LaGrange and Steuben Counties, Indiana Feb-08
Big Turkey LaGrange and Steuben Aquatic Vegetation Management Plan Update 2008 Dec-08
Big Turkey LaGrange and Steuben DRAFT Big Turkey Lake Aquatic Vegetation Management Plan 2009 Update Dec-09
Big Walnut Creek Putnam Big Walnut Creek Watershed Management Plan  (large file, 54MG) Jan-09
Bischoff Ripley Bischoff Reservoir Feasibility Study July-91
Bixler Noble Feasibility Study on the Restoration of Bixler Lake May-90
Blue Whitley Blue Lake Diagnostic Study April-06
Blue Whitley Blue Lake Engineering Feasibility Study May-08
Blue River Watershed Noble, Whitley Rapid Bioassessment of the Blue River and Upper Eel River Watersheds Using Benthic Macroinvertebrates Oct-94
Brooks Creek Watershed Jay Brooks Creek Watershed Diagnostic Study March-02
Bruce Fulton A Study for the Improvement, Restoration, and Protection of Lake Bruce, Fulton and Pulaski Counties, Indiana May-90
Bruce Fulton Project Manual-Contract Documents & Specifications for the Lake Bruce Association Inc. Lake Enhancement Project Aug-95
Bruce Fulton Monitoring Study for the Lake Bruce Watershed Land Treatment Project Area May-02
Bruce Fulton Lake Bruce, Fulton and Pulaski County Aquatic Plant Management Plan 2007-2011 Feb-08
Brush Creek Reservoir Jennings Brush Creek Reservoir Watershed Diagnostic Study Aug-02
Brush Creek Reservoir Jennings Brush Creek Watershed Management Plan Oct-02
Brush Creek Watershed Owen Rapid Bioassessment of the Brush Creek Watershed Using Benthic Macroinvertebrates Oct-00
Cedar Lake Cedar Lake Restoration Feasiblity Study-Final Report by Env. Systems App. Cneter, IUPUI SPEA Jan-84
Cedar Lake Cedar Lake T by 2000 Feasibility Study June-91
Cedar Lake Cedar Lake Dredge Feasibility Study (not funded by LARE) Oct-98
Cedar Lake Cedar Lake Engineering Feasibility Study by Harza March-99
Cedar Lake Cedar Lake Diagnostic Feasibility Study April-01
Cedar Lake Contract Documents for Wetland Improvements to Improve the Water Quality of Cedar Lake June-02
Cedar Lake Supporting Design Report for Wetland Improvements to Improve the Water Quality of Cedar Lake June-02
Cedar Lake Cedar Lake Engineering Feasibility Study May-04
Center Kosciusko Center Lake Diagnostic Study Report Jan-05
Center Kosciusko Center Lake Engineering Feasibility Study Oct-06
Center Kosciusko Center Lake Aquatic Plant Management Plan Update 2006 Feb-07
Center Kosciusko Center Lake, Kosciusko County, Aquatic Plant Management Plan Update 2007 Feb-08
Center Kosciusko Center Lake Aquatic Vegetation Management Plan 2008 Feb-09
Chain O' Lakes Noble Chain O Lakes Watershed Diagnostic Study Oct-02
Chapman Lakes Kosciusko Chapman Lake Diagnostic Study June-01
Chapman Lakes Kosciusko Crooked Creek Design/Build Report Dec-03
Chapman Lakes Kosciusko Chapman Lakes Engineering Feasibility Study Feb-03
Chapman Lakes Kosciusko Arrowhead Drain Design Build Report Oct-04
Chapman Lakes Kosciusko Lozier and Highland Park Drains Engineering Feasibility Study May-06
Chapman Lakes Kosciusko Chapman Lakes Strategic Lakes Management Plan, Koskiusko County, Indiana Jan-07
Chapman Lakes Kosciusko Chapman Lake Aquatic Vegetation Management Plan 2006 Update Feb-07
Chapman Lakes Kosciusko Chapman Lakes Watershed Highland Drain Design - Build Project May-08
Chapman Lakes Kosciusko Chapman Lakes Sediment Removal Plan May-09
Clear LaPorte Clear Lake Enhancement Feasibility Study Aug-90
Clear Steuben Clear Lake Steuben County Watershed Analysis June-93
Clear LaPorte Clear Lake Alum Stormwater Treatment Evaluation June-95
Clear LaPorte Clear Lake Enhancement Project Contract Documents for the Improvement of the Clear Lake Sediment Trap Sept-95
Clear LaPorte Supporting Design Report for Improvement of the Clear Lake Sediment Trap Dec-95
Clear LaPorte Clear Lake Stormwater Treatment System Preliminary Design Report Aug-97
Clear LaPorte Technical Specifications for Clear Lake Stormwater Treatment System July-98
Cox Ditch Watershed Vigo Cox Ditch and Otter Creek Macroinvertebrate Biomonitoring Results (1991-1994) June-95
Cree Noble Feasibility Study for Cree and Shockopee Lakes Oct-90
Cree Noble Cree Lake Aquatic Vegetation Management Plan March-05
Crooked Lake Steuben Crooked Lake-Carpenter and Palfreyman Ditches Feasibility Study Sept-91
Crooked Lake Steuben Crooked Lake Monitoring Study-Steuben County-May 26, 2003 May-03
Crooked Lake Steuben Crooked Lake Engineering Feasibility Study April-05
Crooked Lake Steuben Carpenter Drain Design/Build Report (Crooked Lake) June-05
Crooked Lake Steuben Crooked Lake Aquatic Vegetation Management Plan 2007-2011 Feb-07
Crooked Lake Steuben Steuben 4-H Park Stormwater, Sediment and Nutrient Reduction Project Design Report Jan-07
Crooked Lake Steuben Crooked Lake Aquatic Vegetation Management Plan 2007 Update Feb-08
Crooked Lake Steuben Crooked Lake Aquatic Vegetation Management Plan 2008 Update Feb-09
Crooked Lake Steuben DRAFT Crooked Lake Aquatic Vegetation Management Plan 2009 Update Dec-09
Crooked Lake Whitley Design Report-Inspection Plan, Operation & Maintenance Plan, & Post Construction Monitoring Plan Oct-95
Crooked Lake Whitley Project Manual-Contract Documents & Specifications for the Crooked Lake Association Lake Enhancement Project Oct-95
Crooked Lake Whitley Assessment of Watershed-Lake Interactions-Crooked Lake April-93
Crooked Lake Whitley Spear Road Ravine Design/Build Report Sept-04
Crooked, Chapman, Tippecanoe, Wawasee Lakes Steuben, Kosciusko
Littoral Zone Restoration Research Project 2007-2009 Year 1 Report Dec-07
Crooked, Chapman, Tippecanoe, Wawasee Lakes Steuben, Kosciusko
Littoral Zone Restoration Research Project 2007-2009 Year 2 Report Feb-09
Crooked, Chapman, Tippecanoe, Wawasee Lakes Steuben, Kosciusko
Littoral Zone Restoration Research Project 2007-2009 Year 3 Final Report Dec-09
Curtis Creek Newton, Jasper Curtis Creek Watershed Diagnostic Study Apr-03
Dewart Kosciusko Dewart Lake Diagnostic Study May-05
Dewart Kosciusko Dewart Lake Engineering Feasibility Study May-07
Dewart Kosciusko Dewart Lake Vegetation Management Plan Update, Kosciusko County, Indiana 2006 Feb-07
Dewart Kosciusko Dewart Lake Vegetation Management Plan Update 2007-2011 Feb-08
Dewart Kosciusko Dewart Lake Aquatic Vegetation Management Plan 2008 Mar-09
Dewart Kosciusko DRAFT Dewart Lake Aquatic Vegetation Management Plan 2009 Update De-09
Diamond and Hill Kosciusko Diamond and Hill Lakes AVMP - Revision 2007, Excerpt from Yellow Creek Lakes Diagnostic Study Mar-08
Diamond and Hill Kosciusko Diamond and Hill Lakes Aquatic Vegetation Management Plan 2008-2012 Mar-09
Duck Creek Franklin, Fayette DRAFT - Duck Creek Watershed Diagnostic May-08
Eagle Creek Reservoir Marion Eagle Creek Park and Reservoir Shoreline Erosion Location & Assessment Survey Sept-94
Fish LaGrange A Preliminary Assessment of Fish Lake Aug-90
Fish LaPorte Final Feasibility Study May-90
Fish LaGrange Fish and Royer Lakes Feasibility Study Feb-91
Fish LaPorte Fish Lake Feasibility Study (Followup) March-92
Fish LaPorte Fish Lake Aquatic Vegetation Management Plan Update 2006 Feb-07
Fish LaPorte Aquatic Plant Management Plan Update, 2007  Dec-07
Five Lakes (AKA "Indian Lakes") (Witmer, Westler, Dallas, Hackenberg, Messick) LaGrange Indian Lakes Improvement Project Jan-01
Five Lakes (AKA "Indian Lakes") (Witmer, Westler, Dallas, Hackenberg, Messick) LaGrange PetitMill Pond Sediment Control Project Design Report July-04
Five Lakes (AKA "Indian Lakes") (Witmer, Westler, Dallas, Hackenberg, Messick) LaGrange Five Lakes Engineering Feasibility Study July-04
Five Lakes (AKA "Indian Lakes") (Witmer, Westler, Dallas, Hackenberg, Messick) LaGrange Five Lakes Aquatic Vegetation Management Plan Update 2006, LaGrange County, Indiana Feb-07
Five Lakes LaGrange Five Lakes Watershed Management Plan Report July-06
Five Lakes LaGrange Five Lakes Aquatic Vegetation Management Plan Update 2007 Feb-08
Flat Creek Watershed Wells Flat Creek, Griffen Ditch, Fleming Ditch, and Somers Creek Watershed Diagnostic Study April-02
Flint Porter Feasibility Study on Water Quality and Sedimentation-Flint Lake-Porter County, Indiana Dec-91
Flint Porter Construction Specifications and Bid Documents-Flint Lake Enhancement Project June-95
Flint Porter Project Manual Contract Documents and Specifications for Flint Lake Jan-99
Flint Porter Design Report, Inspection Plan, Operation and Maintenance Plan, and Post Construction Monitoring Plan Feb-99
Flint Porter Flint Lake Aquatic Vegetation Management Plan 2007-2011 Feb-07
Flint Porter Flint Lake Aquatic Vegetation Management Plan 2007 Update Feb-08
Four Lakes Marshall Four Lakes Watershed Diagnostic Study July-06
Four Lakes (Cook, Holem, Kreighbaum, Millpond) Marshall Four Lakes Aquatic Vegetation Management Plan Update 2006 Feb-07
Four Lakes  Marshall Four Lakes Watershed Diagnostic Study July-05
Gage & Lime Steuben Lake Gage and Lime Lake Engineering Feasibility Study Dec-05
Gage & Lime Steuben Concorde Creek Channel Restoration Project Design Report May-08
Gage & Lime Steuben Concorde Creek Channel Restoration Project Final As Built Report Dec-09
Galbraith (Gilbert) Marshall Preliminary Study of Galbraith Lake (Gilbert) Jan-97
Galena River Watershed LaPorte DRAFT Galena River Watershed Management Plan Dec-09
Geist Marion & Hamilton DRAFT Geist Reservoir Aquatic Vegetation Management Plan 2009-2013 Marion Hamilton Counties 2009 Update Dec-09
George Lake Fred Rose & Jerry Pavese Park Shoreline Stabilization Design Report Dec-04
George Lake School City of Hobart Shoreline Stabilization Design Report Aug-05
George Lake Fred Rose Park Shoreline Stabilization Project City of Hobart Lake County, Indiana Jan-07
George Steuben Lake George Aquatic Vegetation Management Plan, Steuben County, Indiana, Branch County, Michigan, 2006-2010 Feb-07
George Steuben Lake George Aquatic Vegetation Management Plan Update 2007-2011 Feb-08
Greenwood Martin Lake Greenwood Diagnostic Study July-01
Griffy Monroe Griffy Lake Aquatic Vegetation Management Plan Feb-05
Griffy Monroe Griffy Lake Aquatic Vegetation Management Plan 2006 Update Feb-07
Griffy Monroe Griffy Lake Aquatic Vegetation Management Plan 2007 Update Feb-08
Griffy Monroe Griffy Lake Aquatic Vegetation Management Plan 2008 Update Feb-09
Griffy Monroe DRAFT Griffy Lake Aquatic Vegetation Management Plan 2009 Update Dec-09
Hamilton Steuben Hamilton Lake Feasibility Study Jan-90
Hamilton Steuben Report for Environmental Review of Artificial Wetlands Designed to Enhance Water Quality of Hamilton Lake, Indiana Nov-91
Hamilton Steuben Report of Subsurface Exploration and Laboratory Testing Hamilton Lake Enhancement Project Wetland Design Sites Nov-91
Hamilton Steuben Contract Documents for Wetland Enhancements to Improve the Water Quality of Hamilton Lake Aug-99
Hamilton Steuben Supporting Design Report for Wetland Development to Improve the Water Quality of Hamilton Lake Sept-99
Hamilton Steuben Black Creek Engineering Feasibility Study Oct-06
Hamiliton Steuben 2007 Aquatic Plant Management Plan for Hamilton Lake in Steuben County, Indiana Feb-08
Hamilton Steuben Aquatic Vegetation Management Plan Update 2008 Dec-08
Hamilton Steuben Black Creek Restoration Plan Engineering Design Study Jan-09
Hamilton Steuben Hamilton Lake Sediment Removal Plan Jan-09
Hardy Jefferson and Scott Hardy Lake Watershed Diagnostic Study June-00
Heaton Elkhart 319 funded Heaton Lake Watershed Management Plan Jan-06
Heaton Elkhart 319 funded Heaton Lake WMP - Appendix A Jan-06
Heaton Elkhart 319 funded Heaton Lake WMP- Appendix B Jan-06
Heaton Elkhart 319 funded Heaton Lake WMP - Appendix C Jan-06
Heaton Elkhart 319 funded Heaton Lake WMP- Appendix D Jan-06
Heaton Elkhart 319 funded Heaton Lake WMP- Appendix E Jan-06
Heaton Elkhart Heaton Lake Aquatic Plant Management Plan 2007-2011 Feb-08
Heaton Elkhart Heaton Lake Aquatic Vegetation Management Plan 2008 Feb-09
Heaton Elkhart DRAFT Heaton Lake Aquatic Vegetation Management Plan 2009 Update Dec-09
Hill Kosciusko DRAFT Hill Lake Aquatic Vegetation Management Plan 2009 Update Dec-09
Hudson LaPorte Hudson Lake Enhancement Feasibility Study Feb-91
Hudson LaPorte Aquatic Vegetation Management Plan March-08
Hudson LaPorte Hudson Lake Diagnostic Study June-08
Hudson LaPorte DRAFT: Aquatic Vegetation Management Plan for Hudson Lake, LaPorte County, Update 2008 Dec-08
Hudson LaPorte DRAFT Lake Aquatic Vegetation Management Plan 2009 Update Dec-09
Huntingburg Dubois Feasibility Study For Huntingburg Lake Dec-90
Indian Creek Watershed Greene, Lawrence, Martin, Monroe Diagnostic Study for Indian Creek Watershed Jan-01
Indian Creek Watershed Pulaski, Fulton, Cass, White Indian Creek Watershed Diagnostic Study Sept-03
Indian Creek Watershed Johnson The Indian Creek Watershed: To Preserve and Protect Water Quality (EPA 319 Project through IDEM) Mar-09
James, Snow Lake, Big Otter Lake and Little Otter Lake Steuben Lake Diagnostic Study - Lake James, Snow Lake, Big Otter and Little Otter Lakes Oct-06
James Steuben Lake James Croxton Ditch Watershed Feasibility Study Sept-91
Jimmerson Steuben Jimmerson Lake Diagnostic Study Jan-03
Jimmerson Steuben Engineering Feasibility Study for Jimmerson Lake Jan-05
Jimmerson Steuben Jimmerson Lake Aquatic Vegetation Management Plan Update, Steuben County, Indiana, 2006 Dec-06
Jimmerson Steuben Aquatic Plant Management Plan Update, 2007 Feb-08
Juday Creek Watershed St Joseph Juday Creek Watershed Feasibility Study March-02
Kokomo Creek Watershed Howard Rapid Bioassessment of the Kokomo Creek Watershed using Benthic Macroinvetebrates May-00
Kokomo Creek Watershed Howard Kokomo Creek Watershed Final Water Quaity Monitoring Aug-05
Koontz Marshall DRAFT Diagnostic Study of Koontz Lake Indiana conducted by SEC, Inc. for US Army COE Oct-99
Koontz Starke, Marshall The Cultural Eutrophication of Koontz Lake Indiana Dec-88
Koontz Starke, Marshall Koontz Lake Sediments Analysis May-90
Koontz Starke, Marshall Koontz Lake Aquatic Vegetation Management Plan 2008-2012
Marshall and Starke Counties, Indiana
Feb-09
Koontz Starke, Marshall DRAFT Koontz Lake Watershed Managment Plan Dec-09
Lake of the Woods Marshall Diagnostic Feasibility Study of the Lake of the Woods Marshall Co., Indiana Feb-82
Lake of the Woods Marshall Lake of the Woods Feasibility Study Dec-91
Lake of the Woods Marshall Lake of the Woods Aquatic Vegetation Management Plan March-05
Lake of the Woods Marshall Lake of the Woods Watershed Management Plan June-05
Lake of the Woods Marshall Lake of the Woods Vegetation Management Plan Update, Marshall County, Indiana, 2006 Feb-07
Lake of the Woods Marshall Lake of the Woods Vegetation Management Plan Update 2007-2011 Dec-07
Lake of the Woods Marshall Lake of the Woods AVMP 2008 Update Feb-09
LaPorte Lakes (Pine, Stone, Harris, Lily, Clear, Lower Lakes) LaPorte LaPorte Lakes Diagnostic Study for City of LaPorte May-07
LaPorte Lakes (Pine, Stone, Harris, Lily, Clear, Lower) LaPorte City of LaPorte Lakes Aquatic Vegetation Plan 2008-2012 Feb-08
LaPorte Lakes (Pine, Stone, Harris, Lily, Clear, Lower) LaPorte City of LaPorte Lakes Aquatic Vegetation Management Plan 2008 Update Feb-09
LaPorte Lakes (Pine, Stone, Harris, Lily, Clear, Lower) LaPorte DRAFT City of LaPorte Lakes Aquatic Vegetation Management Plan 2009 Update Dec-09
Lemon Monroe Sedimentation in Lake Lemon, Monroe County, Indiana June-74
Lemon Monroe Lake Lemon Aquatic Vegetation Management Plan 2007 Update Feb-08
Lemon Monroe Lake Lemon Aquatic Vegetation Management Plan Update 2006 Feb-07
Lemon Monroe Lake Lemon Diagnostic/Feasibility Study April-86
Lemon Monroe Lake Lemon T by 2000 Feasibility Study July-92
Lemon Monroe Feasibility Study for a Biotechnical Shoreline Stabilization Project Feb-97
Lemon Monroe Biotechnical Shoreline Stabilization Project June-97
Lemon Monroe Contract Documents & Specifications-Lake Lemon-Areas 1A, 1C, and 3B Shoreline Stabilization Jan-98
Lemon Monroe Lake Lemon Shoreline Stabilization-Project Manual-Areas 2a, 2b, and 2c June-00
Lemon Monroe Lake Lemon Shoreline Stabilization-Project Manual-Area 3c June-01
Lemon Monroe Lake Lemon Shoreline Stabilization-Project Manual-Area 1b June-01
Lemon Monroe Lake Lemon Watershed Management Plan Jan-02
Lemon Monroe Lake Lemon Aquatic Vegetation Management Plan 2000-2003 Feb-03
Lemon Monroe Lake Lemon Aquatic Vegetation Management Plan Feb-05
Lemon Monroe Lake Lemon Aquatic Vegetation Management Plan-2006 Update Feb-06
Little River Whitley, Allen and Huntington Little River Watershed Diagnostic Study Jan-09
Little Turkey LaGrange Little Turkey Lake Aquatic Vegetation Management Plan 2007-2011 Mar-08
Little Turkey LaGrange Little Turkey Lake Aquatic Vegetation Management Plan 2008 Update Feb-09
Little Turkey LaGrange DRAFT Little Turkey Lake Aquatic Vegetation Management Plan 2009 Update Dec-09
Little Blue River Watershed Shelby, Rush Little Blue River Watershed Diagnostic Study April-04
Little Pipe Creek Watershed Miami Rapid Bioassessment of the Little Pipe Creek Watershed Using Benthic Macroinvertebrates Oct-95
Loefler and Scott Ditches Watershed Gibson Loefler and Scott Ditches Watershed Diagnostic Study Dec-09
Long Porter Long Lake Aquatic Vegetation Management Plan 2008-2012 Feb-08
Long Porter Long Lake Aquatic Vegetation Management Plan 2008 Update Feb-09
Long Porter DRAFT Long Lake Aquatic Vegetation Management Plan 2009 Update Dec-09
Loon Whitley Feasibility Studies of Loon Lake and Goose Lake March-92
Loon Whitley Design Report Inspection Plan O & M Plan Monitoring Plan Dec-97
Loon Whitley Loon Lake Project Manual Contract Documents and Specifications Dec-97
Lost River Watershed Orange Lost River Watershed Final Water Quality Monitoring Study Sept-06
Manitou Fulton History of Cultural Eutrophication at Lake Manitou and Prospects for its Management Jan-87
Manitou Fulton Project Manual Lake Manitou Graham Ditch Site July-90
Manitou Fulton Project Manual Lake Manitou Robbins-Taylor Site July-90
Manitou Fulton Project Manual Lake Manitou Marsteller Site July-90
Manitou Fulton Lake Manitou Vegetation Management Plan Update, Fulton County, Indiana, 2005 Mar-06
Manitou Fulton Lake Manitou Vegetation Management Plan Update, Fulton County, Indiana, 2006 Feb-07
Manitou Fulton Lake Manitou, Graham Ditch Wetland Project Manual March-96
Manitou Fulton Inspection, Operation and Maintenance, and Post Construction and Monitoring Plans and Design Report June-96
Manitou Fulton Inspection, Operation and Maintenance, and Post Construction and Monitoring Plans and Design Report-w Revised Design Structure Dec-97
Manitou Fulton Lake Manitou Aquatic Vegetation Management Plan March-05
Manitou Fulton Lake Manitou Sediment Removal Plan July-07
Manitou Fulton Lake Manitou AVMP Update March-08
Manitou Fulton Lake Manitou Aquatic Vegetation Management Plan 2008 Update Feb-09
Manitou Fulton DRAFT Lake Manitou Aquatic Vegetation Management Plan 2009 Update DEC-09
Maxinkuckee Marshall Project Manual-Kline Ditch July-90
Maxinkuckee Marshall Project Manual-Curtiss Ditch Wetland July-90
Maxinkuckee Marshall Lake Maxinkuckee Lake and Watershed Management Plan July-06
Maxinkuckee Marshall Lake Maxinkuckee Aquatic Plant Management Plan Update 2006 Feb-07
Maxinkuckee Marshall Lake Maxinkuckee Shoreline Revegetation Project 2007 Sept-09
Meserve Steuben Aquatic Vegetation Management Plan Update 2008-2012 Dec-08
Meserve Steuben DRAFT Meserve Lake Aquatic Vegetation Management Plan 2009 Update Dec-09
Mill Pond LaPorte Union Mills: A study for the improvement, Restoration, and Protection of Mill Pond Feb-90
Mill Pond LaPorte Project Manual-Sediment Trap-Mill Pond Feb-93
Mississinewa River Watershed Randolph, Delaware, Jay Watershed Diagnostic Study for Mississinewa River Feb-01
Mississinewa River Watershed Randolph, Delaware, Jay Watershed Diagnostic Study for Mississinewa River (Phase 2) June-04
Mississinewa River Watershed Randolph, Delaware, Jay Watershed Diagnostic Study for Mississinewa River (Phase 3) Oct-06
Monroe Monroe Lake Monroe Pilot Watershed Study Sept-96
Mud Pine Creek Watershed Benton Upper Mud Pine Creek Watershed Diagnostic Study Oct-02
Myers Marshall Myers Lake Watershed Feasibility Study Feb-03
Myers & Lawrence Marshall Myers-Lawrence Lakes Diagnostic Study May-00
Nyona & South Mud Fulton Nyona Lake-South Mud Lake-A study for the Improvement, Restoration, and Protection June-90
Oliver, Olin, Martin  LaGrange Oliver, Olin, Martin Lakes Diagnostic Study Oct-09
Palestine Kosciusko Palestine Lake Watershed Diagnostic Study April-08
Pigeon Creek Watershed Vanderburgh Pigeon Creek Watershed Diagnostic Study, Vol 2, McFadden Creek Watershed Bioassessment Study Oct-00
Pigeon Creek Watershed Vanderburgh Pigeon Creek Watershed Diagnostic Study, Vol 1 Sept-01
Pigeon Creek Watershed Vanderburgh Pigeon Creek Watershed Diagnostic Study - Volume 3- Appendices Jan-01
Pike Kosciusko Pike Lake Feasibility Study Dec-90
Pine LaPorte Pine Lake Aquatic Vegetation Management Plan Feb-05
Pine LaPorte Pine Lake Aquatic Vegetation Management Plan-2006 Update Feb-06
Pine LaPorte Pine Lake AVMP Update 2006 Feb-07
Pipe Creek Watershed Howard Rapid Bioassessment of Pipe Creek Watershed May-03
Pipe Creek Watershed Howard, Miami, Grant Watershed Diagnostic Study for Pipe-Creek-Potter Ditch and subwatersheds Oct-03
Pleasant Steuben Lake Pleasant Aquatic Vegetation Management Plan Update, Steuben County, Indiana 2006 Dec-06
Pleasant & Riddles St Joseph Pleasant and Riddles Lakes Sediment Removal Plan Jan-06
Pleasant & Riddles St Joseph Pleasant and Riddles Lakes Watershed Diagnostic Study May-06
Pleasant & Riddles St Joseph Final Report Dredging Project Lake Riddles, St. Joseph County, Indiana Dec-06
Pleasant & Riddles St Joseph Pleasant and Riddles Lakes Aquatic Vegetation Management Plan 2007-2011 Feb-07
Pleasant & Riddles St. Joseph Pleasant and Riddles Lakes Aquatic Vegetation Management Plan 2007 Update Feb-08
Pleasant & Riddles St Joseph DRAFT Pleasant and Riddles Lakes Aquatic Vegetation Management Plan 2009 Update Dec-09
Pretty LaGrange Pretty Lake Diagnostic Study in LaGrange County, Indiana April-07
Pretty LaGrange Pretty Lake Aquatic Vegetation Management Plan 2007 Update Feb-08
Pretty LaGrange Engineering Feasibility Study for Pretty Lake August 2009 Aug-09
Pretty Marshall Pretty Lake Aquatic Vegetation Management Plan 2008 Update Feb-09
Pretty Marshall Pretty Lake Aquatic Vegetation Management Plan 2007-2011 Feb-07
Pretty Marshall Pretty Lake Diagnostic Study June-09
Pretty Marshall DRAFT Pretty Lake Aquatic Vegetation Management Plan 2009 Update Dec-09
Prides Creek Lake Pike Feasibility Study Prides Creek Lake Feb-89
Prides Creek Lake Pike Contract Documents Feb-89
Prides Creek Lake Pike Design Report Aug-90
Rhodes Creek Morgan Rapid Bioassessment of the Rhodes Creek Watershed Oct-96
Ridinger Kosciusko Feasibility Study for the Restoration of Ridinger Lake Oct-90
Ridinger Kosciusko Ridinger Lake Watershed Diagnostic Study Nov-04
Ridinger Kosciusko Ridinger Lake Aquatic Vegetation Management Plan 2008-2012 Feb-08
Ridinger Kosciusko Ridinger Lake Aquatic Vegetation Management Plan 2008 Update Feb-09
Rock Fulton, Kosciusko Rock Lake Aquatic Vegetation Management Plan Feb-05
Rock Fulton, Kosciusko Rock Lake Aquatic Vegetation Management Plan Update 2005 Feb-06
Rock Fulton, Kosciusko Rock Lake Aquatic Vegetation Management Plan Update 2006 Feb-07
Rock Fulton, Kosciusko Rock Lake Diagnostic Study Aug-09
Salinda Washington Feasibility Study For Lake Salinda Mar-90
Salt Creek Watershed Decatur, Franklin DRAFT: Salt Creek Watershed Diagnostic Study Dec-08
Sand Creek Watershed Decatur Sand Creek Watershed Management Plan 1999-2009 June-01
Sand Creek Watershed Decatur Sand Creek Watershed Bioassessment Report May-04
Shafer White Lake Shafer Preliminary Investigation Dec-88
Shafer White Soil Tests Lake Shafer Apr-93
Shafer White Lake Shafer Feasibility Study Mar-95
Shafer White Lake Shafer Lake Enhancement Project Design Documents June-96
Shafer White Contract Documents and Specifications for the Lake Shafer-Lake Enhancement Project-Area 1: Honey Creek-Lake Dredging and Sediment Placement Site Contracts Jan-97
Shafer White Proposal for Placement Alternatives-Lakes Shafer and Freeman Lake Dredging Project Mar-99
Shafer White Contract Documents and Specifications for the Lake Shafer-Lake Enhancement Project-Wooldridge Sediment Placement Site Contract Oct-99
Shafer White Final Report Lake Shafer Dredging Project Sediment Sampling & Analysis, Vol. 2 July-00
Shafer White Final Report Lake Shafer Dredging Project Sediment Sampling & Analysis, Vol. 1 July-00
Shakamak Greene Lake Shakamak Feasibility Study and Management Plan Aug-89
Shipshewana LaGrange Shipshewana Lake Restoration Feasibility Study Mar-89
Shipshewana LaGrange Field Methods Manual-Revised Volunteer Monitoring Program-Shipshewana Lake May-91
Shipshewana LaGrange Shipshewana Lake Pre-design Report Jan-96
Shipshewana LaGrange Shipshewana Lake Shoreline Stabilization Project May-97
Shipshewana LaGrange Shipshewana Lake Restoration Project Constructed Wetlands Phase March-98
Shipshewana LaGrange Contract Documents and Specifications for the Construction of Shipshewana Lake Restoration Project: Two Constructed Wetlands March-98
Shipshewana LaGrange Contract Documents and Specifications for the Hydraulic Dredging of Shipshewana Lake March-98
Shipshewana LaGrange Shipshewana Lake Dredging Project April-98
Shipshewana LaGrange Lake Shipshewana Aquative Vegetation Management Plan 2006-2010 Feb-07
Shipshewana LaGrange Shipshewana Lake Aquatic Vegetation Management Plan Update 2007-2011 Feb-08
Shipshewana LaGrange Shipshewana Lake Aquatic Vegetation Management Plan 2008 Update Feb-09
Shipshewana LaGrange DRAFT Shipshewana Lake Aquatic Vegetation Management Plan 2009 Update Dec-09
Silver Kosciusko Silver Lake Diagnostic Study Feb-01
Silver Kosciusko Silver Lake Aquatic Vegetation Management Plan March-05
Silver Kosciusko Silver Lake Aquatic Vegetation Management Plan-updated 2006 March-06
Silver Kosciusko Silver Lake Vegetation Management Plan Update, Kosciusko County, Indiana 2006 Feb-07
Silver Kosciusko Silver Lake Vegetation Management Plan Update 2007-2011 Feb-08
Silver Kosciusko Silver Lake 2008 Aquatic Vegetation Management Plan Update Feb-09
Silver Kosciusko DRAFT Silver Lake Aquatic Vegetation Management Plan 2009 Update Dec-09
Silver Creek and Hanna's Creek Union Silver Creek and Hanna's Creek Watershed Diagnostic Study July-02
Skinner Noble Impact of Land Treatment on the Restoration of Skinner Lake, Noble County, Indiana Dec-82
Skinner Noble Effects of Watershed Management Practices on the Fish Community at Skinner Lake Jan-87
Skinner Noble Skinner Lake Water Quality Analysis 1990-91 Assessment of Wetland Reconstruction Nov-91
Skinner Noble Paleolimnological Assessment of the Effectivness of a Constructed Sedimentation Basin at Reducing Sediment and Nutrient Loading to Skinner Lake, Indiana May-92
Skinner Noble Skinner Lake AGNPS Comparison of Pre-Treatment and Post-Treatment Sediment and Nutrient Loading May-92
Skinner Noble Skinner Lake Aquatic Vegetation Management Plan Mar-05
Skinner Noble Skinner Lake Engineering Feasibility Study, Noble County April-07
Skinner Noble Skinner Lake (Rimmell Ditch) Design-Build Report April-09
Smalley Noble Smalley Lake Diagnostic Study-Noble and Whitley Counties June-04
Stone and Brokesha LaGrange 2007 Aquatic Plant Management Plan for Stone and Brokesha Lakes in LaGrange County, Indiana Feb-08
Stone and Brokesha LaGrange Aquatic Vegetation Management Plan Update 2008 Dec-08
Sullivan Sullivan Project Manual for Sullivan Lake Shoreline Stabilization Mar-91
Sullivan Sullivan Sullivan Lake Feasibility Study Mar-91
Sullivan Sullivan DRAFT Lake Sullivan Sediment Removal Plan and Nutrient and Sediment Load Reduction Plan Aug-09
Sylvan Noble Sylvan Lake-A final Feasibility Report May-90
Sylvan Noble Sylvan Lake Enhancement Project: Phase II Non-Point Source Pollution Model Results June-91
Sylvan Noble Contract Documents for Wetland Enhancements to Improve the Water Quality of Sylvan Lake Sept-97
Sylvan Noble Supporting Design Report for Wetland Enhancements to Improve the Water Quality of Sylvan Lake Sept-97
Sylvan Noble Sylvan Lake Sediment Control Structure-As Built Report June-99
Sylvan Noble Sylvan Lake Aquatic Vegetation Management Plan Mar-08
Sylvan Noble Sylvan Lake Aquatic Vegetation Management Plan Revision 2008 Mar-09
Sylvan Noble DRAFT Sylvan Lake Aquatic Vegetation Management Plan 2009 Update Dec-09
Syracuse Kosciusko Syracuse Stormwater Conveyance System-Design Summary July-04
Syracuse Kosciusko Syracuse Stormwater Conveyance System-Project Manual July-04
Syracuse Kosciusko Syracuse Stormwater Conveyance System-Drainage Report July-04
Syracuse Kosciusko Syracuse Lake Aquatic Vegetation Management Plan Mar-05
Syracuse Kosciusko Syracuse Lake Vegetation Management Plan Update, Kosciusko County, Indiana 2006 Feb-07
Syracuse Kosciusko DRAFT Syracuse Lake Aquatic Vegetation Management Plan 2009 Update Dec-09
Syracuse Kosciusko DRAFT Syracuse Lake Emergent Vegetation Survey 2009 Update Dec-09
Ten Lakes in LaGrange County LaGrange Feasibility Studies of Ten LaGrange County Lakes Oct-92
Tippecanoe Kosciusko Lake Tippecanoe Diagnostic Study June-97
Tippecanoe Kosciusko Lake Tippecanoe Feasibility Study Oct-98
Tippecanoe Kosciusko Design Summary-Hanna B. Walker Drain Sediment Trap Feb-00
Tippecanoe Kosciusko Lake Tippecanoe Henwood Creek Restoration Project Oct-00
Tippecanoe Kosciusko Indian Creek Detention Basins Oct-00
Tippecanoe Kosciusko Design Summary-Kuhn Ditch Tributary: Lake Tippecanoe Watershed Warner Historical Farms Restoration Feb-02
Tippecanoe Kosciusko Lake Tippecanoe Palmer Design Build Report May-03
Tippecanoe Kosciusko Langohr Sediment Trap Design Build Report-Lake Tippecanoe Watershed April-04
Tippecanoe Kosciusko Lake Tippecanoe Aquatic Vegetation Management Plan Feb-05
Tippecanoe Kosciusko Lake Tippecanoe Aquatic Vegetation Management Plan-2006 Update Feb-06
Tippecanoe Kosciusko Lake Tippecanoe Storm Drain Project March-06
Tippecanoe Kosciusko Ecozone Feasibility-Lake Tippecanoe, Koskiusko County, Indiana Jan-07
Tippecanoe Kosciusko Lake Tippecanoe Aquatic Vegetation Management Plan Update 2006 Feb-07
Tippecanoe Kosciusko Lake Tippecanoe Aquatic Vegetation Management Plan Update 2007 Feb-08
Tippecanoe Kosciusko Lake Tippecanoe Aquatic Vegetation Management Plan Feb-08
Tippecanoe Kosciusko DRAFT Lake Tippecanoe Aquatic Vegetation Management Plan 2009 Update Dec-09
Tippecanoe Noble and Whitley Counties Upper Tippecanoe River and Lake Association (UTRLA) Seven Lakes Diagnostic Study and Watershed Management Plan June-08
Tippecanoe Chain Kosciusko Tippecanoe Chain 2008 Ecozone Survey Report Feb-09
Tippecanoe River Watershed Kosciusko FINAL DRAFT Upper Tippecanoe River Watershed Management Plan July-06
Tri-Lakes Whitley Tri-Lakes Watershed Feasibility Study June-92
Tri-Lakes Whitley Tri-Lakes Design Report Whitley County Indiana Dec-05
Tri-Lakes Whitley Tri-Lakes Final Report Henny Property Project, Whitley County, Indiana (Construction) Nov-07
Turkey Creek Watershed Steuben Monitoring Study for the Turkey Creek Watershed Land Treatment Project Area April-02
Twelve Mile Creek Watershed Cass A Measurement of Water Quality in the Twelve Mile Creek Watershed Following Watershed Land Treatments Sept-06
Upper Laughery Creek Watershed Franklin, Decatur, Ripley Rapid Bioassessment of Upper Laughery Creek Watershed Oct-94
Upper Laughery Creek Watershed Franklin, Decatur, Ripley Rapid Bioassessment of Upper Laughery Creek Watershed May-99
Upper Long Noble Upper Long Lake Watershed Noble County, Indiana Diagnostic Study Apr-98
Village Noble Village Lake Tributary Stream Stabilization As-Built Engineering Design Report Sept-09
Wabash Adams Monitoring Water Quality of the Wabash River in Adams County using a Rapid Bioassessment Technique Nov-97
Wabash Mulitple The Wabash River Ecosystem II-by Dr. James Gammon Mar-95
Wall LaGrange Wall Lake Aquatic Vegetation Management Plan, Update, LaGrange County, Indiana, 2006 Dec-06
Wall LaGrange Lake Diagnostic Study Mar-06
Wall LaGrange Aquatic Plant Management Plan Update Feb-08
Wall LaGrange Aquatic Vegetation Management Plan Update 2008 Dec-08
Wall LaGrange DRAFT Wall Lake Aquatic Vegetation Management Plan 2009 Update Dec-09
Waubee Kosciusko Diagnostic Feasibility Study of Lake Waubee Kosciusko County, Indiana Jan - 82
Waubee Kosciusko Waubee Lake Report July-02
Waubee Kosciusko Waubee Lake Aquatic Vegetation Management Plan Mar-05
Waubee Kosciusko Waubee Lake Sediment Removal Plan Sept-05
Waubee Kosciusko Waubee Lake Vegetation Management Plan Update, Kosciusko County, Indiana 2006 Feb-07
Waveland Montgomery Feasibility Study of Lake Waveland and its Watershed Montgomery County and Parke County, Indiana Jan-91
Waveland Montgomery Rapid Bioassessment of the Lake Waveland Watershed using Benthic Macroinvertebrates Nov-00
Waveland Montgomery Waveland Lake Aquatic Vegetation Management Plan Feb-05
Waveland Montgomery Waveland Lake Aquatic Vegetation Management Plan Feb-08
Waveland Montgomery DRAFT Lake Waveland Aquatic Vegetation Management Plan 2009 Update Dec-09
Wawasee Kosciusko Enchanted Hills Watershed Evaluation-Wawasee Watershed Nov-95
Wawasee Kosciusko Lake Enhancement Diagnostic-Feasibility Study for the Wawasee Area Watershed Mar-96
Wawasee Kosciusko Lake Wawasee Engineering Feasibility Study May-01
Wawasee Kosciusko Griffith's Island Design Build Report Sept-04
Wawasee Kosciusko Martin Creek Outlet Design Build Report Nov-04
Wawasee Kosciusko Dillon Creek Sediment Control Project draft report Nov-05
Wawasee Kosciusko Lake Wawasee Aquatic Vegetation Plan 2005 Feb-06
Wawasee Kosciusko Wawasee Area Watershed Management Plan, Elkhart, Kosciusko and Noble counties Apr-07
Wawasee Kosciusko Lake Wawasee Aquatic Plant Management Plan Update 2006 (WARNING - this file is 52MB and may take a very long time to download. If you would like to have a CD of this file mailed to you, please send your mailing address to lare@dnr.IN.gov June-07
Wawasee Kosciusko Bayshore (Lake Wawasee) Design Report - Kosciusko, County Nov-07
Wawasee Noble Wawasee Turkey Creek Sediment Trap April-08
Wawasee Kosciusko Lake Wawasee, Kosciusko County Emergent Vegetation Survey in Ecozone areas of Johnson and Conklin Bay and Tier II Survey Results - 2008 Mar-09
Wawasee Kosciusko DRAFT Lake Wawasee Aquatic Vegetation Management Plan 2009 Update Dec-09
Webster Kosciusko Webster Lake/The Backwaters Diagnostic Study Nov-00
Webster Kosciusko North Webster Storm Drain Engineering Feasibility Study Oct-02
Webster Kosciusko Webster Lake Engineering Feasibility Study May-04
Webster Kosciusko Webster Lake Aquatic Vegetation Management Plan Feb-05
Webster Kosciusko Webster Lake Aquatic Vegetation Management Plan-2006 Update Feb-06
Webster Kosciusko Webster Lake Aquatic Vegetation Management Plan Update 2006 Feb-07
Webster Kosciusko Webster Lake - Culver Property Storm Water Filtration Report Mar-07
Webster Kosciusko Webster Lake Aquatic Vegetation Management Plan 2007 Update Feb-08
Webster Kosciusko Aquatic Vegetation Management Plan 2008 Update Feb-09
Webster Kosciusko DRAFT Lake Aquatic Vegetation Management Plan 2009 Update Dec-09
West Boggs Daviess West Boggs Lake Enhancement Design Project Vol 1, Contract Documents and Specifications Sept-94
West Boggs Daviess West Boggs Lake Enhancement Design Project Vol 2 - Inspection Plan Operations and Maintenance Plan Post Construction Monitoring Plan Design Project Report Permit Documents Sept-94
West Boggs Daviess LARE Shoreline Project Design Summary July-01
West Boggs Daviess Lake Enhancement Feasibility Study Aug-91
West Boggs Daviess LARE Shoreline Project Construction Summary July-01
West Boggs Daviess Post Construction Monitoring Study for West Boggs Reservoir June-02
West Lakes Noble West Lakes Sediment Removal Plan Sept-05
West Otter Steuben Draft Engineering Feasibility Study Sept-09
West Otter Steuben West Otter Lake Aquatic Vegetation Management Plan Update, Steuben County, Indiana, 2006 Dec-06
West Otter Steuben Aquatic Plant Management Plan Apr-05
Whetten Ditch, Solomon Creek, Dry Run-Elkhart River Watersheds Elkhart, Kosciusko, Noble Whetten Ditch, Solomon Creek, & Dry Run Watersheds Diagnostic Study Aug-02
White River Watershed Marion Kingfisher Project July-96
Wildcat Creek Clinton Wildcat Creek Bioassess Oct-94
Wildcat Creek Clinton Wildcat Creek Bioassess 2004
Winona Kosciusko Winona Lake, Kosciusko County, Aquatic Plant Management Plan Update 2007 Feb-08
Winona Kosciusko Winona Lake Feasibility-Design Study July-91
Winona Kosciusko Contract Documents for Peterson Ditch Streambank Stabilization Design Project Dec-96
Winona Kosciusko Design Report for the Streambank Stabilization of Peterson Ditch Lake Winona Dec-96
Winona Kosciusko Geomorphic Reconnaissance for Channel Stability Management Peterson Ditch Kosciusko County, Indiana Jan-99
Winona Kosciusko Design Summary Peterson Ditch Winona Lake Kosciusko County Indiana Mar-02
Winona Kosciusko Winona Lake Bank Stabilization Project Design Build Report Aug-09
Wolf Lake Diagnostic-Feasibility Study of Wolf Lake, Cook County, Illinois and Lake County, Indiana Oct-96
Wolf Creek Watershed Jay Rapid Bioassessment of the Wolf Creek Watershed Using Benthic Macroinvertebrates Nov-01
Yellow Creek Lakes Kosciusko Yellow Creek Lakes Kosciuso Yellow Creek Lakes Watershed Diagnostic Study June-09