﻿<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:content="http://purl.org/rss/1.0/modules/content/"><channel><title>Indiana Department of Transportation - News Releases</title>
    <cf:treatAs xmlns:cf="http://www.microsoft.com/schemas/rss/core/2005">list</cf:treatAs>
    <link>http://www.in.gov/activecalendar/default.aspx</link>
    <description>RSS Feed IN.GOV Calendar</description>
    <item>
      <title><![CDATA[[INDOT - East Central] I-465 Lane Restrictions (6/20/2013 - 6/21/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105565&amp;information_id=182911&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/20/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;9:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/21/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;5:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;br /&gt;Marion County&lt;br /&gt;&lt;br /&gt;&lt;p style="text-align: center; line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;Lane Restrictions on I-465&lt;br /&gt;
&lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;To Install Traffic Sensors&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;INDIANAPOLIS&lt;/span&gt;&lt;/b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt; &amp;ndash; Indiana Department of Transportation (INDOT) contractors plan to restrict traffic lanes on I-465 during overnight hours this week to replace traffic sensors in the roadway. The work is weather dependent, and the following schedule is subject to change:&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Tuesday, June 18:&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;ul style="list-style-type: disc; margin-top: 0in;"&gt;
    &lt;li style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;The two right lanes of northbound I-465 will be restricted from 9 p.m. to 5 a.m. (mile marker 42.5) between I-70 and Pendleton Pike on the east side. Three lanes will be restricted from midnight to 5 a.m.&lt;/span&gt;&lt;/li&gt;
    &lt;li style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;The right three lanes of northbound I-465 will be restricted from 9 p.m. to 5 a.m. (at mile marker 15) approaching Exit 16 to I-74, U.S. 136 and Crawfordsville Road on the west side.&lt;/span&gt;&lt;/li&gt;
&lt;/ul&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Wednesday, June 19:&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;ul style="list-style-type: disc; margin-top: 0in;"&gt;
    &lt;li style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;The two left lanes of southbound I-465 will be restricted from 9 p.m. to 5 a.m. (at mile marker 42.5) between Pendleton Pike and I-70 on the east side. Three lanes will be restricted from midnight to 5 a.m.&lt;/span&gt;&lt;/li&gt;
&lt;/ul&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Thursday, June 20:&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;ul style="list-style-type: disc; margin-top: 0in;"&gt;
    &lt;li style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;The right two lanes of southbound I-465 will be restricted from 9 p.m. to 5 a.m. (at mile marker 42.5) between Pendleton Pike and I-70 on the east side. Three lanes will be restricted from midnight to 5 a.m. &lt;/span&gt;&lt;/li&gt;
&lt;/ul&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Crews will replace sensors in each lane that are used to continuously collect data, such as vehicle size and traffic volumes. This work is weather dependent and will be rescheduled in the event of rain.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;Motorists can learn about Indiana traffic conditions, road closures, construction information and crashes by visiting &lt;a href="http://www.trafficwise.in.gov/"&gt;www.TrafficWise.in.gov&lt;/a&gt; or calling 1-800-261-ROAD (7623).&amp;nbsp; For the latest INDOT news, information and updates follow &lt;a href="http://www.twitter.com/INDOT_ECentral"&gt;@INDOT_ECentral&lt;/a&gt; on Twitter and like &lt;a href="http://www.facebook.com/INDOTEastCentral"&gt;Indiana Department of Transportation: EastCentral&lt;/a&gt; on Facebook.&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[Lane Restrictions on I-465
To Install Traffic Sensors

INDIANAPOLIS  Indiana Department of Transportation (INDOT) contractors plan to restrict traffic lanes on I-465 during overnight hours this week to replace traffic sensors in the roadway. The work is weather dependent, and the following schedule is subject to change:
 
Tuesday, June 18:

    The two right lanes of northbound I-465 will be restricted from 9 p.m. to 5 a.m. (mile marker 42.5) between I-70 and Pendleton Pike on the east side. Three lanes will be restricted from midnight to 5 a.m.
    The right three lanes of northbound I-465 will be restricted from 9 p.m. to 5 a.m. (at mile marker 15) approaching Exit 16 to I-74, U.S. 136 and Crawfordsville Road on the west side.

Wednesday, June 19:

    The two left lanes of southbound I-465 will be restricted from 9 p.m. to 5 a.m. (at mile marker 42.5) between Pendleton Pike and I-70 on the east side. Three lanes will be restricted from midnight to 5 a.m.

Thursday, June 20:

    The right two lanes of southbound I-465 will be restricted from 9 p.m. to 5 a.m. (at mile marker 42.5) between Pendleton Pike and I-70 on the east side. Three lanes will be restricted from midnight to 5 a.m. 

 
Crews will replace sensors in each lane that are used to continuously collect data, such as vehicle size and traffic volumes. This work is weather dependent and will be rescheduled in the event of rain.
Motorists can learn about Indiana traffic conditions, road closures, construction information and crashes by visiting www.TrafficWise.in.gov or calling 1-800-261-ROAD (7623).  For the latest INDOT news, information and updates follow @INDOT_ECentral on Twitter and like Indiana Department of Transportation: EastCentral on Facebook.]]></description>
      <pubDate>Fri, 21 Jun 2013 01:00:00 GMT</pubDate>
      <category>06/20/2013</category>
    </item>
    <item>
      <title><![CDATA[I-74 Eastbound Repairs This Weekend In Shelby County (6/20/2013 - 6/21/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=106656&amp;information_id=183141&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/20/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;12:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/21/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;11:59 PM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;p&gt;&lt;span style="line-height: 115%; font-family: arial, sans-serif; font-size: 12pt;"&gt;SHELBYVILLE, Ind.&amp;mdash;The Indiana Department of Transportation will make scheduled repairs to Interstate 74 this weekend&amp;mdash;beginning Friday night at 9 o&amp;rsquo;clock, weather permitting&amp;mdash;between Indianapolis and Shelbyville.&amp;nbsp; Motorists will encounter a right lane closure along eastbound I-74 from mile marker 105.0 to mile marker 109.0 (Fairland exit).&amp;nbsp; &lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p&gt;&lt;span style="line-height: 115%; font-family: arial, sans-serif; font-size: 12pt;"&gt;Reith Riley&amp;mdash;the contractor for a state repair contract calling for full-depth concrete patching, partial-depth asphalt patching, undersealing and crack sealing on I-74&amp;mdash;plans to saw cut, remove and replace sections of failed concrete pavement.&amp;nbsp; Full-depth concrete patches in the eastbound right lane will be up to 66 feet in length.&lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="margin: 0in 0in 10pt;"&gt;&lt;span style="line-height: 115%; font-family: arial, sans-serif; font-size: 12pt;"&gt;Restrictions should be lifted by 5 p.m. Sunday, allowing time for new concrete to cure.&lt;/span&gt;&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[SHELBYVILLE, Ind.The Indiana Department of Transportation will make scheduled repairs to Interstate 74 this weekendbeginning Friday night at 9 oclock, weather permittingbetween Indianapolis and Shelbyville.  Motorists will encounter a right lane closure along eastbound I-74 from mile marker 105.0 to mile marker 109.0 (Fairland exit).  
 
Reith Rileythe contractor for a state repair contract calling for full-depth concrete patching, partial-depth asphalt patching, undersealing and crack sealing on I-74plans to saw cut, remove and replace sections of failed concrete pavement.  Full-depth concrete patches in the eastbound right lane will be up to 66 feet in length.
 
Restrictions should be lifted by 5 p.m. Sunday, allowing time for new concrete to cure.]]></description>
      <pubDate>Thu, 20 Jun 2013 04:00:01 GMT</pubDate>
      <category>06/20/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT - East Central] I-465 Lane Restrictions (6/19/2013 - 6/20/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105565&amp;information_id=182910&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/19/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;9:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/20/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;5:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;br /&gt;Marion County&lt;br /&gt;&lt;br /&gt;&lt;p style="text-align: center; line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;Lane Restrictions on I-465&lt;br /&gt;
&lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;To Install Traffic Sensors&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;INDIANAPOLIS&lt;/span&gt;&lt;/b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt; &amp;ndash; Indiana Department of Transportation (INDOT) contractors plan to restrict traffic lanes on I-465 during overnight hours this week to replace traffic sensors in the roadway. The work is weather dependent, and the following schedule is subject to change:&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Tuesday, June 18:&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;ul style="list-style-type: disc; margin-top: 0in;"&gt;
    &lt;li style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;The two right lanes of northbound I-465 will be restricted from 9 p.m. to 5 a.m. (mile marker 42.5) between I-70 and Pendleton Pike on the east side. Three lanes will be restricted from midnight to 5 a.m.&lt;/span&gt;&lt;/li&gt;
    &lt;li style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;The right three lanes of northbound I-465 will be restricted from 9 p.m. to 5 a.m. (at mile marker 15) approaching Exit 16 to I-74, U.S. 136 and Crawfordsville Road on the west side.&lt;/span&gt;&lt;/li&gt;
&lt;/ul&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Wednesday, June 19:&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;ul style="list-style-type: disc; margin-top: 0in;"&gt;
    &lt;li style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;The two left lanes of southbound I-465 will be restricted from 9 p.m. to 5 a.m. (at mile marker 42.5) between Pendleton Pike and I-70 on the east side. Three lanes will be restricted from midnight to 5 a.m.&lt;/span&gt;&lt;/li&gt;
&lt;/ul&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Thursday, June 20:&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;ul style="list-style-type: disc; margin-top: 0in;"&gt;
    &lt;li style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;The right two lanes of southbound I-465 will be restricted from 9 p.m. to 5 a.m. (at mile marker 42.5) between Pendleton Pike and I-70 on the east side. Three lanes will be restricted from midnight to 5 a.m. &lt;/span&gt;&lt;/li&gt;
&lt;/ul&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Crews will replace sensors in each lane that are used to continuously collect data, such as vehicle size and traffic volumes. This work is weather dependent and will be rescheduled in the event of rain.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;Motorists can learn about Indiana traffic conditions, road closures, construction information and crashes by visiting &lt;a href="http://www.trafficwise.in.gov/"&gt;www.TrafficWise.in.gov&lt;/a&gt; or calling 1-800-261-ROAD (7623).&amp;nbsp; For the latest INDOT news, information and updates follow &lt;a href="http://www.twitter.com/INDOT_ECentral"&gt;@INDOT_ECentral&lt;/a&gt; on Twitter and like &lt;a href="http://www.facebook.com/INDOTEastCentral"&gt;Indiana Department of Transportation: EastCentral&lt;/a&gt; on Facebook.&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[Lane Restrictions on I-465
To Install Traffic Sensors

INDIANAPOLIS  Indiana Department of Transportation (INDOT) contractors plan to restrict traffic lanes on I-465 during overnight hours this week to replace traffic sensors in the roadway. The work is weather dependent, and the following schedule is subject to change:
 
Tuesday, June 18:

    The two right lanes of northbound I-465 will be restricted from 9 p.m. to 5 a.m. (mile marker 42.5) between I-70 and Pendleton Pike on the east side. Three lanes will be restricted from midnight to 5 a.m.
    The right three lanes of northbound I-465 will be restricted from 9 p.m. to 5 a.m. (at mile marker 15) approaching Exit 16 to I-74, U.S. 136 and Crawfordsville Road on the west side.

Wednesday, June 19:

    The two left lanes of southbound I-465 will be restricted from 9 p.m. to 5 a.m. (at mile marker 42.5) between Pendleton Pike and I-70 on the east side. Three lanes will be restricted from midnight to 5 a.m.

Thursday, June 20:

    The right two lanes of southbound I-465 will be restricted from 9 p.m. to 5 a.m. (at mile marker 42.5) between Pendleton Pike and I-70 on the east side. Three lanes will be restricted from midnight to 5 a.m. 

 
Crews will replace sensors in each lane that are used to continuously collect data, such as vehicle size and traffic volumes. This work is weather dependent and will be rescheduled in the event of rain.
Motorists can learn about Indiana traffic conditions, road closures, construction information and crashes by visiting www.TrafficWise.in.gov or calling 1-800-261-ROAD (7623).  For the latest INDOT news, information and updates follow @INDOT_ECentral on Twitter and like Indiana Department of Transportation: EastCentral on Facebook.]]></description>
      <pubDate>Thu, 20 Jun 2013 01:00:00 GMT</pubDate>
      <category>06/19/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT - East Central] Overnight I-69 Lane Restrictions in Hamilton County (6/19/2013 - 6/20/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105876&amp;information_id=183084&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/19/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;8:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/20/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;br /&gt;Hamilton County&lt;br /&gt;&lt;br /&gt;&lt;p style="text-align: center; line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-size: 16pt;"&gt;Contractors Plan Lane Restrictions&lt;br /&gt;
&lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-size: 16pt;"&gt;For Operation Indy Commute I-69&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;FISHERS, Ind.&lt;/b&gt; &amp;ndash; Indiana Department of Transportation (INDOT) contractors are planning overnight lane restrictions this week as part of Operation Indy Commute &amp;ndash; I-69.&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;Rieth-Riley Construction, the INDOT contractor for the $11 million added travel lanes project, plans northbound and southbound left lane restrictions between 96&lt;sup&gt;th&lt;/sup&gt; Street and 116&lt;sup&gt;th&lt;/sup&gt; Street to begin subgrade treatment tonight, Tuesday and Wednesday nights from 8 p.m. to 6 a.m. &lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;Rieth-Riley is constructing an additional travel lane along southbound I-69 between 116&lt;sup&gt;th&lt;/sup&gt; Street and I-465. Auxiliary lanes will be built to connect northbound and southbound interchange ramps between 116&lt;sup&gt;th&lt;/sup&gt;, 96&lt;sup&gt;th&lt;/sup&gt; and 82&lt;sup&gt;nd&lt;/sup&gt; streets. &lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;Milestone Contractors, the state&amp;rsquo;s contractor for the $18 million interchange improvement project at Exit 205, plans alternating lane restrictions for paving on northbound I-69 between the State Road 37 flyover and Cumberland Road on Tuesday and Wednesday nights from 8 p.m. to 5 a.m.&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;All improvements on both contracts are expected to be complete by the end of this year.&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;For more information about Operation Indy Commute &amp;ndash; I-69, and to sign up to receive updates throughout the project, visit &lt;a href="http://www.indycommute.indot.in.gov/"&gt;www.IndyCommute.indot.in.gov&lt;/a&gt;. For construction updates, photos and more via social media, &amp;ldquo;like&amp;rdquo; the &lt;a href="http://www.facebook.com/INDOTEastCentral"&gt;Indiana Department of Transportation:&amp;nbsp; East Central&lt;/a&gt; Facebook page and follow &lt;a href="http://www.twitter.com/INDOT_ECentral"&gt;@INDOT_ECentral&lt;/a&gt; on Twitter. &lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[Contractors Plan Lane Restrictions
For Operation Indy Commute I-69
 
FISHERS, Ind.  Indiana Department of Transportation (INDOT) contractors are planning overnight lane restrictions this week as part of Operation Indy Commute  I-69.
 
Rieth-Riley Construction, the INDOT contractor for the $11 million added travel lanes project, plans northbound and southbound left lane restrictions between 96th Street and 116th Street to begin subgrade treatment tonight, Tuesday and Wednesday nights from 8 p.m. to 6 a.m. 
 
Rieth-Riley is constructing an additional travel lane along southbound I-69 between 116th Street and I-465. Auxiliary lanes will be built to connect northbound and southbound interchange ramps between 116th, 96th and 82nd streets. 
 
Milestone Contractors, the states contractor for the $18 million interchange improvement project at Exit 205, plans alternating lane restrictions for paving on northbound I-69 between the State Road 37 flyover and Cumberland Road on Tuesday and Wednesday nights from 8 p.m. to 5 a.m.
 
All improvements on both contracts are expected to be complete by the end of this year.
 
For more information about Operation Indy Commute  I-69, and to sign up to receive updates throughout the project, visit www.IndyCommute.indot.in.gov. For construction updates, photos and more via social media, like the Indiana Department of Transportation:  East Central Facebook page and follow @INDOT_ECentral on Twitter. ]]></description>
      <pubDate>Thu, 20 Jun 2013 00:00:00 GMT</pubDate>
      <category>06/19/2013</category>
    </item>
    <item>
      <title><![CDATA[U.S. 50 Lawrenceville Bridge Hearing June 25 (6/19/2013 - 6/20/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=106658&amp;information_id=183145&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/19/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;8:30 AM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/20/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;9:25 AM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;p style="line-height: 115%;"&gt;&lt;span style="font-family: arial, sans-serif;"&gt;LAWRENCEBURG, Ind.&amp;mdash;The Indiana Department of Transportation has scheduled a public hearing to present preliminary engineering plans and provide opportunities for public comment regarding a proposed U.S. Highway 50 bridge replacement over Tanners Creek, a service road and resurfacing of U.S. 50 from the east side of the bridge to just west of the Central Railroad crossing at Lawrenceburg.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="font-family: arial, sans-serif;"&gt;The hearing is slated to begin at 5:30 p.m., Tuesday, June 25, at the Lawrenceburg Fire Department building located at 300 W. Tate Street.&lt;/span&gt;&lt;/p&gt;
&lt;p style="margin: 0in -13.5pt 0pt 0in;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="margin: 0in -13.5pt 0pt 0in;"&gt;&lt;span style="font-family: arial, sans-serif;"&gt;The existing US 50 Tanners Creek bridge is a 5-&lt;/span&gt;&lt;span style="font-family: arial, sans-serif;"&gt;span continuous riveted plate girder structure built in 1936.&amp;nbsp; It is deemed &amp;ldquo;historic&amp;rdquo;, but &amp;ldquo;non-select.&amp;rdquo;&amp;nbsp; Information about the b&lt;/span&gt;&lt;span style="font-family: arial, sans-serif;"&gt;ridge can be found at:&amp;nbsp; &lt;a href="http://www.in.gov/indot/2919.htm"&gt;&lt;span style="font-family: times new roman;"&gt;http://www.in.gov/indot/2919.htm&lt;/span&gt;&lt;/a&gt;.&amp;nbsp; &lt;/span&gt;&lt;/p&gt;
&lt;p style="margin: 0in -13.5pt 0pt 0in;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="margin: 0in -13.5pt 0pt 0in;"&gt;&lt;span style="font-family: arial, sans-serif;"&gt;Preliminary plans call for rehabilitating and widening the bridge.&amp;nbsp; The deck and beams would be removed and replaced, existing piers and abutments repaired and widened to accommodate four 12-foot travel lanes and a 13-foot sidewalk on the south side.&lt;/span&gt;&lt;/p&gt;
&lt;p style="margin: 0in -13.5pt 0pt 0in;"&gt;&lt;span style="font-family: arial, sans-serif;"&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p style="margin: 0in -13.5pt 0pt 0in;"&gt;&lt;span style="font-family: arial, sans-serif;"&gt;A tentative timetable for right‑of‑way acqui­sition and construction will be discussed, followed by public statements that will be recorded for consideration prior to developing a final engineering design.&amp;nbsp; Preliminary plans can be viewed at:&amp;nbsp; &lt;/span&gt;&lt;/p&gt;
&lt;ul&gt;
    &lt;li&gt;&lt;span style="font-family: arial, sans-serif;"&gt;Hearings Examiner, Room N642, Indiana Government Center North, 100 North Senate Avenue, Indianapolis&lt;/span&gt; &lt;/li&gt;
    &lt;li&gt;&lt;span style="font-family: arial, sans-serif;"&gt;Planning &amp;amp; Programming Department, Indiana Department of Transportation Seymour District office, 185 Agrico Lane, Seymour&lt;/span&gt; &lt;/li&gt;
    &lt;li&gt;&lt;span style="font-family: arial, sans-serif;"&gt;Lawrenceburg Public Library, 150 Mary Street, Lawrenceburg&lt;/span&gt; &lt;/li&gt;
&lt;/ul&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[LAWRENCEBURG, Ind.The Indiana Department of Transportation has scheduled a public hearing to present preliminary engineering plans and provide opportunities for public comment regarding a proposed U.S. Highway 50 bridge replacement over Tanners Creek, a service road and resurfacing of U.S. 50 from the east side of the bridge to just west of the Central Railroad crossing at Lawrenceburg.
The hearing is slated to begin at 5:30 p.m., Tuesday, June 25, at the Lawrenceburg Fire Department building located at 300 W. Tate Street.
 
The existing US 50 Tanners Creek bridge is a 5-span continuous riveted plate girder structure built in 1936.  It is deemed historic, but non-select.  Information about the bridge can be found at:  http://www.in.gov/indot/2919.htm.  
 
Preliminary plans call for rehabilitating and widening the bridge.  The deck and beams would be removed and replaced, existing piers and abutments repaired and widened to accommodate four 12-foot travel lanes and a 13-foot sidewalk on the south side.
 
A tentative timetable for right‑of‑way acqui­sition and construction will be discussed, followed by public statements that will be recorded for consideration prior to developing a final engineering design.  Preliminary plans can be viewed at:  

    Hearings Examiner, Room N642, Indiana Government Center North, 100 North Senate Avenue, Indianapolis 
    Planning  Programming Department, Indiana Department of Transportation Seymour District office, 185 Agrico Lane, Seymour 
    Lawrenceburg Public Library, 150 Mary Street, Lawrenceburg 

 ]]></description>
      <pubDate>Wed, 19 Jun 2013 12:30:00 GMT</pubDate>
      <category>06/19/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT-West Central] Frye Road Overpass work will restrict lanes on I-70 (6/19/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=106327&amp;information_id=183060&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/19/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;All Day&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/19/2013&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;br /&gt;Vigo County&lt;br /&gt;&lt;br /&gt;&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;&lt;b&gt;FOR IMMEDIATE RELEASE&lt;o:p _rdEditor_exists="1"&gt;&lt;/o:p&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;June 17, 2013&lt;o:p _rdEditor_exists="1"&gt;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="text-align: center; margin: 0in 17.3pt 0pt 0.25in;"&gt;&lt;b&gt;Frye Road Overpass work will restrict lanes on I-70 &lt;o:p _rdEditor_exists="1"&gt;&lt;/o:p&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="text-align: center; margin: 0in 17.3pt 0pt 0.25in;"&gt;&lt;i&gt;Restrictions begin today approximately two miles east of Exit 11&lt;o:p _rdEditor_exists="1"&gt;&lt;/o:p&gt;&lt;/i&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="text-align: center; margin: 0in 17.3pt 0pt 0.25in;"&gt;&lt;i&gt;&lt;o:p _rdEditor_exists="1"&gt;&amp;nbsp;&lt;/o:p&gt;&lt;/i&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 17.1pt 0pt 0.25in;"&gt;VIGO COUNTY, Ind. &amp;ndash; The Indiana Department of Transportation (INDOT) announces the Frye Road Overpass construction will restrict the left lane on I-70 between the 13 and 14 mile marker.&amp;nbsp; This lane restriction will be in effect for 24 hours a day for approximately two weeks.&amp;nbsp; &lt;o:p _rdEditor_exists="1"&gt;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 17.1pt 0pt 0in;"&gt;&lt;o:p _rdEditor_exists="1"&gt;&amp;nbsp;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 17.1pt 0pt 0.25in;"&gt;The contract was awarded to Halverson Construction Co., Inc. from Springfield, IL for $317,166.&amp;nbsp; This bridge was closed to traffic in September of last year after a piece of construction equipment struck and damaged the bridge.&amp;nbsp; This bridge rehabilitation project will replace three damaged beams and portions of the deck.&amp;nbsp; The work is scheduled for completion by July 19.&lt;o:p _rdEditor_exists="1"&gt;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 17.1pt 0pt 0in;"&gt;&lt;o:p _rdEditor_exists="1"&gt;&amp;nbsp;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 17.1pt 0pt 0.25in;"&gt;INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone.&amp;nbsp; For the latest news and information about INDOT, please visit &lt;a href="http://www.in.gov/indot"&gt;&lt;span style="color: #800080;"&gt;www.in.gov/indot&lt;/span&gt;&lt;/a&gt; or &lt;a href="http://www.trafficwise.in.gov/"&gt;www.trafficwise.IN.gov&lt;/a&gt; .&lt;o:p _rdEditor_exists="1"&gt;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="line-height: 115%; margin: 0in 0in 0pt;"&gt;&lt;o:p _rdEditor_exists="1"&gt;&amp;nbsp;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="text-align: center; line-height: 115%; margin: 0in 0in 0pt;"&gt;--30--&lt;o:p _rdEditor_exists="1"&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[FOR IMMEDIATE RELEASE
June 17, 2013
Frye Road Overpass work will restrict lanes on I-70 
Restrictions begin today approximately two miles east of Exit 11
 
VIGO COUNTY, Ind.  The Indiana Department of Transportation (INDOT) announces the Frye Road Overpass construction will restrict the left lane on I-70 between the 13 and 14 mile marker.  This lane restriction will be in effect for 24 hours a day for approximately two weeks.  
 
The contract was awarded to Halverson Construction Co., Inc. from Springfield, IL for $317,166.  This bridge was closed to traffic in September of last year after a piece of construction equipment struck and damaged the bridge.  This bridge rehabilitation project will replace three damaged beams and portions of the deck.  The work is scheduled for completion by July 19.
 
INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone.  For the latest news and information about INDOT, please visit www.in.gov/indot or www.trafficwise.IN.gov .
 
--30--]]></description>
      <pubDate>Wed, 19 Jun 2013 04:00:00 GMT</pubDate>
      <category>06/19/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT-West-Central] State Road 47 Chip Seal Project begins Wednesday (6/19/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=106331&amp;information_id=183062&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/19/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;All Day&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/19/2013&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;br /&gt;Montgomery County&lt;br /&gt;&lt;br /&gt;Parke County&lt;br /&gt;&lt;br /&gt;Putnam County&lt;br /&gt;&lt;br /&gt;&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;&lt;b&gt;FOR IMMEDIATE RELEASE&lt;o:p _rdEditor_exists="1"&gt;&lt;/o:p&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="line-height: 115%; margin: 0in 0in 0pt;"&gt;June 17, 2013&lt;o:p _rdEditor_exists="1"&gt;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 17.1pt 0pt 0.25in;"&gt;&lt;o:p _rdEditor_exists="1"&gt;&amp;nbsp;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="text-align: center; margin: 0in 17.3pt 0pt 0.25in;"&gt;&lt;b&gt;State Road 47 Chip Seal Project begins Wednesday&lt;o:p _rdEditor_exists="1"&gt;&lt;/o:p&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="text-align: center; margin: 0in 17.3pt 0pt 0.25in;"&gt;&lt;i&gt;&amp;nbsp;Motorists should drive slowly and use caution in this area&lt;o:p _rdEditor_exists="1"&gt;&lt;/o:p&gt;&lt;/i&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="text-align: center; margin: 0in 17.3pt 0pt 0.25in;"&gt;&lt;i&gt;&lt;o:p _rdEditor_exists="1"&gt;&amp;nbsp;&lt;/o:p&gt;&lt;/i&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 12.95pt 0pt 31.7pt;"&gt;MONTGOMERY/PARKE COUNTIES, Ind. &amp;ndash; The Indiana Department of Transportation (INDOT) announces maintenance crews will begin a pavement preservation project on State Road 47 (S.R. 47) on or after Wednesday, June 19.&amp;nbsp; S.R. 47 from US 41 to County Road 600 South (New Market Road) will be chip sealed.&amp;nbsp; &lt;o:p _rdEditor_exists="1"&gt;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 12.95pt 0pt 31.7pt;"&gt;&lt;o:p _rdEditor_exists="1"&gt;&amp;nbsp;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 12.95pt 0pt 31.7pt;"&gt;Traffic will be controlled by arrow boards and flagmen in the area they will be working.&amp;nbsp; Work on the roadway is scheduled to last through Wednesday, July 3.&amp;nbsp; The work schedule is subject to change in the event of inclement weather.&amp;nbsp; &lt;o:p _rdEditor_exists="1"&gt;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 12.95pt 0pt 31.7pt;"&gt;&lt;o:p _rdEditor_exists="1"&gt;&amp;nbsp;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt 31.7pt;"&gt;The chip-seal process consists of distributing a liquid asphalt emulsion on the roadway and covering the liquid asphalt with crushed stone to provide a new wearing surface. Chip-sealing extends the life of a roadway by protecting it from moisture, ultra-violet degradation and any other exposures that could damage a roadway.&lt;o:p _rdEditor_exists="1"&gt;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;&lt;o:p _rdEditor_exists="1"&gt;&amp;nbsp;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt 31.7pt;"&gt;Drivers should exercise caution during the construction of these projects. Loose stone will be present on the roadway during the initial cure of the asphalt and can damage windshields and paint on vehicles following each other too closely. It is recommended when travelling on a recently chip-sealed road to slow down and allow additional space between vehicles. &lt;o:p _rdEditor_exists="1"&gt;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;&lt;o:p _rdEditor_exists="1"&gt;&amp;nbsp;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt 31.7pt;"&gt;The fog seal is being applied on top of the chip-seal work. The fog seal is a light application of asphalt material that can lock in loose stone and help with dust problems. It also makes the road black, which makes pavement markings more visible. &lt;o:p _rdEditor_exists="1"&gt;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;&lt;o:p _rdEditor_exists="1"&gt;&amp;nbsp;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt 31.7pt;"&gt;INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone. For the latest news and information about INDOT, visit &lt;a href="http://www.in.gov/indot"&gt;&lt;span style="color: #800080;"&gt;www.in.gov/indot&lt;/span&gt;&lt;/a&gt;. You can find traffic restriction information at &lt;a href="http://www.trafficwise.in.gov/"&gt;www.trafficwise.IN.gov&lt;/a&gt;.&amp;nbsp; Contact the Crawfordsville District toll free at 1-888-WCINDOT.&lt;o:p _rdEditor_exists="1"&gt;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="text-align: center; line-height: 115%; margin: 0in 0in 0pt;"&gt;--30--&lt;o:p _rdEditor_exists="1"&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[FOR IMMEDIATE RELEASE
June 17, 2013
 
State Road 47 Chip Seal Project begins Wednesday
 Motorists should drive slowly and use caution in this area
 
MONTGOMERY/PARKE COUNTIES, Ind.  The Indiana Department of Transportation (INDOT) announces maintenance crews will begin a pavement preservation project on State Road 47 (S.R. 47) on or after Wednesday, June 19.  S.R. 47 from US 41 to County Road 600 South (New Market Road) will be chip sealed.  
 
Traffic will be controlled by arrow boards and flagmen in the area they will be working.  Work on the roadway is scheduled to last through Wednesday, July 3.  The work schedule is subject to change in the event of inclement weather.  
 
The chip-seal process consists of distributing a liquid asphalt emulsion on the roadway and covering the liquid asphalt with crushed stone to provide a new wearing surface. Chip-sealing extends the life of a roadway by protecting it from moisture, ultra-violet degradation and any other exposures that could damage a roadway.
 
Drivers should exercise caution during the construction of these projects. Loose stone will be present on the roadway during the initial cure of the asphalt and can damage windshields and paint on vehicles following each other too closely. It is recommended when travelling on a recently chip-sealed road to slow down and allow additional space between vehicles. 
 
The fog seal is being applied on top of the chip-seal work. The fog seal is a light application of asphalt material that can lock in loose stone and help with dust problems. It also makes the road black, which makes pavement markings more visible. 
 
INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone. For the latest news and information about INDOT, visit www.in.gov/indot. You can find traffic restriction information at www.trafficwise.IN.gov.  Contact the Crawfordsville District toll free at 1-888-WCINDOT.
--30--]]></description>
      <pubDate>Wed, 19 Jun 2013 04:00:00 GMT</pubDate>
      <category>06/19/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT - East Central] I-465 Lane Restrictions (6/18/2013 - 6/19/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105565&amp;information_id=182909&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/18/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;9:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/19/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;5:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;br /&gt;Marion County&lt;br /&gt;&lt;br /&gt;&lt;p style="text-align: center; line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;Lane Restrictions on I-465&lt;br /&gt;
&lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;To Install Traffic Sensors&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;INDIANAPOLIS&lt;/span&gt;&lt;/b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt; &amp;ndash; Indiana Department of Transportation (INDOT) contractors plan to restrict traffic lanes on I-465 during overnight hours this week to replace traffic sensors in the roadway. The work is weather dependent, and the following schedule is subject to change:&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Tuesday, June 18:&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;ul style="list-style-type: disc; margin-top: 0in;"&gt;
    &lt;li style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;The two right lanes of northbound I-465 will be restricted from 9 p.m. to 5 a.m. (mile marker 42.5) between I-70 and Pendleton Pike on the east side. Three lanes will be restricted from midnight to 5 a.m.&lt;/span&gt;&lt;/li&gt;
    &lt;li style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;The right three lanes of northbound I-465 will be restricted from 9 p.m. to 5 a.m. (at mile marker 15) approaching Exit 16 to I-74, U.S. 136 and Crawfordsville Road on the west side.&lt;/span&gt;&lt;/li&gt;
&lt;/ul&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Wednesday, June 19:&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;ul style="list-style-type: disc; margin-top: 0in;"&gt;
    &lt;li style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;The two left lanes of southbound I-465 will be restricted from 9 p.m. to 5 a.m. (at mile marker 42.5) between Pendleton Pike and I-70 on the east side. Three lanes will be restricted from midnight to 5 a.m.&lt;/span&gt;&lt;/li&gt;
&lt;/ul&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Thursday, June 20:&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;ul style="list-style-type: disc; margin-top: 0in;"&gt;
    &lt;li style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;The right two lanes of southbound I-465 will be restricted from 9 p.m. to 5 a.m. (at mile marker 42.5) between Pendleton Pike and I-70 on the east side. Three lanes will be restricted from midnight to 5 a.m. &lt;/span&gt;&lt;/li&gt;
&lt;/ul&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Crews will replace sensors in each lane that are used to continuously collect data, such as vehicle size and traffic volumes. This work is weather dependent and will be rescheduled in the event of rain.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;Motorists can learn about Indiana traffic conditions, road closures, construction information and crashes by visiting &lt;a href="http://www.trafficwise.in.gov/"&gt;www.TrafficWise.in.gov&lt;/a&gt; or calling 1-800-261-ROAD (7623).&amp;nbsp; For the latest INDOT news, information and updates follow &lt;a href="http://www.twitter.com/INDOT_ECentral"&gt;@INDOT_ECentral&lt;/a&gt; on Twitter and like &lt;a href="http://www.facebook.com/INDOTEastCentral"&gt;Indiana Department of Transportation: EastCentral&lt;/a&gt; on Facebook.&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[Lane Restrictions on I-465
To Install Traffic Sensors

INDIANAPOLIS  Indiana Department of Transportation (INDOT) contractors plan to restrict traffic lanes on I-465 during overnight hours this week to replace traffic sensors in the roadway. The work is weather dependent, and the following schedule is subject to change:
 
Tuesday, June 18:

    The two right lanes of northbound I-465 will be restricted from 9 p.m. to 5 a.m. (mile marker 42.5) between I-70 and Pendleton Pike on the east side. Three lanes will be restricted from midnight to 5 a.m.
    The right three lanes of northbound I-465 will be restricted from 9 p.m. to 5 a.m. (at mile marker 15) approaching Exit 16 to I-74, U.S. 136 and Crawfordsville Road on the west side.

Wednesday, June 19:

    The two left lanes of southbound I-465 will be restricted from 9 p.m. to 5 a.m. (at mile marker 42.5) between Pendleton Pike and I-70 on the east side. Three lanes will be restricted from midnight to 5 a.m.

Thursday, June 20:

    The right two lanes of southbound I-465 will be restricted from 9 p.m. to 5 a.m. (at mile marker 42.5) between Pendleton Pike and I-70 on the east side. Three lanes will be restricted from midnight to 5 a.m. 

 
Crews will replace sensors in each lane that are used to continuously collect data, such as vehicle size and traffic volumes. This work is weather dependent and will be rescheduled in the event of rain.
Motorists can learn about Indiana traffic conditions, road closures, construction information and crashes by visiting www.TrafficWise.in.gov or calling 1-800-261-ROAD (7623).  For the latest INDOT news, information and updates follow @INDOT_ECentral on Twitter and like Indiana Department of Transportation: EastCentral on Facebook.]]></description>
      <pubDate>Wed, 19 Jun 2013 01:00:00 GMT</pubDate>
      <category>06/18/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT - East Central] Overnight I-69 Lane Restrictions in Hamilton County (6/18/2013 - 6/19/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105876&amp;information_id=183018&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/18/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;8:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/19/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;br /&gt;Hamilton County&lt;br /&gt;&lt;br /&gt;&lt;p style="text-align: center; line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-size: 16pt;"&gt;Contractors Plan Lane Restrictions&lt;br /&gt;
&lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-size: 16pt;"&gt;For Operation Indy Commute I-69&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;FISHERS, Ind.&lt;/b&gt; &amp;ndash; Indiana Department of Transportation (INDOT) contractors are planning overnight lane restrictions this week as part of Operation Indy Commute &amp;ndash; I-69.&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;Rieth-Riley Construction, the INDOT contractor for the $11 million added travel lanes project, plans northbound and southbound left lane restrictions between 96&lt;sup&gt;th&lt;/sup&gt; Street and 116&lt;sup&gt;th&lt;/sup&gt; Street to begin subgrade treatment tonight, Tuesday and Wednesday nights from 8 p.m. to 6 a.m. &lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;Rieth-Riley is constructing an additional travel lane along southbound I-69 between 116&lt;sup&gt;th&lt;/sup&gt; Street and I-465. Auxiliary lanes will be built to connect northbound and southbound interchange ramps between 116&lt;sup&gt;th&lt;/sup&gt;, 96&lt;sup&gt;th&lt;/sup&gt; and 82&lt;sup&gt;nd&lt;/sup&gt; streets. &lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;Milestone Contractors, the state&amp;rsquo;s contractor for the $18 million interchange improvement project at Exit 205, plans alternating lane restrictions for paving on northbound I-69 between the State Road 37 flyover and Cumberland Road on Tuesday and Wednesday nights from 8 p.m. to 5 a.m.&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;All improvements on both contracts are expected to be complete by the end of this year.&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;For more information about Operation Indy Commute &amp;ndash; I-69, and to sign up to receive updates throughout the project, visit &lt;a href="http://www.indycommute.indot.in.gov/"&gt;www.IndyCommute.indot.in.gov&lt;/a&gt;. For construction updates, photos and more via social media, &amp;ldquo;like&amp;rdquo; the &lt;a href="http://www.facebook.com/INDOTEastCentral"&gt;Indiana Department of Transportation:&amp;nbsp; East Central&lt;/a&gt; Facebook page and follow &lt;a href="http://www.twitter.com/INDOT_ECentral"&gt;@INDOT_ECentral&lt;/a&gt; on Twitter. &lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[Contractors Plan Lane Restrictions
For Operation Indy Commute I-69
 
FISHERS, Ind.  Indiana Department of Transportation (INDOT) contractors are planning overnight lane restrictions this week as part of Operation Indy Commute  I-69.
 
Rieth-Riley Construction, the INDOT contractor for the $11 million added travel lanes project, plans northbound and southbound left lane restrictions between 96th Street and 116th Street to begin subgrade treatment tonight, Tuesday and Wednesday nights from 8 p.m. to 6 a.m. 
 
Rieth-Riley is constructing an additional travel lane along southbound I-69 between 116th Street and I-465. Auxiliary lanes will be built to connect northbound and southbound interchange ramps between 116th, 96th and 82nd streets. 
 
Milestone Contractors, the states contractor for the $18 million interchange improvement project at Exit 205, plans alternating lane restrictions for paving on northbound I-69 between the State Road 37 flyover and Cumberland Road on Tuesday and Wednesday nights from 8 p.m. to 5 a.m.
 
All improvements on both contracts are expected to be complete by the end of this year.
 
For more information about Operation Indy Commute  I-69, and to sign up to receive updates throughout the project, visit www.IndyCommute.indot.in.gov. For construction updates, photos and more via social media, like the Indiana Department of Transportation:  East Central Facebook page and follow @INDOT_ECentral on Twitter. ]]></description>
      <pubDate>Wed, 19 Jun 2013 00:00:00 GMT</pubDate>
      <category>06/18/2013</category>
    </item>
    <item>
      <title><![CDATA[New Albany-Jeffersonville Guardrail Repairs Wednesday Night (6/18/2013 - 6/19/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=106657&amp;information_id=183143&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/18/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;2:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/19/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;2:55 PM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;p&gt;&lt;span style="font-family: arial, sans-serif;"&gt;NEW ALBANY &amp;amp; JEFFERSONVILLE, Ind.&amp;mdash;The Indiana Department of Transportation has scheduled contracted crews to make guardrail repairs at two locations Wednesday night.&lt;/span&gt;&lt;/p&gt;
&lt;ul style="list-style-type: disc; margin-top: 0in;"&gt;
    &lt;li style="color: black;"&gt;&lt;strong&gt;&lt;span style="font-family: arial, sans-serif;"&gt;7 p.m.-11 p.m. Wednesday in New Albany.&amp;nbsp; &lt;/span&gt;&lt;/strong&gt;&lt;strong&gt;&lt;span style="font-family: arial, sans-serif; font-weight: normal;"&gt;Guardrail replacement along the Spring Street on-ramp to eastbound &lt;span style="background: yellow;"&gt;Interstate 64&lt;/span&gt; (just west of the Sherman Minton bridge).&amp;nbsp; The ramp will remain open during removal and replacement operations.&lt;/span&gt;&lt;/strong&gt;&lt;strong&gt; &lt;/strong&gt;&lt;/li&gt;
    &lt;li style="color: black;"&gt;&lt;strong&gt;&lt;span style="font-family: arial, sans-serif;"&gt;Midnight Wednesday-3 a.m. Thursday in Jeffersonville.&amp;nbsp; &lt;/span&gt;&lt;/strong&gt;&lt;strong&gt;&lt;span style="font-family: arial, sans-serif; font-weight: normal;"&gt;Replacement of the guardrail attenuator section on the left side of the northbound I-65 offramp to Court Avenue (Exit 0, just north of the Kennedy Bridge).&amp;nbsp; The ramp will remain open to traffic during repair operations. &lt;/span&gt;&lt;/strong&gt;&lt;/li&gt;
&lt;/ul&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[NEW ALBANY  JEFFERSONVILLE, Ind.The Indiana Department of Transportation has scheduled contracted crews to make guardrail repairs at two locations Wednesday night.

    7 p.m.-11 p.m. Wednesday in New Albany.  Guardrail replacement along the Spring Street on-ramp to eastbound Interstate 64 (just west of the Sherman Minton bridge).  The ramp will remain open during removal and replacement operations. 
    Midnight Wednesday-3 a.m. Thursday in Jeffersonville.  Replacement of the guardrail attenuator section on the left side of the northbound I-65 offramp to Court Avenue (Exit 0, just north of the Kennedy Bridge).  The ramp will remain open to traffic during repair operations. 
]]></description>
      <pubDate>Tue, 18 Jun 2013 18:00:00 GMT</pubDate>
      <category>06/18/2013</category>
    </item>
    <item>
      <title><![CDATA[U.S. 50 Traffic Shift TODAY In Lawrence County (6/18/2013 - 6/19/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=106659&amp;information_id=183147&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/18/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;1:30 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/19/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;1:30 AM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;p&gt;&lt;span style="font-family: arial, sans-serif;"&gt;BEDFORD, Ind.&amp;mdash;The Indiana Department of Transportation is switching single lane traffic on U.S. Highway 50 at the Back Creek bridge&amp;mdash;1.89 miles east of State Road 446 in Lawrence County&amp;mdash;to the north side of the structure today.&amp;nbsp; The change in traffic pattern will allow construction crews to work on the south half of the bridge.&lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p&gt;&lt;span style="font-family: arial, sans-serif;"&gt;Ragle Construction is the state&amp;rsquo;s contractor for this bridge deck overlay project.&lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p&gt;&lt;span style="font-family: arial, sans-serif;"&gt;Temporary signals have controlled one-lane-at-a-time traffic crossing the 200-foot concrete structure located near C.R. 950 East on U.S. 50 since April.&amp;nbsp; INDOT anticipates normalizing two-way traffic in September.&amp;nbsp; &lt;/span&gt;&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[BEDFORD, Ind.The Indiana Department of Transportation is switching single lane traffic on U.S. Highway 50 at the Back Creek bridge1.89 miles east of State Road 446 in Lawrence Countyto the north side of the structure today.  The change in traffic pattern will allow construction crews to work on the south half of the bridge.
 
Ragle Construction is the states contractor for this bridge deck overlay project.
 
Temporary signals have controlled one-lane-at-a-time traffic crossing the 200-foot concrete structure located near C.R. 950 East on U.S. 50 since April.  INDOT anticipates normalizing two-way traffic in September.  ]]></description>
      <pubDate>Tue, 18 Jun 2013 17:30:00 GMT</pubDate>
      <category>06/18/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT - Northeast] SR 8 Closed Daily in Auburn due to Water Main Work (6/18/2013 - 6/21/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=106622&amp;information_id=183113&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/18/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;12:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/21/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;5:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;br /&gt;DeKalb County&lt;br /&gt;&lt;br /&gt;&lt;strong&gt;AUBURN, Ind.&lt;/strong&gt; &amp;ndash; The Indiana Department of Transportation announces that SR 8 (E. 7th Street) in Auburn will have daily closures between Union Street and Duesenberg Drive until early July. The closures are due to water main work, and the restriction will lift each night after 5pm. &lt;br /&gt;
&lt;br /&gt;
The daytime detour follows Grandstaff Drive to Auburn Drive to Amstutz Road. Access is available to local businesses on SR 8 via Auburn city streets. &lt;br /&gt;
&lt;br /&gt;
INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone. For the latest news and information about INDOT, visit &lt;a href="http://www.in.gov/indot"&gt;www.in.gov/indot&lt;/a&gt;. You can find traffic restriction information at &lt;a href="http://www.trafficwise.IN.gov"&gt;www.trafficwise.IN.gov&lt;/a&gt;. Contact the Fort Wayne District toll free at 866-227-3555. &lt;br /&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[AUBURN, Ind.  The Indiana Department of Transportation announces that SR 8 (E. 7th Street) in Auburn will have daily closures between Union Street and Duesenberg Drive until early July. The closures are due to water main work, and the restriction will lift each night after 5pm. 

The daytime detour follows Grandstaff Drive to Auburn Drive to Amstutz Road. Access is available to local businesses on SR 8 via Auburn city streets. 

INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone. For the latest news and information about INDOT, visit www.in.gov/indot. You can find traffic restriction information at www.trafficwise.IN.gov. Contact the Fort Wayne District toll free at 866-227-3555. ]]></description>
      <pubDate>Tue, 18 Jun 2013 04:00:01 GMT</pubDate>
      <category>06/18/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT - Northeast] US 224 Closure Scheduled in Huntington for Wednesday, June 19 (6/18/2013 - 6/23/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=106671&amp;information_id=183155&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/18/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;12:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/23/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;8:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;br /&gt;Huntington County&lt;br /&gt;&lt;br /&gt;&lt;strong&gt;HUNTINGTON, Ind.&lt;/strong&gt; &amp;ndash; The Indiana Department of Transportation (INDOT) announces that US 224/SR 5 (Warren Street) is scheduled for closure in Huntington on Wednesday, June 19, due to the Huntington Heritage Days festival. The closure is between Court Street and Park Drive. The detour is Court Street to Byron Street to Park Drive. The road will be re-opened by 8 a.m. on Monday, June 23. &lt;br /&gt;
&lt;br /&gt;
INDOT wants all drivers, event participants and their families to stay safe on the roads. It is important that drivers plan for additional time, maintain a safe speed and be alert for changing road conditions during festival season. Always buckle up, never drive impaired, drive defensively, drive attentively, and share the road. To check highway conditions before departing, visit &lt;a href="http://www.TrafficWise.in.gov "&gt;www.TrafficWise.in.gov &lt;/a&gt;or &lt;a href="http://www.indot.in.gov "&gt;www.indot.in.gov &lt;/a&gt;for links to the latest INDOT news and information. &lt;br /&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[HUNTINGTON, Ind.  The Indiana Department of Transportation (INDOT) announces that US 224/SR 5 (Warren Street) is scheduled for closure in Huntington on Wednesday, June 19, due to the Huntington Heritage Days festival. The closure is between Court Street and Park Drive. The detour is Court Street to Byron Street to Park Drive. The road will be re-opened by 8 a.m. on Monday, June 23. 

INDOT wants all drivers, event participants and their families to stay safe on the roads. It is important that drivers plan for additional time, maintain a safe speed and be alert for changing road conditions during festival season. Always buckle up, never drive impaired, drive defensively, drive attentively, and share the road. To check highway conditions before departing, visit www.TrafficWise.in.gov or www.indot.in.gov for links to the latest INDOT news and information. ]]></description>
      <pubDate>Tue, 18 Jun 2013 04:00:01 GMT</pubDate>
      <category>06/18/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT - Southwest] Lane Restrictions Planned on U.S. Route 41 in Sullivan County (6/18/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=106629&amp;information_id=183127&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/18/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;12:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/18/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;11:59 PM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;p style="text-align: center; margin: 0in 30.6pt 0pt 27pt;"&gt;&lt;b&gt;Lane Restrictions Planned on U.S. Route 41&lt;/b&gt;&lt;/p&gt;
&lt;p style="text-align: center;"&gt;&lt;i&gt;Motorists should expect minimal delays&lt;/i&gt;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;SHELBURN, Ind.&lt;/b&gt; &amp;ndash;The Indiana Department of Transportation (INDOT) is announcing lane restrictions for U.S. Route 41 in Sullivan County next week.&amp;nbsp; Motorist will have a change in their normal commute as the railroad company will be making repairs to the rail crossing 1.2 miles north of Shelburn.&lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p&gt;Work at this location will begin on Monday, June 24, at approximately 8:00 a.m.&amp;nbsp; Railroad crews will close one lane of traffic at a time, while a minimum of one lane of traffic in each direction will be maintained at all times.&amp;nbsp; Repairs to the crossing are anticipated to be complete by late evening on Friday, June 28, weather permitting.&lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p&gt;INDOT reminds motorists to follow the posted work zone speed limit, use caution and consider worker safety when traveling through a work zone.&amp;nbsp; For the latest news and information about INDOT, please visit &lt;a href="http://www.in.gov/indot" title="http://www.in.gov/indot"&gt;&lt;span style="color: #0000ff;"&gt;www.in.gov/indot&lt;/span&gt;&lt;/a&gt; or &lt;a href="http://www.trafficwise.in.gov/"&gt;&lt;span style="color: #0000ff;"&gt;www.trafficwise.in.gov&lt;/span&gt;&lt;/a&gt; . &lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="text-align: center;"&gt;--30--&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;MEDIA CONTACT:&lt;/b&gt;&amp;nbsp; Cher L. Elliott, Vincennes District, (812) 895-7310, &lt;a href="mailto:celliott@indot.in.gov"&gt;&lt;span style="color: #0000ff;"&gt;celliott@indot.in.gov&lt;/span&gt;&lt;/a&gt; &lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;a href="http://www.in.gov/indot/2707.htm"&gt;&lt;span style="color: windowtext; text-decoration: none; text-underline: none;"&gt;&lt;/span&gt;&lt;/a&gt;&lt;a href="http://www.facebook.com/#!/INDOTVincennesDistrict" target="_blank"&gt;&lt;/a&gt;&lt;a href="https://twitter.com/#!/INDOTSouthwest" target="_blank"&gt;&lt;/a&gt;&lt;span style="line-height: 115%; font-size: 11pt;"&gt;&lt;a href="http://www.youtube.com/user/IndianaDOT"&gt;&lt;/a&gt;&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[Lane Restrictions Planned on U.S. Route 41
Motorists should expect minimal delays

SHELBURN, Ind. The Indiana Department of Transportation (INDOT) is announcing lane restrictions for U.S. Route 41 in Sullivan County next week.  Motorist will have a change in their normal commute as the railroad company will be making repairs to the rail crossing 1.2 miles north of Shelburn.
 
Work at this location will begin on Monday, June 24, at approximately 8:00 a.m.  Railroad crews will close one lane of traffic at a time, while a minimum of one lane of traffic in each direction will be maintained at all times.  Repairs to the crossing are anticipated to be complete by late evening on Friday, June 28, weather permitting.
 
INDOT reminds motorists to follow the posted work zone speed limit, use caution and consider worker safety when traveling through a work zone.  For the latest news and information about INDOT, please visit www.in.gov/indot or www.trafficwise.in.gov . 
 
--30--

MEDIA CONTACT:  Cher L. Elliott, Vincennes District, (812) 895-7310, celliott@indot.in.gov 

 
 ]]></description>
      <pubDate>Tue, 18 Jun 2013 04:00:01 GMT</pubDate>
      <category>06/18/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT] SR 2 Closure, Porter-LaPorte Co (6/18/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=106655&amp;information_id=183139&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/18/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;12:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/18/2013&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;br /&gt;LaPorte County&lt;br /&gt;&lt;br /&gt;Porter County&lt;br /&gt;&lt;br /&gt;&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;PORTER/LAPORTE COUNTY, Ind. &amp;ndash; The Indiana Department of Transportation (INDOT) announces the one day closure of State Road 2 for two culvert replacements, about two miles southwest of U.S. 6, on Thursday, June 20&lt;sup&gt;th&lt;/sup&gt;. Local traffic may use State Road 2 up to each point of closure, from the east and the west.&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;&lt;o:p _rdEditor_exists="1"&gt;&amp;nbsp;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;Drivers wishing to travel west on SR 2 will be detoured west on U.S. 6, south on SR 49, and back to SR 2. Drivers wishing to travel east on SR 2 will be detoured north on SR 49, east on U.S. 6, and back to SR 2. &lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;&lt;o:p _rdEditor_exists="1"&gt;&amp;nbsp;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone. For the latest road closures and news from INDOT, like us at &lt;a href="http://www.facebook.com/INDOTNorthwest"&gt;&lt;span style="color: #0000ff;"&gt;www.Facebook.com/INDOTNorthwest&lt;/span&gt;&lt;/a&gt; and follow us at &lt;a href="http://www.twitter.com/INDOTNorthwest"&gt;&lt;span style="color: #0000ff;"&gt;www.Twitter.com/INDOTNorthwest&lt;/span&gt;&lt;/a&gt;.&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;&lt;o:p _rdEditor_exists="1"&gt;&amp;nbsp;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;You can find traffic restriction information at &lt;a href="http://www.trafficwise.in.gov/"&gt;&lt;span style="color: #0000ff;"&gt;www.trafficwise.IN.gov&lt;/span&gt;&lt;/a&gt;.&amp;nbsp; Contact the LaPorte District toll free at 1-855-GO-INDOT.&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[PORTER/LAPORTE COUNTY, Ind.  The Indiana Department of Transportation (INDOT) announces the one day closure of State Road 2 for two culvert replacements, about two miles southwest of U.S. 6, on Thursday, June 20th. Local traffic may use State Road 2 up to each point of closure, from the east and the west.
 
Drivers wishing to travel west on SR 2 will be detoured west on U.S. 6, south on SR 49, and back to SR 2. Drivers wishing to travel east on SR 2 will be detoured north on SR 49, east on U.S. 6, and back to SR 2. 
 
INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone. For the latest road closures and news from INDOT, like us at www.Facebook.com/INDOTNorthwest and follow us at www.Twitter.com/INDOTNorthwest.
 
You can find traffic restriction information at www.trafficwise.IN.gov.  Contact the LaPorte District toll free at 1-855-GO-INDOT.]]></description>
      <pubDate>Tue, 18 Jun 2013 04:00:01 GMT</pubDate>
      <category>06/18/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT] US 35 Bridge closure, north of Knox, Starke County (6/18/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=106691&amp;information_id=183171&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/18/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;12:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/18/2013&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;br /&gt;Starke County&lt;br /&gt;&lt;br /&gt;&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;STARKE COUNTY, Ind. &amp;ndash; The Indiana Department of Transportation (INDOT) announces the closure of the U.S. 35 bridge over the CSX railway, just south of U.S. 30 beginning Thursday, June 20&lt;sup&gt;th&lt;/sup&gt; through the end of November 2013. Crews are replacing the bridge.&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;&lt;o:p _rdEditor_exists="1"&gt;&amp;nbsp;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;Drivers wishing to travel north on U.S. 35 will be detoured west on SR 8, north on SR 39, east on U.S. 30, and back to U.S. 35. Drivers wishing to travel south on U.S. 35 will be detoured west on U.S. 30, south on SR 39, east on SR 8, and back to U.S. 35.&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;&lt;o:p _rdEditor_exists="1"&gt;&amp;nbsp;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone. For the latest road closures and news from INDOT, like us at &lt;a href="http://www.facebook.com/INDOTNorthwest"&gt;&lt;span style="color: #0000ff;"&gt;www.Facebook.com/INDOTNorthwest&lt;/span&gt;&lt;/a&gt; and follow us at &lt;a href="http://www.twitter.com/INDOTNorthwest"&gt;&lt;span style="color: #0000ff;"&gt;www.Twitter.com/INDOTNorthwest&lt;/span&gt;&lt;/a&gt;.&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;&lt;o:p _rdEditor_exists="1"&gt;&amp;nbsp;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;You can find traffic restriction information at &lt;a href="http://www.trafficwise.in.gov/"&gt;&lt;span style="color: #0000ff;"&gt;www.trafficwise.IN.gov&lt;/span&gt;&lt;/a&gt;.&amp;nbsp; Contact the LaPorte District toll free at 1-855-GO-INDOT.&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[STARKE COUNTY, Ind.  The Indiana Department of Transportation (INDOT) announces the closure of the U.S. 35 bridge over the CSX railway, just south of U.S. 30 beginning Thursday, June 20th through the end of November 2013. Crews are replacing the bridge.
 
Drivers wishing to travel north on U.S. 35 will be detoured west on SR 8, north on SR 39, east on U.S. 30, and back to U.S. 35. Drivers wishing to travel south on U.S. 35 will be detoured west on U.S. 30, south on SR 39, east on SR 8, and back to U.S. 35.
 
INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone. For the latest road closures and news from INDOT, like us at www.Facebook.com/INDOTNorthwest and follow us at www.Twitter.com/INDOTNorthwest.
 
You can find traffic restriction information at www.trafficwise.IN.gov.  Contact the LaPorte District toll free at 1-855-GO-INDOT.]]></description>
      <pubDate>Tue, 18 Jun 2013 04:00:01 GMT</pubDate>
      <category>06/18/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT - East Central] Overnight I-69 Lane Restrictions in Hamilton County (6/17/2013 - 6/18/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105876&amp;information_id=183017&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/17/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;8:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/18/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;br /&gt;Hamilton County&lt;br /&gt;&lt;br /&gt;&lt;p style="text-align: center; line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-size: 16pt;"&gt;Contractors Plan Lane Restrictions&lt;br /&gt;
&lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-size: 16pt;"&gt;For Operation Indy Commute I-69&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;FISHERS, Ind.&lt;/b&gt; &amp;ndash; Indiana Department of Transportation (INDOT) contractors are planning overnight lane restrictions this week as part of Operation Indy Commute &amp;ndash; I-69.&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;Rieth-Riley Construction, the INDOT contractor for the $11 million added travel lanes project, plans northbound and southbound left lane restrictions between 96&lt;sup&gt;th&lt;/sup&gt; Street and 116&lt;sup&gt;th&lt;/sup&gt; Street to begin subgrade treatment tonight, Tuesday and Wednesday nights from 8 p.m. to 6 a.m. &lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;Rieth-Riley is constructing an additional travel lane along southbound I-69 between 116&lt;sup&gt;th&lt;/sup&gt; Street and I-465. Auxiliary lanes will be built to connect northbound and southbound interchange ramps between 116&lt;sup&gt;th&lt;/sup&gt;, 96&lt;sup&gt;th&lt;/sup&gt; and 82&lt;sup&gt;nd&lt;/sup&gt; streets. &lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;Milestone Contractors, the state&amp;rsquo;s contractor for the $18 million interchange improvement project at Exit 205, plans alternating lane restrictions for paving on northbound I-69 between the State Road 37 flyover and Cumberland Road on Tuesday and Wednesday nights from 8 p.m. to 5 a.m.&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;All improvements on both contracts are expected to be complete by the end of this year.&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;For more information about Operation Indy Commute &amp;ndash; I-69, and to sign up to receive updates throughout the project, visit &lt;a href="http://www.indycommute.indot.in.gov/"&gt;www.IndyCommute.indot.in.gov&lt;/a&gt;. For construction updates, photos and more via social media, &amp;ldquo;like&amp;rdquo; the &lt;a href="http://www.facebook.com/INDOTEastCentral"&gt;Indiana Department of Transportation:&amp;nbsp; East Central&lt;/a&gt; Facebook page and follow &lt;a href="http://www.twitter.com/INDOT_ECentral"&gt;@INDOT_ECentral&lt;/a&gt; on Twitter. &lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[Contractors Plan Lane Restrictions
For Operation Indy Commute I-69
 
FISHERS, Ind.  Indiana Department of Transportation (INDOT) contractors are planning overnight lane restrictions this week as part of Operation Indy Commute  I-69.
 
Rieth-Riley Construction, the INDOT contractor for the $11 million added travel lanes project, plans northbound and southbound left lane restrictions between 96th Street and 116th Street to begin subgrade treatment tonight, Tuesday and Wednesday nights from 8 p.m. to 6 a.m. 
 
Rieth-Riley is constructing an additional travel lane along southbound I-69 between 116th Street and I-465. Auxiliary lanes will be built to connect northbound and southbound interchange ramps between 116th, 96th and 82nd streets. 
 
Milestone Contractors, the states contractor for the $18 million interchange improvement project at Exit 205, plans alternating lane restrictions for paving on northbound I-69 between the State Road 37 flyover and Cumberland Road on Tuesday and Wednesday nights from 8 p.m. to 5 a.m.
 
All improvements on both contracts are expected to be complete by the end of this year.
 
For more information about Operation Indy Commute  I-69, and to sign up to receive updates throughout the project, visit www.IndyCommute.indot.in.gov. For construction updates, photos and more via social media, like the Indiana Department of Transportation:  East Central Facebook page and follow @INDOT_ECentral on Twitter. ]]></description>
      <pubDate>Tue, 18 Jun 2013 00:00:00 GMT</pubDate>
      <category>06/17/2013</category>
    </item>
    <item>
      <title><![CDATA[S.R. 46 Traffic Shift At Monroe-Owen CO Line TUESDAY (6/16/2013 - 6/17/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105911&amp;information_id=183044&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/16/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/17/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6:55 PM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;p&gt;&lt;span style="font-family: arial, sans-serif;"&gt;SPENCER, Ind.&amp;mdash;The Indiana Department of Transportation plans to shift State Road 46 traffic at the Monroe-Owen County Line Road&amp;mdash;four miles east of Spencer&amp;mdash;Tuesday (JUNE 18), weather permitting.&amp;nbsp; Motorists will be routed 22 feet to the north of existing lanes, allowing construction crews to work on the south side of a project designed to correct sight distance concerns.&amp;nbsp; &lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p&gt;&lt;span style="font-family: arial, sans-serif;"&gt;Tuesday&amp;rsquo;s traffic shift will remain in effect for up to three months.&amp;nbsp; Speed limits will be reduced to 45 mph through the construction zone.&lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p&gt;&lt;span style="font-family: arial, sans-serif;"&gt;Milestone, the state&amp;rsquo;s contractor for this $2.8 million sight distance improvement project, is building nearly one mile of new S.R. 46 roadway to accommodate 12-foot lanes with 8-foot shoulders.&amp;nbsp; A hill along the route that obstructs line-of-sight vision is being lowered.&amp;nbsp; &lt;/span&gt;&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[SPENCER, Ind.The Indiana Department of Transportation plans to shift State Road 46 traffic at the Monroe-Owen County Line Roadfour miles east of SpencerTuesday (JUNE 18), weather permitting.  Motorists will be routed 22 feet to the north of existing lanes, allowing construction crews to work on the south side of a project designed to correct sight distance concerns.  
 
Tuesdays traffic shift will remain in effect for up to three months.  Speed limits will be reduced to 45 mph through the construction zone.
 
Milestone, the states contractor for this $2.8 million sight distance improvement project, is building nearly one mile of new S.R. 46 roadway to accommodate 12-foot lanes with 8-foot shoulders.  A hill along the route that obstructs line-of-sight vision is being lowered.  ]]></description>
      <pubDate>Sun, 16 Jun 2013 22:00:00 GMT</pubDate>
      <category>06/16/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT - East Central] I-70 Repairs in Indianapolis (6/14/2013 - 6/16/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105630&amp;information_id=182959&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/14/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;9:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/16/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;2:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;p style="text-align: center; line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;I-70 Pavement Repairs &lt;br /&gt;
This Weekend&lt;br /&gt;
&lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;Between I-65 and I-465 &lt;br /&gt;
on West Side&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;INDIANAPOLIS&lt;/span&gt;&lt;/b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt; &amp;ndash; Indiana Department of Transportation (INDOT) contractors plan to repair pavement this weekend on I-70 west of I-65 (south split) to I-465.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;E &amp;amp; B Paving, the state&amp;rsquo;s contractor for the $1.2 million pavement restoration project, will restrict the left and center lanes of westbound I-70 from I-65 (south split) west to I-465 beginning at 9 p.m. Friday.&amp;nbsp; E &amp;amp; B will also restrict the left lane of eastbound I-70 between I-465 and I-65 (south split) beginning at 9 p.m. Friday.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;The lanes are expected to remain closed until Sunday, June 16 at approximately 2 p.m. The extended restriction will allow new concrete adequate time to cure.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Weekend lane restrictions for pavement replacement and sealing are expected to continue for approximately two months. Repairs will be made to both eastbound and westbound I-70. Work is weather-dependent and will be rescheduled in the event of rain.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;INDOT reminds drivers to be cautious and considerate when traveling through highway work zones. Be attentive to signs, message boards and work zone speed limits, as well as other drivers. &lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Project updates are available by following &lt;a href="http://www.twitter.com/INDOT_ECentral"&gt;@INDOT_ECentral&lt;/a&gt; on Twitter and liking the &lt;a href="http://www.facebook.com/INDOTEastCentral"&gt;Indiana Department of Transportation: East Central&lt;/a&gt; Facebook page.&amp;nbsp; For all the latest INDOT news and information, visit &lt;a href="http://www.indot.in.gov/"&gt;www.indot.in.gov&lt;/a&gt;.&lt;/span&gt;&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[I-70 Pavement Repairs 
This Weekend
Between I-65 and I-465 
on West Side

INDIANAPOLIS  Indiana Department of Transportation (INDOT) contractors plan to repair pavement this weekend on I-70 west of I-65 (south split) to I-465.
E  B Paving, the states contractor for the $1.2 million pavement restoration project, will restrict the left and center lanes of westbound I-70 from I-65 (south split) west to I-465 beginning at 9 p.m. Friday.  E  B will also restrict the left lane of eastbound I-70 between I-465 and I-65 (south split) beginning at 9 p.m. Friday.
The lanes are expected to remain closed until Sunday, June 16 at approximately 2 p.m. The extended restriction will allow new concrete adequate time to cure.
Weekend lane restrictions for pavement replacement and sealing are expected to continue for approximately two months. Repairs will be made to both eastbound and westbound I-70. Work is weather-dependent and will be rescheduled in the event of rain.
INDOT reminds drivers to be cautious and considerate when traveling through highway work zones. Be attentive to signs, message boards and work zone speed limits, as well as other drivers. 
Project updates are available by following @INDOT_ECentral on Twitter and liking the Indiana Department of Transportation: East Central Facebook page.  For all the latest INDOT news and information, visit www.indot.in.gov.]]></description>
      <pubDate>Sat, 15 Jun 2013 01:00:00 GMT</pubDate>
      <category>06/14/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT - East Central] US 31 Hamilton County Restrictions (6/14/2013 - 6/17/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105589&amp;information_id=182929&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/14/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;9:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/17/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;p style="text-align: center; line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;U.S. 31 Ramp to Keystone&lt;br /&gt;
&lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;Closes Tomorrow Night&lt;br /&gt;
&lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;For Weekend Repairs&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;HAMILTON COUNTY&lt;/span&gt;&lt;/b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt; &amp;ndash; The Indiana Department of Transportation (INDOT) has requested contractors temporarily close the southbound U.S. 31 ramp to Keystone Parkway in order to replace sections of concrete pavement not meeting INDOT quality standards.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;The ramp is scheduled to close tomorrow (Friday, June 14) at 9 p.m. and is expected to reopen before Monday, June 17 at 6 a.m. This schedule will be postponed in the event of inclement weather. &lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;INDOT and Walsh Construction, the state&amp;rsquo;s contractor for the $35 million U.S. 31 Hamilton County project, over the past few weeks have been repairing areas of concrete where premature surface cracking was identified. The ramp repairs are the final areas identified as requiring concrete replacement. &lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="text-align: center; line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;Lane Restriction Tonight to Set Bridge Beams&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;The right lane of southbound U.S. 31 will be restricted between 156&lt;sup&gt;th&lt;/sup&gt; Street and Union Street tonight beginning at 9 p.m. as contractors place beams at the bridge over Cool Creek. The lane is expected to reopen by 6 a.m.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Information about The New U.S. 31 Hamilton County and details about how to receive project updates can be found online at &lt;a href="http://us31hamiltoncounty.in.gov/"&gt;us31hamiltoncounty.in.gov&lt;/a&gt;. For regular INDOT news, information and updates, follow &lt;a href="http://www.twitter.com/INDOT_ECentral"&gt;@INDOT_ECentral&lt;/a&gt; on Twitter and like &lt;a href="http://www.facebook.com/INDOTEastCentral"&gt;Indiana Department of Transportation: East Central&lt;/a&gt; on Facebook.&lt;/span&gt;&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[U.S. 31 Ramp to Keystone
Closes Tomorrow Night
For Weekend Repairs

HAMILTON COUNTY  The Indiana Department of Transportation (INDOT) has requested contractors temporarily close the southbound U.S. 31 ramp to Keystone Parkway in order to replace sections of concrete pavement not meeting INDOT quality standards.
 
The ramp is scheduled to close tomorrow (Friday, June 14) at 9 p.m. and is expected to reopen before Monday, June 17 at 6 a.m. This schedule will be postponed in the event of inclement weather. 
 
INDOT and Walsh Construction, the states contractor for the $35 million U.S. 31 Hamilton County project, over the past few weeks have been repairing areas of concrete where premature surface cracking was identified. The ramp repairs are the final areas identified as requiring concrete replacement. 
 
Lane Restriction Tonight to Set Bridge Beams

The right lane of southbound U.S. 31 will be restricted between 156th Street and Union Street tonight beginning at 9 p.m. as contractors place beams at the bridge over Cool Creek. The lane is expected to reopen by 6 a.m.
 
Information about The New U.S. 31 Hamilton County and details about how to receive project updates can be found online at us31hamiltoncounty.in.gov. For regular INDOT news, information and updates, follow @INDOT_ECentral on Twitter and like Indiana Department of Transportation: East Central on Facebook.]]></description>
      <pubDate>Sat, 15 Jun 2013 01:00:00 GMT</pubDate>
      <category>06/14/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT - East Central] Operation Indy Commute I-69 Lane Restrictions (6/14/2013 - 6/15/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=104933&amp;information_id=182745&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/14/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;8:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/15/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;p style="text-align: center; line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;Contractors Removing Shoulder, &lt;br /&gt;
&lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;Beginning Subgrade Treatment &lt;br /&gt;
&lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;For Added Travel Lane on I-69&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;FISHERS, Ind.&lt;/span&gt;&lt;/b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt; &amp;ndash; Indiana Department of Transportation (INDOT) contractors are planning overnight lane restrictions this week as part of Operation Indy Commute &amp;ndash; I-69.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Rieth-Riley Construction, the INDOT contractor for the $11 million added travel lanes project, plans to remove shoulder pavement tonight, Tuesday and Wednesday nights along the southbound median of I-69. The milling will require a northbound left lane restriction between 96&lt;sup&gt;th&lt;/sup&gt; Street (Exit 203) and 116&lt;sup&gt;th&lt;/sup&gt; Street (Exit 205) beginning at 8 p.m. and ending by 6 a.m.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Contractors are also planning southbound left lane restrictions between 116&lt;sup&gt;th&lt;/sup&gt; Street and 96&lt;sup&gt;th&lt;/sup&gt; Street to begin subgrade treatment on Thursday and Friday nights from 8 p.m. to 6 a.m. &lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Rieth-Riley is removing the median shoulder of southbound I-69 to construct an added travel lane between 116&lt;sup&gt;th&lt;/sup&gt; Street and I-465. Auxiliary lanes will be built to connect northbound and southbound interchange ramps between 116&lt;sup&gt;th&lt;/sup&gt;, 96&lt;sup&gt;th&lt;/sup&gt; and 82&lt;sup&gt;nd&lt;/sup&gt; streets. All improvements are expected to be complete by the end of this year.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;For more information about Operation Indy Commute &amp;ndash; I-69, and to sign up to receive updates throughout the project, visit &lt;a href="http://www.indycommute.indot.in.gov/"&gt;www.IndyCommute.indot.in.gov&lt;/a&gt;. For construction updates, photos and more via social media, &amp;ldquo;like&amp;rdquo; the &lt;a href="http://www.facebook.com/INDOTEastCentral"&gt;Indiana Department of Transportation:&amp;nbsp; East Central&lt;/a&gt; Facebook page and follow &lt;a href="http://www.twitter.com/INDOT_ECentral"&gt;@INDOT_ECentral&lt;/a&gt; on Twitter. &lt;/span&gt;&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[Contractors Removing Shoulder, 
Beginning Subgrade Treatment 
For Added Travel Lane on I-69
FISHERS, Ind.  Indiana Department of Transportation (INDOT) contractors are planning overnight lane restrictions this week as part of Operation Indy Commute  I-69.
Rieth-Riley Construction, the INDOT contractor for the $11 million added travel lanes project, plans to remove shoulder pavement tonight, Tuesday and Wednesday nights along the southbound median of I-69. The milling will require a northbound left lane restriction between 96th Street (Exit 203) and 116th Street (Exit 205) beginning at 8 p.m. and ending by 6 a.m.
Contractors are also planning southbound left lane restrictions between 116th Street and 96th Street to begin subgrade treatment on Thursday and Friday nights from 8 p.m. to 6 a.m. 
Rieth-Riley is removing the median shoulder of southbound I-69 to construct an added travel lane between 116th Street and I-465. Auxiliary lanes will be built to connect northbound and southbound interchange ramps between 116th, 96th and 82nd streets. All improvements are expected to be complete by the end of this year.
For more information about Operation Indy Commute  I-69, and to sign up to receive updates throughout the project, visit www.IndyCommute.indot.in.gov. For construction updates, photos and more via social media, like the Indiana Department of Transportation:  East Central Facebook page and follow @INDOT_ECentral on Twitter. ]]></description>
      <pubDate>Sat, 15 Jun 2013 00:00:00 GMT</pubDate>
      <category>06/14/2013</category>
    </item>
    <item>
      <title><![CDATA[I-70 Lane Closure TOMORROW For Paving East Of Greenfield (6/14/2013 - 6/15/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105913&amp;information_id=183046&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/14/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;5:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/15/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;5:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;p&gt;&lt;span style="line-height: 115%; font-family: arial, sans-serif; font-size: 12pt;"&gt;GREENFIELD, Ind.&amp;mdash;Indiana Department of Transportation will close the left lane of westbound Interstate 70 east of Greenfield the entire day tomorrow (SATURDAY JUNE 15) for asphalt paving operations&amp;mdash;weather permitting.&lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p&gt;&lt;span style="line-height: 115%; font-family: arial, sans-serif; font-size: 12pt;"&gt;E &amp;amp; B Paving, the state&amp;rsquo;s contractor for this $1,281,600 Major Moves pavement project which requires weekend work through mid-July, plans to mill and resurface I-70&amp;rsquo;s westbound left lane from mile marker 104 (at State Road 9/Greenfield) to mile marker 108.&amp;nbsp; &lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="margin: 0in 0in 10pt;"&gt;&lt;span style="line-height: 115%; font-family: arial, sans-serif; font-size: 12pt;"&gt;The 4-mile lane closure will begin at 4 o&amp;rsquo;clock tomorrow morning.&amp;nbsp; Restrictions will be lifted at 9 p.m. &lt;/span&gt;&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[GREENFIELD, Ind.Indiana Department of Transportation will close the left lane of westbound Interstate 70 east of Greenfield the entire day tomorrow (SATURDAY JUNE 15) for asphalt paving operationsweather permitting.
 
E  B Paving, the states contractor for this $1,281,600 Major Moves pavement project which requires weekend work through mid-July, plans to mill and resurface I-70s westbound left lane from mile marker 104 (at State Road 9/Greenfield) to mile marker 108.  
 
The 4-mile lane closure will begin at 4 oclock tomorrow morning.  Restrictions will be lifted at 9 p.m. ]]></description>
      <pubDate>Fri, 14 Jun 2013 21:00:00 GMT</pubDate>
      <category>06/14/2013</category>
    </item>
    <item>
      <title><![CDATA[I-70 Traffic Switch In HANCOCK COUNTY Monday Night (6/14/2013 - 6/15/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105907&amp;information_id=183042&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/14/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;5:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/15/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;5:55 PM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;p style="margin: 0in 17.1pt 0pt 0in;"&gt;&lt;span style="font-family: arial, sans-serif;"&gt;GREENFIELD, Ind.&amp;mdash;A change in the traffic pattern on Interstate 70 will take place Monday night (JUNE 17) in Hancock County between mile markers 96.8 and 100.6.&amp;nbsp;&lt;br /&gt;
&lt;br /&gt;
&lt;/span&gt;&lt;/p&gt;
&lt;p style="margin: 0in 17.1pt 0pt 0in;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="margin: 0in 17.1pt 0pt 0in;"&gt;&lt;span style="font-family: arial, sans-serif;"&gt;The Indiana Department of Transportation plans to route eastbound I-70&amp;rsquo;s left lane (passing lane) on the south side of the roadway&amp;mdash;via a median crossover&amp;mdash;to the inside &amp;ldquo;westbound&amp;rdquo; lane on the north side of the roadway.&amp;nbsp; Eastbound I-70 right-lane traffic will continue in its current pattern.&amp;nbsp; &lt;/span&gt;&lt;/p&gt;
&lt;p style="margin: 0in 17.1pt 0pt 0in;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="margin: 0in 17.1pt 0pt 0in;"&gt;&lt;span style="font-family: arial, sans-serif;"&gt;&lt;br /&gt;
Trucks will be prohibited from using the eastbound I-70 passing lane through this 4-mile section of construction zone.&amp;nbsp; Meanwhile, a 13-foot width restriction and a reduction in speed limit to 55 mph will be enforced. &lt;/span&gt;&lt;/p&gt;
&lt;p style="margin: 0in 17.1pt 0pt 0in;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="margin: 0in 17.1pt 0pt 0in;"&gt;&lt;span style="font-family: arial, sans-serif;"&gt;&lt;br /&gt;
Milestone, the state&amp;rsquo;s contractor for this $15.2 million I-70 Major Moves reconstruction project from Mt. Comfort Road to State Road 9, will place concrete barriers at 9 p.m. Monday at crossovers and along the inside north-side lane separating bi-directional traffic.&amp;nbsp;&amp;nbsp; &lt;/span&gt;&lt;/p&gt;
&lt;p style="margin: 0in 17.1pt 0pt 0in;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="margin: 0in 17.1pt 0pt 0in;"&gt;&lt;span style="font-family: arial, sans-serif;"&gt;&lt;br /&gt;
The 8.5 mile I-70 project is replacing concrete pavement in eastbound lanes&amp;mdash;with repairs and resurfacing in the eastbound asphalt section.&amp;nbsp; Westbound I-70&amp;rsquo;s concrete section is being extensively patched&amp;mdash;with the asphalt section repaired and resurfaced.&amp;nbsp; In addition, the Sugar Creek bridge is being widened and the westbound on-ramp at S.R. 9 lengthened.&lt;/span&gt;&lt;/p&gt;
&lt;p style="margin: 0in 17.1pt 0pt 0in;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="text-align: center; margin: 0in 17.1pt 0pt 0in;"&gt;&lt;b&gt;&lt;span style="font-family: arial, sans-serif;"&gt;&lt;br /&gt;
Guardrail Repair Monday Night&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="margin: 0in 17.1pt 0pt 0in;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="margin: 0in 17.1pt 0pt 0in;"&gt;&lt;span style="font-family: arial, sans-serif;"&gt;The state&amp;rsquo;s contractor will coordinate Monday night&amp;rsquo;s work to include repair of a guardrail at the 100.4 mile marker along westbound I-70.&amp;nbsp; Those repairs should be complete by 6 a.m. Tuesday.&lt;/span&gt;&lt;/p&gt;
&lt;p style="margin: 0in 17.1pt 0pt 0in;"&gt;&amp;nbsp;&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[GREENFIELD, Ind.A change in the traffic pattern on Interstate 70 will take place Monday night (JUNE 17) in Hancock County between mile markers 96.8 and 100.6. 


 
The Indiana Department of Transportation plans to route eastbound I-70s left lane (passing lane) on the south side of the roadwayvia a median crossoverto the inside westbound lane on the north side of the roadway.  Eastbound I-70 right-lane traffic will continue in its current pattern.  
 

Trucks will be prohibited from using the eastbound I-70 passing lane through this 4-mile section of construction zone.  Meanwhile, a 13-foot width restriction and a reduction in speed limit to 55 mph will be enforced. 
 

Milestone, the states contractor for this $15.2 million I-70 Major Moves reconstruction project from Mt. Comfort Road to State Road 9, will place concrete barriers at 9 p.m. Monday at crossovers and along the inside north-side lane separating bi-directional traffic.   
 

The 8.5 mile I-70 project is replacing concrete pavement in eastbound laneswith repairs and resurfacing in the eastbound asphalt section.  Westbound I-70s concrete section is being extensively patchedwith the asphalt section repaired and resurfaced.  In addition, the Sugar Creek bridge is being widened and the westbound on-ramp at S.R. 9 lengthened.
 

Guardrail Repair Monday Night
 
The states contractor will coordinate Monday nights work to include repair of a guardrail at the 100.4 mile marker along westbound I-70.  Those repairs should be complete by 6 a.m. Tuesday.
 ]]></description>
      <pubDate>Fri, 14 Jun 2013 21:00:00 GMT</pubDate>
      <category>06/14/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT - Northeast] SR 14 Closure Scheduled in Silver Lake for Friday and Saturday, June 14 and 15 (6/14/2013 - 6/16/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105825&amp;information_id=182993&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/14/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;3:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/16/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;1:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;br /&gt;Kosciusko County&lt;br /&gt;&lt;br /&gt;&lt;strong&gt;SILVER LAKE, Ind.&lt;/strong&gt; &amp;ndash; The Indiana Department of Transportation (INDOT) announces that SR 14 (Main Street) in Silver Lake will close on Friday, June 14, at 3 p.m. for Silver Lake Days festival. The closure is between SR 15 (Jefferson Street) and Harrison Street. The detour is CR 200W to CR 1200S to CR 450W. An alternate detour is CR 450W to CR 950S to CR 200W. The road will re-open by 1 a.m. on Sunday, June 16. &lt;br /&gt;
&lt;br /&gt;
INDOT wants all drivers, event participants and their families to stay safe on the roads. It is important that drivers plan for additional time, maintain a safe speed and be alert for changing road conditions during festival season. Always buckle up, never drive impaired, drive defensively, drive attentively, and share the road. To check highway conditions before departing, visit &lt;a href="http://www.TrafficWise.in.gov "&gt;www.TrafficWise.in.gov &lt;/a&gt;or &lt;a href="http://www.indot.in.gov "&gt;www.indot.in.gov &lt;/a&gt;for links to the latest INDOT news and information. &lt;br /&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[SILVER LAKE, Ind.  The Indiana Department of Transportation (INDOT) announces that SR 14 (Main Street) in Silver Lake will close on Friday, June 14, at 3 p.m. for Silver Lake Days festival. The closure is between SR 15 (Jefferson Street) and Harrison Street. The detour is CR 200W to CR 1200S to CR 450W. An alternate detour is CR 450W to CR 950S to CR 200W. The road will re-open by 1 a.m. on Sunday, June 16. 

INDOT wants all drivers, event participants and their families to stay safe on the roads. It is important that drivers plan for additional time, maintain a safe speed and be alert for changing road conditions during festival season. Always buckle up, never drive impaired, drive defensively, drive attentively, and share the road. To check highway conditions before departing, visit www.TrafficWise.in.gov or www.indot.in.gov for links to the latest INDOT news and information. ]]></description>
      <pubDate>Fri, 14 Jun 2013 19:00:00 GMT</pubDate>
      <category>06/14/2013</category>
    </item>
    <item>
      <title><![CDATA[S.R. 244/Rush County Closure July 8 For Culvert (6/14/2013 - 6/15/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105635&amp;information_id=182961&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/14/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;8:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/15/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;8:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;p&gt;&lt;span style="font-family: arial, sans-serif;"&gt;RUSH COUNTY, Ind.&amp;mdash;The Indiana Department of Transportation plans to remove and replace a culvert along State Road 244 at Mill Creek near C.R. 750 West&amp;mdash;six miles east of Interstate 74 in southwestern Rush County.&amp;nbsp; There will be a 50-day closure of the east-west highway.&lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p&gt;&lt;span style="font-family: arial, sans-serif;"&gt;State officials met this morning with Beaty Construction, INDOT&amp;rsquo;s contractor for this $348,860 Greenfield District bridge project, to discuss construction details and determine a timetable for meeting the contract&amp;rsquo;s completion date of November 1.&lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p&gt;&lt;span style="font-family: arial, sans-serif;"&gt;INDOT will close S.R. 244 on or after July 8.&amp;nbsp; Beaty Construction will place barricades at C.R. 750W and 725W.&amp;nbsp; Then, a new 4-sided pre-cast concrete drainage structure will be put in place&amp;mdash;measuring 18 X 130 feet.&lt;/span&gt;&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[RUSH COUNTY, Ind.The Indiana Department of Transportation plans to remove and replace a culvert along State Road 244 at Mill Creek near C.R. 750 Westsix miles east of Interstate 74 in southwestern Rush County.  There will be a 50-day closure of the east-west highway.
 
State officials met this morning with Beaty Construction, INDOTs contractor for this $348,860 Greenfield District bridge project, to discuss construction details and determine a timetable for meeting the contracts completion date of November 1.
 
INDOT will close S.R. 244 on or after July 8.  Beaty Construction will place barricades at C.R. 750W and 725W.  Then, a new 4-sided pre-cast concrete drainage structure will be put in placemeasuring 18 X 130 feet.]]></description>
      <pubDate>Fri, 14 Jun 2013 12:00:00 GMT</pubDate>
      <category>06/14/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT- Southwest] U.S. 231 Resurfacing Begins in Martin County (6/14/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105871&amp;information_id=183013&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/14/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;12:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/14/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;11:59 PM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;p style="text-align: center; line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-size: 16pt;"&gt;U.S. 231 Resurfacing Begins in Martin County&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="text-align: center; line-height: 115%;"&gt;&lt;i&gt;&lt;span style="line-height: 115%; font-size: 14pt;"&gt;Motorists should anticipate delays&lt;/span&gt;&lt;/i&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;MARTIN COUNTY, Ind. &amp;ndash; Pavement patching and resurfacing work has begun on 12 miles of U.S. 231 between U.S. 50/150 at Loogootee and State Road 58. Motorists should stay alert and expect brief delays where they encounter moving milling and paving operations.&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;Dave O&amp;rsquo;Mara Contractor of North Vernon is performing the work for the Indiana Department of Transportation (INDOT) as part of a $1.9 million contract, which is scheduled for completion by October.&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;INDOT reminds motorists to follow the posted work zone speed limit, use caution and consider worker safety when traveling through a work zone.&amp;nbsp; For the latest news and information about INDOT, please visit &lt;a href="http://www.in.gov/indot" title="http://www.in.gov/indot"&gt;&lt;span style="color: #800080;"&gt;www.in.gov/indot&lt;/span&gt;&lt;/a&gt; or &lt;a href="http://www.trafficwise.in.gov/"&gt;www.trafficwise.in.gov&lt;/a&gt; . &lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[U.S. 231 Resurfacing Begins in Martin County
Motorists should anticipate delays
 
MARTIN COUNTY, Ind.  Pavement patching and resurfacing work has begun on 12 miles of U.S. 231 between U.S. 50/150 at Loogootee and State Road 58. Motorists should stay alert and expect brief delays where they encounter moving milling and paving operations.
 
Dave OMara Contractor of North Vernon is performing the work for the Indiana Department of Transportation (INDOT) as part of a $1.9 million contract, which is scheduled for completion by October.
 
INDOT reminds motorists to follow the posted work zone speed limit, use caution and consider worker safety when traveling through a work zone.  For the latest news and information about INDOT, please visit www.in.gov/indot or www.trafficwise.in.gov . ]]></description>
      <pubDate>Fri, 14 Jun 2013 04:00:01 GMT</pubDate>
      <category>06/14/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT - Northeast] Lane Restrictions Shift on Southbound I-469 (6/14/2013 - 6/17/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105830&amp;information_id=182995&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/14/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;All Day&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/17/2013&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;br /&gt;Allen County&lt;br /&gt;&lt;br /&gt;&lt;strong&gt;ALLEN COUNTY, Ind.&lt;/strong&gt; &amp;ndash; The Indiana Department of Transportation (INDOT) announces updates to the lane restrictions on southbound I-469, between Exit 29 (Maplecrest Road) and Exit 15 (Tillman Road), for concrete restoration work. &lt;br /&gt;
&lt;br /&gt;
The southbound left lane restriction between Exit 29 and Exit 21 (US 24) will end by 5 p.m. on Friday, June 14. All work in this area will be complete at that time. &lt;br /&gt;
&lt;br /&gt;
The right lane restriction on southbound I-469 between Exit 21 and Exit 15 (Tillman Road) will continue until approximately June 28, weather permitting. &lt;br /&gt;
&lt;br /&gt;
The speed limit along southbound I-469 is reduced to 60 mph in work zones, with temporary speed limits of 45 mph imposed when workers are present, from 8 a.m. to 5 p.m. daily. Arrow boards, cones and barrels will direct traffic as needed while the work is in progress. &lt;br /&gt;
&lt;br /&gt;
INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone. For the latest news and information about INDOT, visit &lt;a href="http://www.in.gov/indot"&gt;www.in.gov/indot&lt;/a&gt;. You can find traffic restriction information at &lt;a href="http://www.trafficwise.IN.gov"&gt;www.trafficwise.IN.gov&lt;/a&gt;. Contact the Fort Wayne District toll free at 866-227-3555. &lt;br /&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[ALLEN COUNTY, Ind.  The Indiana Department of Transportation (INDOT) announces updates to the lane restrictions on southbound I-469, between Exit 29 (Maplecrest Road) and Exit 15 (Tillman Road), for concrete restoration work. 

The southbound left lane restriction between Exit 29 and Exit 21 (US 24) will end by 5 p.m. on Friday, June 14. All work in this area will be complete at that time. 

The right lane restriction on southbound I-469 between Exit 21 and Exit 15 (Tillman Road) will continue until approximately June 28, weather permitting. 

The speed limit along southbound I-469 is reduced to 60 mph in work zones, with temporary speed limits of 45 mph imposed when workers are present, from 8 a.m. to 5 p.m. daily. Arrow boards, cones and barrels will direct traffic as needed while the work is in progress. 

INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone. For the latest news and information about INDOT, visit www.in.gov/indot. You can find traffic restriction information at www.trafficwise.IN.gov. Contact the Fort Wayne District toll free at 866-227-3555. ]]></description>
      <pubDate>Fri, 14 Jun 2013 04:00:00 GMT</pubDate>
      <category>06/14/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT - Northeast] Nightly Rolling Slowdowns on I-69 near Mile 304 Are Scheduled to Begin Sunday, June 16 (6/14/2013 - 6/20/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105831&amp;information_id=182997&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/14/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;All Day&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/20/2013&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;br /&gt;Allen County&lt;br /&gt;&lt;br /&gt;&lt;strong&gt;ALLEN COUNTY, Ind.&lt;/strong&gt; &amp;ndash; The Indiana Department of Transportation (INDOT) announces rolling slowdowns of traffic on southbound I-69 will take place during nighttime hours next week, between 9 p.m. and 5 a.m., beginning Sunday night, June 16, near mile 304. The slowdowns are to accommodate the placement of bridge beams on the Covington Road Bridge over I-69 at this location. Later in the week, northbound I-69 will experience rolling slowdowns in this area, as well. &lt;br /&gt;
&lt;br /&gt;
On Sunday night, June 16, after 9 p.m., traffic on southbound I-69 will be intermittently slowed to 10 mph as beams are placed on the bridge. The Allen County Sheriff&amp;rsquo;s Department will assist with the rolling slowdowns, which may last up to 20 minutes each. Work is expected to take place over the southbound lanes up to, and possibly including, Tuesday night, June 18, weather permitting. &lt;br /&gt;
&lt;br /&gt;
Beginning Tuesday night, June 18, or Wednesday night, June 19, work on the bridge will shift to take place over the northbound I-69 lanes. At this time, the rolling slowdowns will occur for northbound I-69 traffic. All slowdowns will be completed by 5 a.m. each morning. The bridge beam placement work is expected to be complete by 5 a.m. on Friday morning, June 21, weather permitting. &lt;br /&gt;
&lt;br /&gt;
Motorists may wish to select alternate routes and/or plan accordingly for possible traffic delays on I-69. &lt;br /&gt;
&lt;br /&gt;
The Covington Road bridge work includes bridge deck replacement and widening. The work entails removing the existing deck and railing down to the bridge beams; constructing wider bridge piers in the median of I-69 and along the outside shoulders of northbound and southbound I-69; and installing additional new bridge beams for a wider deck. The wider deck will allow for wider shoulders and additional width to accommodate the proposed Covington Road Trail, crossing over I-69. The adjacent portion of Covington Road work is part of the bridge contract. It will involve improvements at the Covington Road / Dicke Road intersection, including the installation of a new traffic signal. &lt;br /&gt;
&lt;br /&gt;
The project was awarded to Primco based on the low bid of $2.4 million. The entire project is scheduled to be complete in the late fall of 2013. &lt;br /&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[ALLEN COUNTY, Ind.  The Indiana Department of Transportation (INDOT) announces rolling slowdowns of traffic on southbound I-69 will take place during nighttime hours next week, between 9 p.m. and 5 a.m., beginning Sunday night, June 16, near mile 304. The slowdowns are to accommodate the placement of bridge beams on the Covington Road Bridge over I-69 at this location. Later in the week, northbound I-69 will experience rolling slowdowns in this area, as well. 

On Sunday night, June 16, after 9 p.m., traffic on southbound I-69 will be intermittently slowed to 10 mph as beams are placed on the bridge. The Allen County Sheriffs Department will assist with the rolling slowdowns, which may last up to 20 minutes each. Work is expected to take place over the southbound lanes up to, and possibly including, Tuesday night, June 18, weather permitting. 

Beginning Tuesday night, June 18, or Wednesday night, June 19, work on the bridge will shift to take place over the northbound I-69 lanes. At this time, the rolling slowdowns will occur for northbound I-69 traffic. All slowdowns will be completed by 5 a.m. each morning. The bridge beam placement work is expected to be complete by 5 a.m. on Friday morning, June 21, weather permitting. 

Motorists may wish to select alternate routes and/or plan accordingly for possible traffic delays on I-69. 

The Covington Road bridge work includes bridge deck replacement and widening. The work entails removing the existing deck and railing down to the bridge beams; constructing wider bridge piers in the median of I-69 and along the outside shoulders of northbound and southbound I-69; and installing additional new bridge beams for a wider deck. The wider deck will allow for wider shoulders and additional width to accommodate the proposed Covington Road Trail, crossing over I-69. The adjacent portion of Covington Road work is part of the bridge contract. It will involve improvements at the Covington Road / Dicke Road intersection, including the installation of a new traffic signal. 

The project was awarded to Primco based on the low bid of $2.4 million. The entire project is scheduled to be complete in the late fall of 2013. ]]></description>
      <pubDate>Fri, 14 Jun 2013 04:00:00 GMT</pubDate>
      <category>06/14/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT - Northeast] SR 105 Scheduled for Three-Day Closure Followed by Bridge Work (6/14/2013 - 6/21/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105833&amp;information_id=183001&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/14/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;All Day&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/21/2013&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;br /&gt;Huntington County&lt;br /&gt;&lt;br /&gt;&lt;strong&gt;HUNTINGTON COUNTY, Ind.&lt;/strong&gt; &amp;ndash; The Indiana Department of Transportation (INDOT) announces that SR 105, between W. Chapel Road (CR 500S) and CR 250S in Huntington County, is scheduled to close at 8 a.m. on Monday, June 17, until 4 p.m., Wednesday, June 19, weather permitting. The closure is due to small culvert replacements in two locations. &lt;br /&gt;
&lt;br /&gt;
The detour is SR 124 to SR 9 to US 24. &lt;br /&gt;
&lt;br /&gt;
After the road reopens, there will be intermittent restrictions on SR 105 on the Salamonie River Bridge, beginning on Wednesday, June 19, weather permitting. Motorists should be aware of traffic controls including barrels, cones, arrow boards and flaggers while the work is in progress. The work is expected to be complete by the middle of July, weather permitting. &lt;br /&gt;
&lt;br /&gt;
INDOT will be performing proactive bridge maintenance work over the Salamonie River. The work is part of a multi-location bridge maintenance contract, with work taking place in upcoming months throughout the INDOT Fort Wayne District. The contract was awarded to R. L. McCoy, based on the low bid of $627,000. &lt;br /&gt;
&lt;br /&gt;
INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone. For the latest news and information about INDOT, visit &lt;a href="http://www.in.gov/indot"&gt;www.in.gov/indot&lt;/a&gt;. You can find traffic restriction information at &lt;a href="http://www.trafficwise.IN.gov"&gt;www.trafficwise.IN.gov&lt;/a&gt;. Contact the Fort Wayne District toll free at 866-227-3555. &lt;br /&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[HUNTINGTON COUNTY, Ind.  The Indiana Department of Transportation (INDOT) announces that SR 105, between W. Chapel Road (CR 500S) and CR 250S in Huntington County, is scheduled to close at 8 a.m. on Monday, June 17, until 4 p.m., Wednesday, June 19, weather permitting. The closure is due to small culvert replacements in two locations. 

The detour is SR 124 to SR 9 to US 24. 

After the road reopens, there will be intermittent restrictions on SR 105 on the Salamonie River Bridge, beginning on Wednesday, June 19, weather permitting. Motorists should be aware of traffic controls including barrels, cones, arrow boards and flaggers while the work is in progress. The work is expected to be complete by the middle of July, weather permitting. 

INDOT will be performing proactive bridge maintenance work over the Salamonie River. The work is part of a multi-location bridge maintenance contract, with work taking place in upcoming months throughout the INDOT Fort Wayne District. The contract was awarded to R. L. McCoy, based on the low bid of $627,000. 

INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone. For the latest news and information about INDOT, visit www.in.gov/indot. You can find traffic restriction information at www.trafficwise.IN.gov. Contact the Fort Wayne District toll free at 866-227-3555. ]]></description>
      <pubDate>Fri, 14 Jun 2013 04:00:00 GMT</pubDate>
      <category>06/14/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT - Northeast] SR 13 Will Close to Thru Traffic in Wabash Beginning Monday, June 17 (6/14/2013 - 6/21/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105832&amp;information_id=182999&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/14/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;All Day&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/21/2013&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;br /&gt;Wabash County&lt;br /&gt;&lt;br /&gt;&lt;strong&gt;WABASH, Ind.&lt;/strong&gt; &amp;ndash; The Indiana Department of Transportation (INDOT) announces that SR 13, between the N. Wabash Street/Stitt Street intersection and US 24, will close to thru traffic beginning Monday, June 17, under permit by INDOT. The closure is due to sanitary sewer construction. Local traffic will be allowed. &lt;br /&gt;
&lt;br /&gt;
The detour is SR 15 to US 24 to SR 13. The road is expected to reopen to thru traffic by end of the day on Friday, June 21, weather permitting. &lt;br /&gt;
&lt;br /&gt;
INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone. For the latest news and information about INDOT, visit &lt;a href="http://www.in.gov/indot"&gt;www.in.gov/indot&lt;/a&gt;. You can find traffic restriction information at &lt;a href="http://www.trafficwise.IN.gov"&gt;www.trafficwise.IN.gov&lt;/a&gt;. Contact the Fort Wayne District toll free at 866-227-3555. &lt;br /&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[WABASH, Ind.  The Indiana Department of Transportation (INDOT) announces that SR 13, between the N. Wabash Street/Stitt Street intersection and US 24, will close to thru traffic beginning Monday, June 17, under permit by INDOT. The closure is due to sanitary sewer construction. Local traffic will be allowed. 

The detour is SR 15 to US 24 to SR 13. The road is expected to reopen to thru traffic by end of the day on Friday, June 21, weather permitting. 

INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone. For the latest news and information about INDOT, visit www.in.gov/indot. You can find traffic restriction information at www.trafficwise.IN.gov. Contact the Fort Wayne District toll free at 866-227-3555. ]]></description>
      <pubDate>Fri, 14 Jun 2013 04:00:00 GMT</pubDate>
      <category>06/14/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT - Northeast] SR 19 South of Etna Green Scheduled for Closure on Monday, June 17 (6/14/2013 - 6/21/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105834&amp;information_id=183003&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/14/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;All Day&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/21/2013&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;br /&gt;Kosciusko County&lt;br /&gt;&lt;br /&gt;Marshall County&lt;br /&gt;&lt;br /&gt;&lt;strong&gt;KOSCIUSKO COUNTY, Ind.&lt;/strong&gt; &amp;ndash; The Indiana Department of Transportation (INDOT) announces that SR 19 is scheduled to be closed beginning Monday, June 17, weather permitting, to accommodate replacement and widening of the bridge deck over the Tippecanoe River, between CR 75N and SR 10, approximately 2 miles south of Etna Green. &lt;br /&gt;
&lt;br /&gt;
The official detour is from SR 25 to SR 331 to SR 10. &lt;br /&gt;
&lt;br /&gt;
Work is scheduled to be complete by the beginning of November. The contract for the project was awarded to Anlaan, based on the low bid of $1 million. &lt;br /&gt;
&lt;br /&gt;
INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone. For the latest news and information about INDOT, visit &lt;a href="http://www.in.gov/indot"&gt;www.in.gov/indot&lt;/a&gt;. You can find traffic restriction information at &lt;a href="http://www.trafficwise.IN.gov"&gt;www.trafficwise.IN.gov&lt;/a&gt;. Contact the Fort Wayne District toll free at 866-227-3555. &lt;br /&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[KOSCIUSKO COUNTY, Ind.  The Indiana Department of Transportation (INDOT) announces that SR 19 is scheduled to be closed beginning Monday, June 17, weather permitting, to accommodate replacement and widening of the bridge deck over the Tippecanoe River, between CR 75N and SR 10, approximately 2 miles south of Etna Green. 

The official detour is from SR 25 to SR 331 to SR 10. 

Work is scheduled to be complete by the beginning of November. The contract for the project was awarded to Anlaan, based on the low bid of $1 million. 

INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone. For the latest news and information about INDOT, visit www.in.gov/indot. You can find traffic restriction information at www.trafficwise.IN.gov. Contact the Fort Wayne District toll free at 866-227-3555. ]]></description>
      <pubDate>Fri, 14 Jun 2013 04:00:00 GMT</pubDate>
      <category>06/14/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT - East Central] US 31 Hamilton County Restrictions (6/13/2013 - 6/14/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105589&amp;information_id=182928&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/13/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;9:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/14/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;p style="text-align: center; line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;U.S. 31 Ramp to Keystone&lt;br /&gt;
&lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;Closes Tomorrow Night&lt;br /&gt;
&lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;For Weekend Repairs&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;HAMILTON COUNTY&lt;/span&gt;&lt;/b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt; &amp;ndash; The Indiana Department of Transportation (INDOT) has requested contractors temporarily close the southbound U.S. 31 ramp to Keystone Parkway in order to replace sections of concrete pavement not meeting INDOT quality standards.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;The ramp is scheduled to close tomorrow (Friday, June 14) at 9 p.m. and is expected to reopen before Monday, June 17 at 6 a.m. This schedule will be postponed in the event of inclement weather. &lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;INDOT and Walsh Construction, the state&amp;rsquo;s contractor for the $35 million U.S. 31 Hamilton County project, over the past few weeks have been repairing areas of concrete where premature surface cracking was identified. The ramp repairs are the final areas identified as requiring concrete replacement. &lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="text-align: center; line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;Lane Restriction Tonight to Set Bridge Beams&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;The right lane of southbound U.S. 31 will be restricted between 156&lt;sup&gt;th&lt;/sup&gt; Street and Union Street tonight beginning at 9 p.m. as contractors place beams at the bridge over Cool Creek. The lane is expected to reopen by 6 a.m.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Information about The New U.S. 31 Hamilton County and details about how to receive project updates can be found online at &lt;a href="http://us31hamiltoncounty.in.gov/"&gt;us31hamiltoncounty.in.gov&lt;/a&gt;. For regular INDOT news, information and updates, follow &lt;a href="http://www.twitter.com/INDOT_ECentral"&gt;@INDOT_ECentral&lt;/a&gt; on Twitter and like &lt;a href="http://www.facebook.com/INDOTEastCentral"&gt;Indiana Department of Transportation: East Central&lt;/a&gt; on Facebook.&lt;/span&gt;&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[U.S. 31 Ramp to Keystone
Closes Tomorrow Night
For Weekend Repairs

HAMILTON COUNTY  The Indiana Department of Transportation (INDOT) has requested contractors temporarily close the southbound U.S. 31 ramp to Keystone Parkway in order to replace sections of concrete pavement not meeting INDOT quality standards.
 
The ramp is scheduled to close tomorrow (Friday, June 14) at 9 p.m. and is expected to reopen before Monday, June 17 at 6 a.m. This schedule will be postponed in the event of inclement weather. 
 
INDOT and Walsh Construction, the states contractor for the $35 million U.S. 31 Hamilton County project, over the past few weeks have been repairing areas of concrete where premature surface cracking was identified. The ramp repairs are the final areas identified as requiring concrete replacement. 
 
Lane Restriction Tonight to Set Bridge Beams

The right lane of southbound U.S. 31 will be restricted between 156th Street and Union Street tonight beginning at 9 p.m. as contractors place beams at the bridge over Cool Creek. The lane is expected to reopen by 6 a.m.
 
Information about The New U.S. 31 Hamilton County and details about how to receive project updates can be found online at us31hamiltoncounty.in.gov. For regular INDOT news, information and updates, follow @INDOT_ECentral on Twitter and like Indiana Department of Transportation: East Central on Facebook.]]></description>
      <pubDate>Fri, 14 Jun 2013 01:00:00 GMT</pubDate>
      <category>06/13/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT - Northeast] I-69 Nighttime Lane Restrictions in Southwest Fort Wayne (6/13/2013 - 6/18/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105824&amp;information_id=182991&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/13/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;9:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/18/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;5:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;br /&gt;Allen County&lt;br /&gt;&lt;br /&gt;&lt;strong&gt;ALLEN COUNTY, Ind.&lt;/strong&gt; &amp;ndash; The Indiana Department of Transportation (INDOT) announces that due to inclement weather on Wednesday night, June 12, nighttime restrictions on I-69 for bridge maintenance have been rescheduled to begin Thursday evening, June 13. &lt;br /&gt;
&lt;br /&gt;
I-69 will be intermittently restricted during nighttime hours between Exit 302 (US 24) and Exit 309 (US 30/US 33), starting Thursday, June 13, weather permitting. INDOT will be performing proactive maintenance work on the bridges over the Norfolk Southern Railroad and CSX Railroad just north of Exit 305 (SR 14), as well as on the bridge over US 24, at Exit 302. &lt;br /&gt;
&lt;br /&gt;
On Thursday evening, June 13, beginning at 9 p.m., northbound I-69 is scheduled for restriction starting &amp;frac12; mile north of Exit 305. On-ramp lane traffic from westbound SR 14 to northbound I-69 will use the shoulder until merging with I-69 traffic north of the bridge over the CSX Railroad. There is a 12-foot width limit in this lane. Northbound I-69 thru traffic will use the far left lane during this restriction. A mandatory 45 mph speed limit will be in force. The work is expected to be complete by 6 a.m. on Friday, June 14, weather permitting. &lt;br /&gt;
&lt;br /&gt;
On Friday evening, June 14, beginning at 9 p.m., southbound I-69 will be intermittently restricted north of Exit 305. Speed restrictions of 45 mph will be in force. The work is expected to be complete by 6 a.m. on Saturday, June 15, weather permitting. &lt;br /&gt;
&lt;br /&gt;
On Monday evening, June 17, beginning at 9 p.m., I-69 in both directions will have intermittent lane restrictions at Exit 302, on the bridge over US 24. Speed restrictions of 45 mph will be in force. The work is expected to be complete by 6 a.m. on Tuesday, June 18, weather permitting. &lt;br /&gt;
&lt;br /&gt;
Motorists should be aware of traffic controls including barrels, cones and arrow boards while the work is in progress. &lt;br /&gt;
&lt;br /&gt;
INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone. For the latest news and information about INDOT, visit www.in.gov/indot. You can find traffic restriction information at www.trafficwise.IN.gov. Contact the Fort Wayne District toll free at 866-227-3555. &lt;br /&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[ALLEN COUNTY, Ind.  The Indiana Department of Transportation (INDOT) announces that due to inclement weather on Wednesday night, June 12, nighttime restrictions on I-69 for bridge maintenance have been rescheduled to begin Thursday evening, June 13. 

I-69 will be intermittently restricted during nighttime hours between Exit 302 (US 24) and Exit 309 (US 30/US 33), starting Thursday, June 13, weather permitting. INDOT will be performing proactive maintenance work on the bridges over the Norfolk Southern Railroad and CSX Railroad just north of Exit 305 (SR 14), as well as on the bridge over US 24, at Exit 302. 

On Thursday evening, June 13, beginning at 9 p.m., northbound I-69 is scheduled for restriction starting  mile north of Exit 305. On-ramp lane traffic from westbound SR 14 to northbound I-69 will use the shoulder until merging with I-69 traffic north of the bridge over the CSX Railroad. There is a 12-foot width limit in this lane. Northbound I-69 thru traffic will use the far left lane during this restriction. A mandatory 45 mph speed limit will be in force. The work is expected to be complete by 6 a.m. on Friday, June 14, weather permitting. 

On Friday evening, June 14, beginning at 9 p.m., southbound I-69 will be intermittently restricted north of Exit 305. Speed restrictions of 45 mph will be in force. The work is expected to be complete by 6 a.m. on Saturday, June 15, weather permitting. 

On Monday evening, June 17, beginning at 9 p.m., I-69 in both directions will have intermittent lane restrictions at Exit 302, on the bridge over US 24. Speed restrictions of 45 mph will be in force. The work is expected to be complete by 6 a.m. on Tuesday, June 18, weather permitting. 

Motorists should be aware of traffic controls including barrels, cones and arrow boards while the work is in progress. 

INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone. For the latest news and information about INDOT, visit www.in.gov/indot. You can find traffic restriction information at www.trafficwise.IN.gov. Contact the Fort Wayne District toll free at 866-227-3555. ]]></description>
      <pubDate>Fri, 14 Jun 2013 01:00:00 GMT</pubDate>
      <category>06/13/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT - East Central] Operation Indy Commute I-69 Lane Restrictions (6/13/2013 - 6/14/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=104933&amp;information_id=182744&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/13/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;8:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/14/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;p style="text-align: center; line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;Contractors Removing Shoulder, &lt;br /&gt;
&lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;Beginning Subgrade Treatment &lt;br /&gt;
&lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;For Added Travel Lane on I-69&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;FISHERS, Ind.&lt;/span&gt;&lt;/b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt; &amp;ndash; Indiana Department of Transportation (INDOT) contractors are planning overnight lane restrictions this week as part of Operation Indy Commute &amp;ndash; I-69.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Rieth-Riley Construction, the INDOT contractor for the $11 million added travel lanes project, plans to remove shoulder pavement tonight, Tuesday and Wednesday nights along the southbound median of I-69. The milling will require a northbound left lane restriction between 96&lt;sup&gt;th&lt;/sup&gt; Street (Exit 203) and 116&lt;sup&gt;th&lt;/sup&gt; Street (Exit 205) beginning at 8 p.m. and ending by 6 a.m.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Contractors are also planning southbound left lane restrictions between 116&lt;sup&gt;th&lt;/sup&gt; Street and 96&lt;sup&gt;th&lt;/sup&gt; Street to begin subgrade treatment on Thursday and Friday nights from 8 p.m. to 6 a.m. &lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Rieth-Riley is removing the median shoulder of southbound I-69 to construct an added travel lane between 116&lt;sup&gt;th&lt;/sup&gt; Street and I-465. Auxiliary lanes will be built to connect northbound and southbound interchange ramps between 116&lt;sup&gt;th&lt;/sup&gt;, 96&lt;sup&gt;th&lt;/sup&gt; and 82&lt;sup&gt;nd&lt;/sup&gt; streets. All improvements are expected to be complete by the end of this year.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;For more information about Operation Indy Commute &amp;ndash; I-69, and to sign up to receive updates throughout the project, visit &lt;a href="http://www.indycommute.indot.in.gov/"&gt;www.IndyCommute.indot.in.gov&lt;/a&gt;. For construction updates, photos and more via social media, &amp;ldquo;like&amp;rdquo; the &lt;a href="http://www.facebook.com/INDOTEastCentral"&gt;Indiana Department of Transportation:&amp;nbsp; East Central&lt;/a&gt; Facebook page and follow &lt;a href="http://www.twitter.com/INDOT_ECentral"&gt;@INDOT_ECentral&lt;/a&gt; on Twitter. &lt;/span&gt;&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[Contractors Removing Shoulder, 
Beginning Subgrade Treatment 
For Added Travel Lane on I-69
FISHERS, Ind.  Indiana Department of Transportation (INDOT) contractors are planning overnight lane restrictions this week as part of Operation Indy Commute  I-69.
Rieth-Riley Construction, the INDOT contractor for the $11 million added travel lanes project, plans to remove shoulder pavement tonight, Tuesday and Wednesday nights along the southbound median of I-69. The milling will require a northbound left lane restriction between 96th Street (Exit 203) and 116th Street (Exit 205) beginning at 8 p.m. and ending by 6 a.m.
Contractors are also planning southbound left lane restrictions between 116th Street and 96th Street to begin subgrade treatment on Thursday and Friday nights from 8 p.m. to 6 a.m. 
Rieth-Riley is removing the median shoulder of southbound I-69 to construct an added travel lane between 116th Street and I-465. Auxiliary lanes will be built to connect northbound and southbound interchange ramps between 116th, 96th and 82nd streets. All improvements are expected to be complete by the end of this year.
For more information about Operation Indy Commute  I-69, and to sign up to receive updates throughout the project, visit www.IndyCommute.indot.in.gov. For construction updates, photos and more via social media, like the Indiana Department of Transportation:  East Central Facebook page and follow @INDOT_ECentral on Twitter. ]]></description>
      <pubDate>Fri, 14 Jun 2013 00:00:00 GMT</pubDate>
      <category>06/13/2013</category>
    </item>
    <item>
      <title><![CDATA[S.R. 144 Traffic Switch MONDAY At Kitchen Road (Johnson CO) (6/13/2013 - 6/14/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105644&amp;information_id=182971&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/13/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;7:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/14/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;7:55 PM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;p&gt;&lt;span style="font-family: arial, sans-serif;"&gt;MOORESVILLE, Ind.&amp;mdash;The Indiana Department of Transportation plans to switch traffic to new pavement on the south side of State Road 144 this Monday at Kitchen Road&amp;rsquo;s $1.9 million intersection improvement project.&amp;nbsp; The traffic switch indicates construction crews will now focus on building the north half of the roundabout.&lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&lt;span style="font-family: arial, sans-serif;"&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&lt;span style="font-family: arial, sans-serif;"&gt;Work on the north half requires closing Kitchen Road from the north.&amp;nbsp; Kitchen Road&amp;rsquo;s south approach will remain closed.&lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p&gt;&lt;span style="font-family: arial, sans-serif;"&gt;Orchard Road&amp;mdash;in a new alignment with S.R. 144&amp;mdash;will reopen to traffic.&amp;nbsp; &lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p&gt;&lt;span style="font-family: arial, sans-serif;"&gt;Police patrols have been asked to enforce the 10-foot width restriction through the construction zone.&amp;nbsp; A 35 mph speed limit is also in place for the safety of construction workers and the motoring public.&amp;nbsp; &lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[MOORESVILLE, Ind.The Indiana Department of Transportation plans to switch traffic to new pavement on the south side of State Road 144 this Monday at Kitchen Roads $1.9 million intersection improvement project.  The traffic switch indicates construction crews will now focus on building the north half of the roundabout.
 
Work on the north half requires closing Kitchen Road from the north.  Kitchen Roads south approach will remain closed.
 
Orchard Roadin a new alignment with S.R. 144will reopen to traffic.  
 
Police patrols have been asked to enforce the 10-foot width restriction through the construction zone.  A 35 mph speed limit is also in place for the safety of construction workers and the motoring public.  
 ]]></description>
      <pubDate>Thu, 13 Jun 2013 23:00:00 GMT</pubDate>
      <category>06/13/2013</category>
    </item>
    <item>
      <title><![CDATA[U.S.31 Lane Restrictions Near Austin (6/13/2013 - 6/14/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105643&amp;information_id=182969&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/13/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;5:30 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/14/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6:25 PM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;p&gt;&lt;span style="font-family: arial, sans-serif;"&gt;AUSTIN, Ind.&amp;mdash;U.S. Highway 31 traffic patterns will be altered at two locations in the Austin area&amp;mdash;beginning Monday morning.&lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p&gt;&lt;span style="font-family: arial, sans-serif;"&gt;A culvert replacement project at the Austin Ditch will shift traffic lanes to the west side of the highway. Two lanes of traffic will be maintained&amp;mdash;one northbound, one southbound&amp;mdash;but an 11-foot width restriction is being imposed.&amp;nbsp; This work is scheduled to be complete by July 26.&lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p&gt;&lt;span style="font-family: arial, sans-serif;"&gt;Just south of the Austin Ditch (0.56 miles south of State Road 256), a district bridge project at Hutto Creek is closing one lane of U.S. 31&amp;mdash;allowing one-lane-at-a-time to cross the bridge.&amp;nbsp; Traffic movements will be controlled by a temporary signal.&amp;nbsp; One half of the bridge is being removed and rebuilt at a time.&amp;nbsp; Width restrictions are 12-feet.&amp;nbsp; Traffic restrictions are expected to continue into late September.&lt;/span&gt;&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[AUSTIN, Ind.U.S. Highway 31 traffic patterns will be altered at two locations in the Austin areabeginning Monday morning.
 
A culvert replacement project at the Austin Ditch will shift traffic lanes to the west side of the highway. Two lanes of traffic will be maintainedone northbound, one southboundbut an 11-foot width restriction is being imposed.  This work is scheduled to be complete by July 26.
 
Just south of the Austin Ditch (0.56 miles south of State Road 256), a district bridge project at Hutto Creek is closing one lane of U.S. 31allowing one-lane-at-a-time to cross the bridge.  Traffic movements will be controlled by a temporary signal.  One half of the bridge is being removed and rebuilt at a time.  Width restrictions are 12-feet.  Traffic restrictions are expected to continue into late September.]]></description>
      <pubDate>Thu, 13 Jun 2013 21:30:00 GMT</pubDate>
      <category>06/13/2013</category>
    </item>
    <item>
      <title><![CDATA[I-65 Emergency Patching W/Lane Closures (Clark CO) (6/13/2013 - 6/14/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105645&amp;information_id=182973&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/13/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;5:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/14/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;5:55 PM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;p&gt;&lt;span style="font-family: arial, sans-serif;"&gt;CLARKSVILLE, Ind.&amp;mdash;The Indiana Department of Transportation will close Interstate 65 lanes in Clark County again this weekend for emergency patching.&amp;nbsp; Closures begin at 9 p.m. Friday and continue through Saturday afternoon.&amp;nbsp; Locations are:&lt;/span&gt;&lt;/p&gt;
&lt;ul&gt;
    &lt;li&gt;&lt;span style="font-family: arial, sans-serif;"&gt;I-65 northbound right lane between mile markers 17.7 and 18.1&lt;/span&gt; &lt;/li&gt;
    &lt;li&gt;&lt;span style="font-family: arial, sans-serif;"&gt;I-65 southbound right lane between mile markers 20.0 and 18.2&lt;/span&gt; &lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p&gt;&lt;span style="font-family: arial, sans-serif;"&gt;INDOT anticipates traffic backups between 10 a.m. and 4 p.m. Saturday.&amp;nbsp; Motorists are advised to make travel plans accordingly.&amp;nbsp; U.S. Highway 31 should be a viable alternative.&amp;nbsp; It can be accessed from Exits 14, 19 and 29.&lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p&gt;&lt;span style="font-family: arial, sans-serif;"&gt;Gohmann Construction, the state&amp;rsquo;s contractor, will remove and replace sections of deteriorating pavement.&amp;nbsp; Once concrete has been poured, it takes about 20 hours for curing before traffic can be returned to the lanes.&lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p&gt;&lt;span style="font-family: arial, sans-serif;"&gt;Inclement weather could postpone the work.&amp;nbsp; &lt;/span&gt;&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[CLARKSVILLE, Ind.The Indiana Department of Transportation will close Interstate 65 lanes in Clark County again this weekend for emergency patching.  Closures begin at 9 p.m. Friday and continue through Saturday afternoon.  Locations are:

    I-65 northbound right lane between mile markers 17.7 and 18.1 
    I-65 southbound right lane between mile markers 20.0 and 18.2 

 
INDOT anticipates traffic backups between 10 a.m. and 4 p.m. Saturday.  Motorists are advised to make travel plans accordingly.  U.S. Highway 31 should be a viable alternative.  It can be accessed from Exits 14, 19 and 29.
 
Gohmann Construction, the states contractor, will remove and replace sections of deteriorating pavement.  Once concrete has been poured, it takes about 20 hours for curing before traffic can be returned to the lanes.
 
Inclement weather could postpone the work.  ]]></description>
      <pubDate>Thu, 13 Jun 2013 21:00:00 GMT</pubDate>
      <category>06/13/2013</category>
    </item>
    <item>
      <title><![CDATA[S.R. 11 Chip Seal In Bartholomew CO Next Week (6/13/2013 - 6/14/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105640&amp;information_id=182967&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/13/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;5:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/14/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;5:55 PM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;p&gt;&lt;span style="font-family: arial, sans-serif;"&gt;COLUMBUS, Ind.&amp;mdash;Indiana Department of Transportation maintenance personnel from the Columbus Subdistrict are scheduled to chip seal State Road 11 south of Columbus next week.&amp;nbsp; Flaggers will direct motorists around moving worksites.&lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p&gt;&lt;span style="font-family: arial, sans-serif;"&gt;Beginning Tuesday morning&amp;mdash;weather permitting&amp;mdash;INDOT crews will chip seal 16.2 lane miles of S.R. 11 from the I-65 off-ramp at mile marker 55.0 (Cypress Lake) north to C.R. 450 South (Southern Crossing).&amp;nbsp; This surface treatment operation should continue through Tuesday.&lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p&gt;&lt;span style="font-family: arial, sans-serif;"&gt;First, liquid asphalt will be applied to the roadway.&amp;nbsp; Then, small chips of limestone aggregate will be placed on top.&amp;nbsp; This seals the pavement against moisture and ultraviolet rays, extending service life&amp;mdash;and it restores surface friction, improving skid resistance.&amp;nbsp;&amp;nbsp; &lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p&gt;&lt;span style="font-family: arial, sans-serif;"&gt;On Wednesday, crews will retrace the S.R. 11 route&amp;mdash;applying fog seal.&amp;nbsp; Fog seal further seals the roadway from moisture and secures loose aggregate while dampening dust.&lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p&gt;&lt;span style="font-family: arial, sans-serif;"&gt;This kind of pavement preservation procedure is extremely cost-effective.&amp;nbsp; Studies show that every $1 spent on chip seal applications saves $10 in road repairs.&lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p&gt;&lt;span style="font-family: arial, sans-serif;"&gt;INDOT strongly advises motorists to drive with caution on roads where chip seal is being applied.&amp;nbsp; Tires can kick up freshly sprayed asphalt and loose stone which might cause damage to vehicles. &lt;/span&gt;&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[COLUMBUS, Ind.Indiana Department of Transportation maintenance personnel from the Columbus Subdistrict are scheduled to chip seal State Road 11 south of Columbus next week.  Flaggers will direct motorists around moving worksites.
 
Beginning Tuesday morningweather permittingINDOT crews will chip seal 16.2 lane miles of S.R. 11 from the I-65 off-ramp at mile marker 55.0 (Cypress Lake) north to C.R. 450 South (Southern Crossing).  This surface treatment operation should continue through Tuesday.
 
First, liquid asphalt will be applied to the roadway.  Then, small chips of limestone aggregate will be placed on top.  This seals the pavement against moisture and ultraviolet rays, extending service lifeand it restores surface friction, improving skid resistance.   
 
On Wednesday, crews will retrace the S.R. 11 routeapplying fog seal.  Fog seal further seals the roadway from moisture and secures loose aggregate while dampening dust.
 
This kind of pavement preservation procedure is extremely cost-effective.  Studies show that every $1 spent on chip seal applications saves $10 in road repairs.
 
INDOT strongly advises motorists to drive with caution on roads where chip seal is being applied.  Tires can kick up freshly sprayed asphalt and loose stone which might cause damage to vehicles. ]]></description>
      <pubDate>Thu, 13 Jun 2013 21:00:00 GMT</pubDate>
      <category>06/13/2013</category>
    </item>
    <item>
      <title><![CDATA[Tipton Subdistrict CHIP SEAL Next Week (6/13/2013 - 6/14/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105637&amp;information_id=182965&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/13/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;5:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/14/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;5:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;p&gt;&lt;span style="line-height: 115%; font-family: arial, sans-serif; font-size: 12pt;"&gt;TIPTON, Ind.&amp;mdash;Maintenance crews from the Tipton Subdistrict&amp;mdash;working 12&amp;frac12; hour days&amp;mdash;are scheduled to chip seal portions of two area highways next week, weather permitting.&amp;nbsp; &lt;/span&gt;&lt;/p&gt;
&lt;ul&gt;
    &lt;li&gt;&lt;span style="line-height: 115%; font-family: arial, sans-serif; font-size: 12pt;"&gt;State Road 19 from S.R. 26 to S.R. 22&amp;mdash;early in the week&lt;/span&gt; &lt;/li&gt;
    &lt;li&gt;&lt;span style="line-height: 115%; font-family: arial, sans-serif; font-size: 12pt;"&gt;State Road 213 from S.R. 26 to S.R. 28&amp;mdash;midweek&lt;/span&gt; &lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p&gt;&lt;span style="line-height: 115%; font-family: arial, sans-serif; font-size: 12pt;"&gt;Friday and Saturday, a fog seal will be applied&amp;mdash;overcoating the aggregate-crusted liquid asphalt and dampening the dust.&amp;nbsp; &lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="margin: 0in 0in 10pt;"&gt;&lt;span style="line-height: 115%; font-family: arial, sans-serif; font-size: 12pt;"&gt;During next week&amp;rsquo;s pavement preservation operation, motorists will be directed around moving worksites by flaggers.&lt;/span&gt;&lt;/p&gt;
&lt;p style="margin: 0in 0.3in 0pt 0in;"&gt;&lt;span style="font-family: arial, sans-serif;"&gt;Chip seal surface treatments are cost effective ways to protect roadbeds from moisture intrusion and ultra-violet degradation while restoring surface friction for added safety.&amp;nbsp; Studies show that every $1 invested in chip sealing results in $10 savings through reduced road repairs and extended service life.&amp;nbsp; &lt;/span&gt;&lt;/p&gt;
&lt;p style="margin: 0in 0.3in 0pt 0in;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;span style="font-family: arial, sans-serif; font-size: 12pt;"&gt;INDOT cautions motorist traveling through areas where liquid asphalt and loose stone have recently been applied to drive with extra care and slower speeds.&amp;nbsp; &lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[TIPTON, Ind.Maintenance crews from the Tipton Subdistrictworking 12 hour daysare scheduled to chip seal portions of two area highways next week, weather permitting.  

    State Road 19 from S.R. 26 to S.R. 22early in the week 
    State Road 213 from S.R. 26 to S.R. 28midweek 

 
Friday and Saturday, a fog seal will be appliedovercoating the aggregate-crusted liquid asphalt and dampening the dust.  
 
During next weeks pavement preservation operation, motorists will be directed around moving worksites by flaggers.
Chip seal surface treatments are cost effective ways to protect roadbeds from moisture intrusion and ultra-violet degradation while restoring surface friction for added safety.  Studies show that every $1 invested in chip sealing results in $10 savings through reduced road repairs and extended service life.  
 
INDOT cautions motorist traveling through areas where liquid asphalt and loose stone have recently been applied to drive with extra care and slower speeds.  ]]></description>
      <pubDate>Thu, 13 Jun 2013 21:00:00 GMT</pubDate>
      <category>06/13/2013</category>
    </item>
    <item>
      <title><![CDATA[S.R. 1 Wayne County Intersection Repairs (6/13/2013 - 6/14/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105636&amp;information_id=182963&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/13/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;4:30 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/14/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;4:30 PM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;p style="line-height: 115%;"&gt;&lt;span style="font-family: arial, sans-serif;"&gt;CAMBRIDGE CITY, Ind.&amp;mdash;The Indiana Department of Transportation plans to make repairs along State Road 1 in western Wayne County starting Friday (JUNE 14), weather permitting.&amp;nbsp; Motorists will be directed around S.R. 1 worksites at U.S. 40, S.R. 38 and S.R. 35 by flaggers and lighted arrow boards.&amp;nbsp; Delays should be minimal.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="font-family: arial, sans-serif;"&gt;Milestone, the state&amp;rsquo;s contractor, is charged with completing patching and pavement work at the three S.R. 1 intersections by July 1.&amp;nbsp; &lt;/span&gt;&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[CAMBRIDGE CITY, Ind.The Indiana Department of Transportation plans to make repairs along State Road 1 in western Wayne County starting Friday (JUNE 14), weather permitting.  Motorists will be directed around S.R. 1 worksites at U.S. 40, S.R. 38 and S.R. 35 by flaggers and lighted arrow boards.  Delays should be minimal.
 
Milestone, the states contractor, is charged with completing patching and pavement work at the three S.R. 1 intersections by July 1.  ]]></description>
      <pubDate>Thu, 13 Jun 2013 20:30:00 GMT</pubDate>
      <category>06/13/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT - Northeast] Southbound I-69 Lane Restrictions South of US 20 Until June 21 (6/13/2013 - 6/21/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105823&amp;information_id=182989&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/13/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;All Day&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/21/2013&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;br /&gt;Steuben County&lt;br /&gt;&lt;br /&gt;&lt;strong&gt;STEUBEN COUNTY, Ind.&lt;/strong&gt; &amp;ndash; The Indiana Department of Transportation (INDOT) announces southbound I-69 will be intermittently restricted between Exit 348 (US 20) and Exit 340 (SR 4), beginning today, until Friday, June 21, weather permitting. Motorists should be aware of traffic controls including barrels, cones and arrow boards while the work is in progress. There is a 45 mph speed limit within the construction zone when workers are present. There also is a width limit of 14 feet within the project limits. Work will be performed daily, between 7 a.m. and 4 p.m. &lt;br /&gt;
&lt;br /&gt;
INDOT is performing proactive bridge maintenance work over Pigeon Creek, approximately 2 &amp;frac34; miles south of US 20. The work is part of a multi-location bridge maintenance contract, with work taking place in upcoming months throughout the INDOT Fort Wayne District. The contract was awarded to R. L. McCoy, based on the low bid of $627,000. &lt;br /&gt;
&lt;br /&gt;
INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone. For the latest news and information about INDOT, visit &lt;a href="http://www.in.gov/indot"&gt;www.in.gov/indot&lt;/a&gt;. You can find traffic restriction information at &lt;a href="http://www.trafficwise.IN.gov"&gt;www.trafficwise.IN.gov&lt;/a&gt;. Contact the Fort Wayne District toll free at 866-227-3555. &lt;br /&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[STEUBEN COUNTY, Ind.  The Indiana Department of Transportation (INDOT) announces southbound I-69 will be intermittently restricted between Exit 348 (US 20) and Exit 340 (SR 4), beginning today, until Friday, June 21, weather permitting. Motorists should be aware of traffic controls including barrels, cones and arrow boards while the work is in progress. There is a 45 mph speed limit within the construction zone when workers are present. There also is a width limit of 14 feet within the project limits. Work will be performed daily, between 7 a.m. and 4 p.m. 

INDOT is performing proactive bridge maintenance work over Pigeon Creek, approximately 2  miles south of US 20. The work is part of a multi-location bridge maintenance contract, with work taking place in upcoming months throughout the INDOT Fort Wayne District. The contract was awarded to R. L. McCoy, based on the low bid of $627,000. 

INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone. For the latest news and information about INDOT, visit www.in.gov/indot. You can find traffic restriction information at www.trafficwise.IN.gov. Contact the Fort Wayne District toll free at 866-227-3555. ]]></description>
      <pubDate>Thu, 13 Jun 2013 04:00:00 GMT</pubDate>
      <category>06/13/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT - East Central] Operation Indy Commute I-69 Lane Restrictions (6/12/2013 - 6/13/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=104933&amp;information_id=182743&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/12/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;8:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/13/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;p style="text-align: center; line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;Contractors Removing Shoulder, &lt;br /&gt;
&lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;Beginning Subgrade Treatment &lt;br /&gt;
&lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;For Added Travel Lane on I-69&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;FISHERS, Ind.&lt;/span&gt;&lt;/b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt; &amp;ndash; Indiana Department of Transportation (INDOT) contractors are planning overnight lane restrictions this week as part of Operation Indy Commute &amp;ndash; I-69.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Rieth-Riley Construction, the INDOT contractor for the $11 million added travel lanes project, plans to remove shoulder pavement tonight, Tuesday and Wednesday nights along the southbound median of I-69. The milling will require a northbound left lane restriction between 96&lt;sup&gt;th&lt;/sup&gt; Street (Exit 203) and 116&lt;sup&gt;th&lt;/sup&gt; Street (Exit 205) beginning at 8 p.m. and ending by 6 a.m.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Contractors are also planning southbound left lane restrictions between 116&lt;sup&gt;th&lt;/sup&gt; Street and 96&lt;sup&gt;th&lt;/sup&gt; Street to begin subgrade treatment on Thursday and Friday nights from 8 p.m. to 6 a.m. &lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Rieth-Riley is removing the median shoulder of southbound I-69 to construct an added travel lane between 116&lt;sup&gt;th&lt;/sup&gt; Street and I-465. Auxiliary lanes will be built to connect northbound and southbound interchange ramps between 116&lt;sup&gt;th&lt;/sup&gt;, 96&lt;sup&gt;th&lt;/sup&gt; and 82&lt;sup&gt;nd&lt;/sup&gt; streets. All improvements are expected to be complete by the end of this year.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;For more information about Operation Indy Commute &amp;ndash; I-69, and to sign up to receive updates throughout the project, visit &lt;a href="http://www.indycommute.indot.in.gov/"&gt;www.IndyCommute.indot.in.gov&lt;/a&gt;. For construction updates, photos and more via social media, &amp;ldquo;like&amp;rdquo; the &lt;a href="http://www.facebook.com/INDOTEastCentral"&gt;Indiana Department of Transportation:&amp;nbsp; East Central&lt;/a&gt; Facebook page and follow &lt;a href="http://www.twitter.com/INDOT_ECentral"&gt;@INDOT_ECentral&lt;/a&gt; on Twitter. &lt;/span&gt;&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[Contractors Removing Shoulder, 
Beginning Subgrade Treatment 
For Added Travel Lane on I-69
FISHERS, Ind.  Indiana Department of Transportation (INDOT) contractors are planning overnight lane restrictions this week as part of Operation Indy Commute  I-69.
Rieth-Riley Construction, the INDOT contractor for the $11 million added travel lanes project, plans to remove shoulder pavement tonight, Tuesday and Wednesday nights along the southbound median of I-69. The milling will require a northbound left lane restriction between 96th Street (Exit 203) and 116th Street (Exit 205) beginning at 8 p.m. and ending by 6 a.m.
Contractors are also planning southbound left lane restrictions between 116th Street and 96th Street to begin subgrade treatment on Thursday and Friday nights from 8 p.m. to 6 a.m. 
Rieth-Riley is removing the median shoulder of southbound I-69 to construct an added travel lane between 116th Street and I-465. Auxiliary lanes will be built to connect northbound and southbound interchange ramps between 116th, 96th and 82nd streets. All improvements are expected to be complete by the end of this year.
For more information about Operation Indy Commute  I-69, and to sign up to receive updates throughout the project, visit www.IndyCommute.indot.in.gov. For construction updates, photos and more via social media, like the Indiana Department of Transportation:  East Central Facebook page and follow @INDOT_ECentral on Twitter. ]]></description>
      <pubDate>Thu, 13 Jun 2013 00:00:00 GMT</pubDate>
      <category>06/12/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT] U.S. 12/U.S. 20 Closure at Railroad Crossing, Gary (6/12/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105298&amp;information_id=182821&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/12/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;12:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/12/2013&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;br /&gt;Lake County&lt;br /&gt;&lt;br /&gt;&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;GARY, Ind. &amp;ndash; The Indiana Department of Transportation (INDOT) announces the closure of U.S. 12/U.S. 20 at the railroad crossing a half mile west of the I-65 interchange beginning Monday, June 17&lt;sup&gt;th&lt;/sup&gt; through Friday, June 21&lt;sup&gt;st&lt;/sup&gt;. Crews will be repairing the railroad crossing.&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;&lt;o:p _rdEditor_exists="1"&gt;&amp;nbsp;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;Drivers wishing to travel west on U.S. 12/20 will follow a detour south on I-65, west on I-80/94, north on SR 53, and back to U.S. 12/20. Drivers wishing to travel east on U.S. 12/20 will travel south on SR 53, east on I-80/94, north on I-65, and back to U.S. 12/20.&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;&lt;o:p _rdEditor_exists="1"&gt;&amp;nbsp;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone. For the latest road closures and news from INDOT, like us at &lt;a href="http://www.facebook.com/INDOTNorthwest"&gt;&lt;span style="color: #0000ff;"&gt;www.Facebook.com/INDOTNorthwest&lt;/span&gt;&lt;/a&gt; and follow us at &lt;a href="http://www.twitter.com/INDOTNorthwest"&gt;&lt;span style="color: #0000ff;"&gt;www.Twitter.com/INDOTNorthwest&lt;/span&gt;&lt;/a&gt;.&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;&lt;o:p _rdEditor_exists="1"&gt;&amp;nbsp;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;You can find traffic restriction information at &lt;a href="http://www.trafficwise.in.gov/"&gt;&lt;span style="color: #0000ff;"&gt;www.trafficwise.IN.gov&lt;/span&gt;&lt;/a&gt;.&amp;nbsp; Contact the LaPorte District toll free at 1-855-GO-INDOT.&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[GARY, Ind.  The Indiana Department of Transportation (INDOT) announces the closure of U.S. 12/U.S. 20 at the railroad crossing a half mile west of the I-65 interchange beginning Monday, June 17th through Friday, June 21st. Crews will be repairing the railroad crossing.
 
Drivers wishing to travel west on U.S. 12/20 will follow a detour south on I-65, west on I-80/94, north on SR 53, and back to U.S. 12/20. Drivers wishing to travel east on U.S. 12/20 will travel south on SR 53, east on I-80/94, north on I-65, and back to U.S. 12/20.
 
INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone. For the latest road closures and news from INDOT, like us at www.Facebook.com/INDOTNorthwest and follow us at www.Twitter.com/INDOTNorthwest.
 
You can find traffic restriction information at www.trafficwise.IN.gov.  Contact the LaPorte District toll free at 1-855-GO-INDOT.]]></description>
      <pubDate>Wed, 12 Jun 2013 04:00:01 GMT</pubDate>
      <category>06/12/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT] US 20 Restrictions in New Carlisle, St. Joseph County (6/12/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105297&amp;information_id=182819&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/12/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;12:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/12/2013&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;br /&gt;LaPorte County&lt;br /&gt;&lt;br /&gt;St. Joseph County&lt;br /&gt;&lt;br /&gt;&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;NEW CARLISLE, Ind. &amp;ndash; The Indiana Department of Transportation (INDOT) announces lane restrictions and traffic shifts on U.S. 20 in the town of New Carlisle, between Jon Street and Race Street, beginning Monday, June 17&lt;sup&gt;th&lt;/sup&gt; through October 2013. Crews will be making streetscape improvements for this city project.&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;&lt;o:p _rdEditor_exists="1"&gt;&amp;nbsp;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone. For the latest road closures and news from INDOT, like us at &lt;a href="http://www.facebook.com/INDOTNorthwest"&gt;&lt;span style="color: #0000ff;"&gt;www.Facebook.com/INDOTNorthwest&lt;/span&gt;&lt;/a&gt; and follow us at &lt;a href="http://www.twitter.com/INDOTNorthwest"&gt;&lt;span style="color: #0000ff;"&gt;www.Twitter.com/INDOTNorthwest&lt;/span&gt;&lt;/a&gt;.&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;&lt;o:p _rdEditor_exists="1"&gt;&amp;nbsp;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;You can find traffic restriction information at &lt;a href="http://www.trafficwise.in.gov/"&gt;&lt;span style="color: #0000ff;"&gt;www.trafficwise.IN.gov&lt;/span&gt;&lt;/a&gt;.&amp;nbsp; Contact the LaPorte District toll free at 1-855-GO-INDOT.&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[NEW CARLISLE, Ind.  The Indiana Department of Transportation (INDOT) announces lane restrictions and traffic shifts on U.S. 20 in the town of New Carlisle, between Jon Street and Race Street, beginning Monday, June 17th through October 2013. Crews will be making streetscape improvements for this city project.
 
INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone. For the latest road closures and news from INDOT, like us at www.Facebook.com/INDOTNorthwest and follow us at www.Twitter.com/INDOTNorthwest.
 
You can find traffic restriction information at www.trafficwise.IN.gov.  Contact the LaPorte District toll free at 1-855-GO-INDOT.]]></description>
      <pubDate>Wed, 12 Jun 2013 04:00:01 GMT</pubDate>
      <category>06/12/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT - Northeast] SR 5 Closed between US 24 and SR 16 near Huntington for Small Structure Replacement (6/12/2013 - 6/17/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105822&amp;information_id=182987&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/12/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;All Day&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/17/2013&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;br /&gt;Huntington County&lt;br /&gt;&lt;br /&gt;&lt;strong&gt;HUNTINGTON, Ind.&lt;/strong&gt; &amp;ndash; The Indiana Department of Transportation (INDOT) announces that SR 5 at CR 500N, between US 24 and SR 16, north of Huntington, is closed to accommodate replacement of a small structure over Clear Creek. &lt;br /&gt;
&lt;br /&gt;
The detour is US 24 to SR 9 to SR 114 to SR 5. The road is expected to re-open in late July, weather permitting. &lt;br /&gt;
&lt;br /&gt;
The contract for the project was awarded to Brooks Construction, based on the low bid of $599,000. &lt;br /&gt;
&lt;br /&gt;
INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone. For the latest news and information about INDOT, visit &lt;a href="http://www.in.gov/indot"&gt;www.in.gov/indot&lt;/a&gt;. You can find traffic restriction information at &lt;a href="http://www.trafficwise.IN.gov"&gt;www.trafficwise.IN.gov&lt;/a&gt;. Contact the Fort Wayne District toll free at 866-227-3555. &lt;br /&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[HUNTINGTON, Ind.  The Indiana Department of Transportation (INDOT) announces that SR 5 at CR 500N, between US 24 and SR 16, north of Huntington, is closed to accommodate replacement of a small structure over Clear Creek. 

The detour is US 24 to SR 9 to SR 114 to SR 5. The road is expected to re-open in late July, weather permitting. 

The contract for the project was awarded to Brooks Construction, based on the low bid of $599,000. 

INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone. For the latest news and information about INDOT, visit www.in.gov/indot. You can find traffic restriction information at www.trafficwise.IN.gov. Contact the Fort Wayne District toll free at 866-227-3555. ]]></description>
      <pubDate>Wed, 12 Jun 2013 04:00:00 GMT</pubDate>
      <category>06/12/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT - East Central] Operation Indy Commute I-69 Lane Restrictions (6/11/2013 - 6/12/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=104933&amp;information_id=182742&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/11/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;8:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/12/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;p style="text-align: center; line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;Contractors Removing Shoulder, &lt;br /&gt;
&lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;Beginning Subgrade Treatment &lt;br /&gt;
&lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;For Added Travel Lane on I-69&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;FISHERS, Ind.&lt;/span&gt;&lt;/b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt; &amp;ndash; Indiana Department of Transportation (INDOT) contractors are planning overnight lane restrictions this week as part of Operation Indy Commute &amp;ndash; I-69.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Rieth-Riley Construction, the INDOT contractor for the $11 million added travel lanes project, plans to remove shoulder pavement tonight, Tuesday and Wednesday nights along the southbound median of I-69. The milling will require a northbound left lane restriction between 96&lt;sup&gt;th&lt;/sup&gt; Street (Exit 203) and 116&lt;sup&gt;th&lt;/sup&gt; Street (Exit 205) beginning at 8 p.m. and ending by 6 a.m.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Contractors are also planning southbound left lane restrictions between 116&lt;sup&gt;th&lt;/sup&gt; Street and 96&lt;sup&gt;th&lt;/sup&gt; Street to begin subgrade treatment on Thursday and Friday nights from 8 p.m. to 6 a.m. &lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Rieth-Riley is removing the median shoulder of southbound I-69 to construct an added travel lane between 116&lt;sup&gt;th&lt;/sup&gt; Street and I-465. Auxiliary lanes will be built to connect northbound and southbound interchange ramps between 116&lt;sup&gt;th&lt;/sup&gt;, 96&lt;sup&gt;th&lt;/sup&gt; and 82&lt;sup&gt;nd&lt;/sup&gt; streets. All improvements are expected to be complete by the end of this year.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;For more information about Operation Indy Commute &amp;ndash; I-69, and to sign up to receive updates throughout the project, visit &lt;a href="http://www.indycommute.indot.in.gov/"&gt;www.IndyCommute.indot.in.gov&lt;/a&gt;. For construction updates, photos and more via social media, &amp;ldquo;like&amp;rdquo; the &lt;a href="http://www.facebook.com/INDOTEastCentral"&gt;Indiana Department of Transportation:&amp;nbsp; East Central&lt;/a&gt; Facebook page and follow &lt;a href="http://www.twitter.com/INDOT_ECentral"&gt;@INDOT_ECentral&lt;/a&gt; on Twitter. &lt;/span&gt;&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[Contractors Removing Shoulder, 
Beginning Subgrade Treatment 
For Added Travel Lane on I-69
FISHERS, Ind.  Indiana Department of Transportation (INDOT) contractors are planning overnight lane restrictions this week as part of Operation Indy Commute  I-69.
Rieth-Riley Construction, the INDOT contractor for the $11 million added travel lanes project, plans to remove shoulder pavement tonight, Tuesday and Wednesday nights along the southbound median of I-69. The milling will require a northbound left lane restriction between 96th Street (Exit 203) and 116th Street (Exit 205) beginning at 8 p.m. and ending by 6 a.m.
Contractors are also planning southbound left lane restrictions between 116th Street and 96th Street to begin subgrade treatment on Thursday and Friday nights from 8 p.m. to 6 a.m. 
Rieth-Riley is removing the median shoulder of southbound I-69 to construct an added travel lane between 116th Street and I-465. Auxiliary lanes will be built to connect northbound and southbound interchange ramps between 116th, 96th and 82nd streets. All improvements are expected to be complete by the end of this year.
For more information about Operation Indy Commute  I-69, and to sign up to receive updates throughout the project, visit www.IndyCommute.indot.in.gov. For construction updates, photos and more via social media, like the Indiana Department of Transportation:  East Central Facebook page and follow @INDOT_ECentral on Twitter. ]]></description>
      <pubDate>Wed, 12 Jun 2013 00:00:00 GMT</pubDate>
      <category>06/11/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT] SR 152 Lane Restrictions Begin, Hammond, Lake County (6/11/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=105149&amp;information_id=182777&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/11/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;12:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/11/2013&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;br /&gt;Lake County&lt;br /&gt;&lt;br /&gt;&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;HAMMOND, Ind. &amp;ndash; The Indiana Department of Transportation (INDOT) announces lane restrictions on State Road 152 in Hammond, between 165&lt;sup&gt;th&lt;/sup&gt; Street and 169&lt;sup&gt;th&lt;/sup&gt; Street beginning Thursday, June 13&lt;sup&gt;th&lt;/sup&gt; through November 2013. Crews are resurfacing the roadway. One lane in each direction on State Road 152 will be maintained throughout the project.&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;&lt;o:p _rdEditor_exists="1"&gt;&amp;nbsp;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone. For the latest road closures and news from INDOT, like us at &lt;a href="http://www.facebook.com/INDOTNorthwest"&gt;&lt;span style="color: #0000ff;"&gt;www.Facebook.com/INDOTNorthwest&lt;/span&gt;&lt;/a&gt; and follow us at &lt;a href="http://www.twitter.com/INDOTNorthwest"&gt;&lt;span style="color: #0000ff;"&gt;www.Twitter.com/INDOTNorthwest&lt;/span&gt;&lt;/a&gt;.&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;&lt;o:p _rdEditor_exists="1"&gt;&amp;nbsp;&lt;/o:p&gt;&lt;/p&gt;
&lt;p class="MsoNormal" style="margin: 0in 0in 0pt;"&gt;You can find traffic restriction information at &lt;a href="http://www.trafficwise.in.gov/"&gt;&lt;span style="color: #0000ff;"&gt;www.trafficwise.IN.gov&lt;/span&gt;&lt;/a&gt;.&amp;nbsp; Contact the LaPorte District toll free at 1-855-GO-INDOT.&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[HAMMOND, Ind.  The Indiana Department of Transportation (INDOT) announces lane restrictions on State Road 152 in Hammond, between 165th Street and 169th Street beginning Thursday, June 13th through November 2013. Crews are resurfacing the roadway. One lane in each direction on State Road 152 will be maintained throughout the project.
 
INDOT reminds drivers to use caution and consider worker safety when driving through a construction zone. For the latest road closures and news from INDOT, like us at www.Facebook.com/INDOTNorthwest and follow us at www.Twitter.com/INDOTNorthwest.
 
You can find traffic restriction information at www.trafficwise.IN.gov.  Contact the LaPorte District toll free at 1-855-GO-INDOT.]]></description>
      <pubDate>Tue, 11 Jun 2013 04:00:01 GMT</pubDate>
      <category>06/11/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT - East Central] Operation Indy Commute I-69 Lane Restrictions (6/10/2013 - 6/11/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=104933&amp;information_id=182741&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/10/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;8:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/11/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;p style="text-align: center; line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;Contractors Removing Shoulder, &lt;br /&gt;
&lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;Beginning Subgrade Treatment &lt;br /&gt;
&lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;For Added Travel Lane on I-69&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;FISHERS, Ind.&lt;/span&gt;&lt;/b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt; &amp;ndash; Indiana Department of Transportation (INDOT) contractors are planning overnight lane restrictions this week as part of Operation Indy Commute &amp;ndash; I-69.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Rieth-Riley Construction, the INDOT contractor for the $11 million added travel lanes project, plans to remove shoulder pavement tonight, Tuesday and Wednesday nights along the southbound median of I-69. The milling will require a northbound left lane restriction between 96&lt;sup&gt;th&lt;/sup&gt; Street (Exit 203) and 116&lt;sup&gt;th&lt;/sup&gt; Street (Exit 205) beginning at 8 p.m. and ending by 6 a.m.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Contractors are also planning southbound left lane restrictions between 116&lt;sup&gt;th&lt;/sup&gt; Street and 96&lt;sup&gt;th&lt;/sup&gt; Street to begin subgrade treatment on Thursday and Friday nights from 8 p.m. to 6 a.m. &lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Rieth-Riley is removing the median shoulder of southbound I-69 to construct an added travel lane between 116&lt;sup&gt;th&lt;/sup&gt; Street and I-465. Auxiliary lanes will be built to connect northbound and southbound interchange ramps between 116&lt;sup&gt;th&lt;/sup&gt;, 96&lt;sup&gt;th&lt;/sup&gt; and 82&lt;sup&gt;nd&lt;/sup&gt; streets. All improvements are expected to be complete by the end of this year.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;For more information about Operation Indy Commute &amp;ndash; I-69, and to sign up to receive updates throughout the project, visit &lt;a href="http://www.indycommute.indot.in.gov/"&gt;www.IndyCommute.indot.in.gov&lt;/a&gt;. For construction updates, photos and more via social media, &amp;ldquo;like&amp;rdquo; the &lt;a href="http://www.facebook.com/INDOTEastCentral"&gt;Indiana Department of Transportation:&amp;nbsp; East Central&lt;/a&gt; Facebook page and follow &lt;a href="http://www.twitter.com/INDOT_ECentral"&gt;@INDOT_ECentral&lt;/a&gt; on Twitter. &lt;/span&gt;&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[Contractors Removing Shoulder, 
Beginning Subgrade Treatment 
For Added Travel Lane on I-69
FISHERS, Ind.  Indiana Department of Transportation (INDOT) contractors are planning overnight lane restrictions this week as part of Operation Indy Commute  I-69.
Rieth-Riley Construction, the INDOT contractor for the $11 million added travel lanes project, plans to remove shoulder pavement tonight, Tuesday and Wednesday nights along the southbound median of I-69. The milling will require a northbound left lane restriction between 96th Street (Exit 203) and 116th Street (Exit 205) beginning at 8 p.m. and ending by 6 a.m.
Contractors are also planning southbound left lane restrictions between 116th Street and 96th Street to begin subgrade treatment on Thursday and Friday nights from 8 p.m. to 6 a.m. 
Rieth-Riley is removing the median shoulder of southbound I-69 to construct an added travel lane between 116th Street and I-465. Auxiliary lanes will be built to connect northbound and southbound interchange ramps between 116th, 96th and 82nd streets. All improvements are expected to be complete by the end of this year.
For more information about Operation Indy Commute  I-69, and to sign up to receive updates throughout the project, visit www.IndyCommute.indot.in.gov. For construction updates, photos and more via social media, like the Indiana Department of Transportation:  East Central Facebook page and follow @INDOT_ECentral on Twitter. ]]></description>
      <pubDate>Tue, 11 Jun 2013 00:00:00 GMT</pubDate>
      <category>06/10/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT - East Central] INDOT Blood Drive at Cambridge City Subdistrict (6/10/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=104253&amp;information_id=182665&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/10/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;11:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/10/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;3:00 PM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;p style="text-align: center; line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 16pt;"&gt;Donors Needed at INDOT &lt;br /&gt;
Blood Drive June 10th&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;CAMBRIDGE CITY, Ind. &amp;ndash; The Indiana Department of Transportation (INDOT) Cambridge City Subdistrict is hosting its second annual blood drive with the Community Blood Center.&amp;nbsp; In addition to saving lives, all donors will also receive a &amp;ldquo;King of the Road&amp;rdquo; t-shirt and be entered to win a Harley Davidson Road King motorcycle as part of the Community Blood Center&amp;rsquo;s summer campaign.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;WHAT:&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp; 2&lt;sup&gt;nd&lt;/sup&gt; annual blood drive at INDOT Cambridge City Subdistrict &lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;WHEN:&amp;nbsp; &amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp; Monday, June 10 from 11 a.m. to 3 p.m.&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;WHERE: &amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp; Indiana Department of Transportation (INDOT) Cambridge City Subdistrict&lt;br /&gt;
&lt;/span&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp; 1241 S. State Road 1 (U.S. 40 and State Road 1)&lt;/span&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&lt;span style="line-height: 115%; font-family: times new roman, serif; font-size: 12pt;"&gt;Please go online to &lt;a href="http://www.donortime.com/"&gt;www.donortime.com&lt;/a&gt; or call 765-962-6329 to schedule an appointment.&lt;/span&gt;&lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[Donors Needed at INDOT 
Blood Drive June 10th
CAMBRIDGE CITY, Ind.  The Indiana Department of Transportation (INDOT) Cambridge City Subdistrict is hosting its second annual blood drive with the Community Blood Center.  In addition to saving lives, all donors will also receive a King of the Road t-shirt and be entered to win a Harley Davidson Road King motorcycle as part of the Community Blood Centers summer campaign.
WHAT:           2nd annual blood drive at INDOT Cambridge City Subdistrict 
WHEN:           Monday, June 10 from 11 a.m. to 3 p.m.
WHERE:         Indiana Department of Transportation (INDOT) Cambridge City Subdistrict
                        1241 S. State Road 1 (U.S. 40 and State Road 1)
Please go online to www.donortime.com or call 765-962-6329 to schedule an appointment.]]></description>
      <pubDate>Mon, 10 Jun 2013 15:00:00 GMT</pubDate>
      <category>06/10/2013</category>
    </item>
    <item>
      <title><![CDATA[[INDOT - Southwest] Crack Down Continues on Wabash Bridge Toll Violations (6/10/2013)]]></title>
      <link>http://www.in.gov/activecalendar/EventList.aspx?view=EventDetails&amp;eventidn=104883&amp;information_id=182729&amp;type=&amp;rss=rss</link>
      <content:encoded>&lt;table cellpadding="5" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td valign="top"&gt;&lt;table cellpadding="0" cellspacing="0" border="0"&gt;&lt;tr&gt;&lt;td style="padding-bottom:1px;"&gt;&lt;b&gt;Start Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td style="padding-bottom:1px;"&gt;6/10/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;Start Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;12:00 AM&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;End Date:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;6/10/2013&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;End Time:&lt;/b&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;11:59 PM&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;p style="text-align: center; line-height: 115%;"&gt;&lt;b&gt;&lt;span style="line-height: 115%; font-size: 16pt;"&gt;Crack Down Continues on Wabash Bridge Toll Violations&lt;/span&gt;&lt;/b&gt;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;MT. VERNON, Ind. &amp;ndash; The Indiana Department of Transportation (INDOT) continues to crack down on toll violators on the Wabash Memorial Toll Bridge. Thus far 30 drivers have been summoned to Posey County Traffic Court and face fines and court costs in addition to back tolls owed.&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;Each time drivers cross the Wabash Bridge without paying a toll, they are committing a Class C traffic infraction punishable with $220 in fines and court costs. INDOT is calling habitual violators and sending certified letters in an effort to establish payment plans and avoid sending the cases to the Posey County Prosecutor. To date 63 payment plans have been established and 23 customers are now fully paid.&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;Many violators have refused to return INDOT&amp;rsquo;s calls or sign for certified letters. Time is limited for these drivers to set up a payment plan as they will be referred to the Prosecutor in the near future. Wabash Bridge users who wish to pay off outstanding balances and avoid fees and citations should call INDOT at 317-232-5385 to set up a payment plan.&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;Drivers crossing the Wabash Memorial Toll Bridge connecting Illinois 141 with Indiana 62 are required to maintain a prepaid Wabash Pass account and affix an associated transponder tag to their vehicle&amp;rsquo;s front windshield. Electronic tolls are 50 cents for cars, 30 cents for motorcycles or bicycles and $1.70 for six-axle trucks. Tolls have not been increased since 1984, and pay for continued maintenance and eventual replacement of the bridge, which opened in 1956.&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;Roadside displays have been relocated to better tell Wabash Pass account holders &amp;ldquo;Thank You&amp;rdquo; when their pre-paid account is charged or &amp;ldquo;Low Balance&amp;rdquo; when funds are running low. &lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;&amp;nbsp;&lt;/p&gt;
&lt;p style="line-height: 115%;"&gt;More information is available at &lt;a href="http://www.wabashpass.com/"&gt;www.wabashpass.com&lt;/a&gt;. &lt;/p&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</content:encoded>
      <description><![CDATA[Crack Down Continues on Wabash Bridge Toll Violations
MT. VERNON, Ind.  The Indiana Department of Transportation (INDOT) continues to crack down on toll violators on the Wabash Memorial Toll Bridge. Thus far 30 drivers have been summoned to Posey County Traffic Court and face fines and court costs in addition to back tolls owed.
 
Each time drivers cross the Wabash Bridge without paying a toll, they are committing a Class C traffic infraction punishable with $220 in fines and court costs. INDOT is calling habitual violators and sending certified letters in an effort to establish payment plans and avoid sending the cases to the Posey County Prosecutor. To date 63 payment plans have been established and 23 customers are now fully paid.
 
Many violators have refused to return INDOTs calls or sign for certified letters. Time is limited for these drivers to set up a payment plan as they will be referred to the Prosecutor in the near future. Wabash Bridge users who wish to pay off outstanding balances and avoid fees and citations should call INDOT at 317-232-5385 to set up a payment plan.
 
Drivers crossing the Wabash Memorial Toll Bridge connecting Illinois 141 with Indiana 62 are required to maintain a prepaid Wabash Pass account and affix an associated transponder tag to their vehicles front windshield. Electronic tolls are 50 cents for cars, 30 cents for motorcycles or bicycles and $1.70 for six-axle trucks. Tolls have not been increased since 1984, and pay for continued maintenance and eventual replacement of the bridge, which opened in 1956.
 
Roadside displays have been relocated to better tell Wabash Pass account holders Thank You when their pre-paid account is charged or Low Balance when funds are running low. 
 
More information is available at www.wabashpass.com. ]]></description>
      <pubDate>Mon, 10 Jun 2013 04:00:01 GMT</pubDate>
      <category>06/10/2013</category>
    </item>
  </channel>
</rss>